NIST B226 Replace HVAC Final Submission Dwgs.pdf
PDF 3 MB Posted
- Attached to
- Install ACU unit in several buildings Federal contract opportunity
- Solicitation number
- 1333ND25RNB190003
About this file
This file contains mechanical and electrical engineering drawings for replacing HVAC equipment in Building 226 at the National Institute of Standards and Technology (NIST) in Gaithersburg, MD. The drawings detail the replacement of three air conditioning units (ACU-12, ACU-13, and ACU-14) and associated equipment including brine pumps, electric duct heaters, and control systems.
The drawings include demolition plans, new work plans, mechanical details, equipment schedules, and control diagrams. Key specifications include new ACUs with 2-inch solid double wall construction, foam-injected panels with R-30 insulation, MERV 8 washable filters, twin belt-driven fans, and stainless steel construction throughout. The control system uses DDC (Direct Digital Control) with specific sequences for temperature and dewpoint control. The project requires phased construction with only one ACU to be demolished at a time to maintain facility operations. The electrical scope includes new power connections, motor controllers, and a new panel PA-A-F26-1 to serve the equipment. All work must be coordinated with NIST COR with 21 days advance notice required for any service interruptions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 001.docx | DOCX document | |
| Guidelines for Contractors and A-E firms - March 11 2024.pdf | ||
| NIST B226 Replace HVAC 100 Submission Specs.pdf | ||
| RFI Reponses 071723.pdf | ||
| Material Inventory.pdf | ||
| Guidelines for Contractors and A-E firms - May 25 2022.docx | DOCX document | |
| FAQ Response Package 20231129.pdf | ||
| Material ID.pdf | ||
| PAYNE-NIST Sprayed Coil Liquid Defrost Air Handler SEQUENCE OF OPERATIONS 210112b.pdf | ||
| NIST B226 Replace HVAC 100 Submission BOD.pdf | ||
| md53 wage rates.txt | TXT text file | |
| OFPM Asbetos-containing-material-master-specs_-05012021_Official.docx | DOCX document | |
| FormSF1442.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
A
P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
G-001
COVER SHEET
GENERAL
226-437
CFR DWG # NIST DWG#
GENERAL
G001 226-437 COVER SHEET - GENERAL
MECHANICAL
M-001 226-438 COVER SHEET - MECHANICAL
MD-101 226-439 DEMOLITION FLOOR PLAN - MECHANICAL
M-101 226-440 NEW WORK FLOOR PLAN - MECHANICAL
M-501 226-441 DETAILS - MECHANICAL
M-502 226-442 DETAILS - MECHANICAL
M-601 226-443 SCHEDULES - MECHANICAL
M-701 226-444 CONTROLS - MECHANICAL
ELECTRICAL
E-001 226-445 COVER SHEET - ELECTRICAL
ED-100 226-446 DEMOLITION FLOOR PLAN - ELECTRICAL
E-100 226-447 NEW WORK FLOOR PLAN - ELECTRICAL
E-600 226-448 DIAGRAMS AND SCHEDULES - ELECTRICAL
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DRAWING LIST
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF COMMERCE
AutoCAD SHX Text
THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
AutoCAD SHX Text
GAITHERSBURG, MD
AutoCAD SHX Text
FINAL SUBMISSION
AutoCAD SHX Text 2021.08.20
AutoCAD SHX Text
BUILDING 226 - ACU'S 12, 13 & 14 REPLACEMENT
AutoCAD SHX Text Gaithersburg
AutoCAD SHX Text Rockville
AutoCAD SHX Text Aspen Hill
AutoCAD SHX Text Silver Spring
AutoCAD SHX Text Bethesda
AutoCAD SHX Text Washington
AutoCAD SHX Text Arlington
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Oakton
AutoCAD SHX Text Coral Hills
AutoCAD SHX Text Annandale
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text Diamond Avenue
AutoCAD SHX Text Muddy Branch Road
AutoCAD SHX Text Quince Orchard Road
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GATE "F"
AutoCAD SHX Text
GATE "E"
AutoCAD SHX Text
MUDDY BRANCH ROAD
AutoCAD SHX Text I-270
AutoCAD SHX Text
TO WASHINGTON
AutoCAD SHX Text I-270
AutoCAD SHX Text
SOUTH DRIVE
AutoCAD SHX Text
EAST DRIVE
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PIKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
CHEMICAL
AutoCAD SHX Text
COOLING TOWER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TOWNHOUSE
AutoCAD SHX Text
HERCOFORM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STATE ROAD 124
AutoCAD SHX Text
SEPARATOR
AutoCAD SHX Text
ISOTOPE
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE DRIVE
AutoCAD SHX Text
GATE "C"
AutoCAD SHX Text
AutoCAD SHX Text
CENTER DRIVE
AutoCAD SHX Text
STACK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WEST DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
QUINCE
AutoCAD SHX Text
ORCHARD
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
SUBSTATION
AutoCAD SHX Text
GATE
AutoCAD SHX Text
PEPCO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TO FREDERICK
AutoCAD SHX Text
GATE "A"
AutoCAD SHX Text
GATE "B"
AutoCAD SHX Text
BUREAU DR.
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
AutoCAD SHX Text
SOUTH DRIVE
AutoCAD SHX Text
MUDDY BRANCH ROAD
AutoCAD SHX Text
DIAMOND AVENUE WEST
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text "D"
A132
GENERAL MECHANICAL PROJECT NOTES GENERAL MECHANICAL NOTES
NEW WORK PLAN NOTE IDENTIFICATION
MECHANICAL SYMBOLS MECHANICAL ABBREVIATIONS
DEMOLITION PLAN NOTE IDENTIFICATION
POINT OF CONNECTION TO EXISTING
END OF DEMOLITION
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW WORK
PIPE TURN DOWN OR AWAY
PIPE TURN UP OR TOWARDS
ABV
ACU
AFF
AHU
APD
AIP
BAS
BHP
BLDG
BLW
BMS
BTU/H
CC
CD
CFH
CH
CHWS/R
CONT.
CV
DDC
DP
DS
DSS/R
(E)
EAT
EBT
EDH
EFF
EL
EPO
EWT
FA
FAP
FAS
FC
FD
FPI
FLA
FT
FTR
GA
GHS/R
GPM
HC
HD
HTBS/R
HWS/R
HZ
IL
IN
LAT
LBT
LD
LWT
MBH
MCA
NC
NO
OED
P
PBO
PHC
PID
(R)
RPM
SCADA
SF
SOV
SS
ST
TDH
TYP.
UH
VFD
VIF
WMS
(X)
ABOVE
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
AIR PRESSURE DROP
ABANDONED IN PLACE
BUILDING AUTOMATION SYSTEM
BRAKE OR BOILER HORSE POWER
BUILDING
BELOW
BUILDING MANAGEMENT SYSTEM
BRITISH THERMAL UNITS PER HOUR
COOLING COIL
CONDENSATE DRAIN
CUBIC FEET PER HOUR
CHILLER
CHILLED WATER SUPPLY / RETURN
CONTINUE
CONTROL VALVE
DIRECT DIGITAL CONTROL
DIFFERENTIAL PRESSURE
DISCONNECT SWITCH
DEFROST SOLUTION SUPPLY/RETURN
EXISTING TO REMAIN
ENTERING AIR TEMPERATURE
ENTERING BRINE TEMPERATURE
ELECTRIC DUCT HEATER
EFFICIENCY
EXHAUST LOUVER
EMERGENCY POWER OFF
ENTERING WATER TEMPERATURE
FIRE ALARM
FIRE ALARM PANEL
FIRE ALARM SYSTEM
FAN COIL UNIT
FLOOR DRAIN
FINS PER INCH
FULL LOAD AMPS
FEET
FINNED TUBE RADIATOR
GAUGE
GLYCOL HEATING SUPPLY/ RETURN
GALLONS PER MINUTE
HEATING COIL
HEAD
HIGH TEMPERATURE BRINE SUPPLY/ RETURN
HEATING WATER SUPPLY / RETURN
HERTZ
INTAKE LOUVER
INCH
LEAVING AIR TEMPERATURE
LEAVING BRINE TEMPERATURE
LEAK DETECTION
LEAVING WATER TEMPERATURE
BTU/H X 1000
MINIMUM CIRCUIT AMPACITY
NORMALLY CLOSED
NORMALLY OPEN
OPEN ENDED DUCT
PUMP
PROVIDE BY OTHERS
PRE-HEAT COIL
PROPORTIONAL-INTEGRAL-DERIVATIVE
RELOCATE(D)
REVOLUTIONS PER MINUTE
SUPERVISORY CONTROL AND DATA ACQUISITION
SUPPLY FAN
SHUT OFF VALVE
STAINLESS STEEL
STORM
TOTAL DYNAMIC HEAD
TYPICAL
UNIT HEATER
VARIABLE FREQUENCY DRIVE
VERIFY IN FIELD
WIRE MESH SCREEN
EXISTING TO BE REMOVED
AREA OF WORK / MATCHLINE
PIPE CAPPED
ROOM TAG
DETAIL/VIEW TITLE
DETAIL/VIEW SCALE
DETAIL/VIEW INDENTIFICATION
NEW EQUIPMENT IDENTIFICATION
SHUT-OFF VALVE
TWO-WAY CONTROL VALVE
STRAINER
FLEXIBLE PIPE CONNECTION
CHECK VALVE
BALANCING VALVES
UNION
CONCENTRIC PIPE REDUCER
DRAIN VALVE
TEST PORT
AIR VENT
ACU-12
SUPPLY PIPING
RETURN PIPING
PIPING OR DUCTWORK HIDDEN/BELOW
S. TEST WATER PIPING UNDER ACTUAL OPERATING CONDITIONS. REPAIR LEAKS AND RETURN TO SERVICE. TEST WATER PIPING AT 125 PSI FOR 2 HOURS. MAKE REPAIRS WITH NEW MATERIALS. REPLACE LEAKING MATERIALS, DO NOT REPAIR BY PATCHING.
T. ALL NEW CONSTRUCTION SHALL MATCH BUILDING STANDARD (MATERIALS, INSTALLATION METHODS AND QUALITY). ANY MAJOR DEVIATIONS SHALL REQUIRE APPROVAL OF THE ENGINEER AND/OR BUILDING GOVERNMENT PRIOR TO PROCEEDING.
U. ALL NEW CONSTRUCTION SHALL ADHERE TO THE LATEST EDITION OF THE GOVERNMENT REQUIREMENTS. ANY DEVIATIONS FOR THESE
STANDARDS WILL REQUIRE APPROVAL FROM GOVERNMENT BEFORE PROCEEDING.
V. ALL NEW AND EXISTING WALL AND FLOOR PENETRATIONS THRU FIRE RATED WALL / FLOOR SHALL BE COMPLETELY SEALED WITH AN APPROVED U.L. LISTED FIRESTOPPING MATERIAL. ALL OTHERS SHALL BE SEALED WITH CAULK
W. ALL WORK AND MATERIAL SHALL BE PROVIDED TO ACCOMPLISH THE INTENT OF THE PLANS. WORK INDICATED HAVING MINOR DETAILS
NOT SHOWN SHALL BE PROVIDED COMPLETELY TO PERFORM THE FUNCTIONS INTENDED.
X. ALL SPRINKLER HEADS AND PIPING SHALL BE RELOCATED AS NECESSARY TO PROVIDE THE REQUIRED SCOPE OF WORK. APPROVAL
FROM THE DIVISION OF FIRE MARSHALL SHALL BE OBTAIN PRIOR TO ANY WORK.
Y. THERE SHALL BE NO BULLHEADED TEES IN ANY PIPING SYSTEM. MAIN CONTROL VALVES EFFECTING THE HEATING HOT WATER SYSTEM
SHALL HAVE A MANUAL BYPASS CONTROL VALVE.
Z. UPON INITIAL STARTUP OF BRINE PIPING SYSTEM, THE CONTRACTOR SHALL ENSURE THAT THERE IS NO LIQUID WATER IN THE SYSTEM.
DO NOT USE WATER TO TEST OR FILL THE SYSTEM. ONLY DYNALENE HFLO IS ALLOWED TO BE USED IN THIS PIPING SYSTEM.
AA. PROVIDE COMMISSIONING OF HVAC SYSTEMS AND THEIR INTERCONNECTIONS WITH OTHER BUILDING SYSTEMS WITHIN THE SCOPE OF
WORK OF THIS PROJECT.
1. SCOPE: PROVIDE AND INSTALL ALL WORK, EQUIPMENT, AND MATERIALS AS INDICATED ON THE PROJECT DRAWINGS AND IN THE SPECIFICATIONS TO PROVIDE A COMPLETELY OPERATIONAL SYSTEM. THE DRAWINGS DO NOT INDICATE EVERY FITTING, ELBOW, OFFSET, VALVE, PULL BOX OR SIMILAR COMPONENTS WHICH ARE REQUIRED TO COMPLETE THE PROJECT WORK. PREPARE FIELD CONSTRUCTION DRAWINGS IF NECESSARY FOR, OR AS REQUIRED TO, INSURE PROPER INSTALLATION. PROVIDE ALL NECESSARY OFFSETS, FITTINGS, AND AUXILIARY ITEMS SUCH AS RELAYS, CONTROL MODULES, CABINETS, ETC. TO INSTALL THE SYSTEMS AS
DIAGRAMMED AT NO ADDITIONAL COST.
2. APPLICABLE CODES AND REGULATIONS: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES, REFERENCES AND REGULATIONS. THE CONTRACTOR SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES HAVING JURISDICTION AND OF THE PUBLIC UTILITIES HAVING JURISDICTION OVER ANY OF THE
SYSTEMS HEREIN SPECIFIED.
a. INTERNATIONAL BUILDING CODE 2018
b. INTERNATIONAL MECHANICAL CODE 2018
c. INTERNATIONAL PLUMBING CODE 2018
d. INTERNATIONAL FIRE CODE 2018
e. INTERNATIONAL FUEL GAS CODE 2018
f. NATIONAL FIRE PROTECTION ASSOCIATION
g. NATIONAL ELECTRIC CODE
h. APPLICABLE REGULATIONS WSSC AND/OR WASA
3. SITE VISITS AND COORDINATION: THE CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND SHALL CONFIRM AND EVALUATE EXISTING CONDITIONS AND INSTALLED EQUIPMENT, DUCTWORK, PIPING, FINISHES, ETC. PRIOR TO START OF WORK. THE CONTRACTOR IS FULLY RESPONSIBLE FOR COORDINATING HIS/HER WORK WITH THE OTHER TRADES AND EXISTING CONDITIONS. IF ANY DISCREPANCY OR CONFLICT IS DETECTED AT THE JOB SITE, IT SHOULD BE BROUGHT TO THE ATTENTION OF THE NIST COR IMMEDIATELY, PRIOR TO DOING ANY WORK, WITH RECOMMENDATIONS FOR PROPER CORRECTION FOR THE ENGINEER'S APPROVAL.
4. PROJECT BIDDING: AS THE SITE, LOCATION, SIZE AND ROUTING OF EXISTING SYSTEMS INDICATED TO HAVE NEW CONNECTIONS MADE TO THEM ARE SHOWN AS ACCURATELY AS FIELD CONDITIONS WOULD PERMIT, THE BIDDING CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE CONTRACT DRAWINGS PRIOR TO BID. THE CONTRACTORS SHALL REPORT TO THE NIST COR REPRESENTATIVE, BEFORE SUBMITTING A BID, ANY CONDITIONS WHICH MIGHT MAKE THE INSTALLATION OF THE REQUIRED EQUIPMENT NOT FEASIBLE. THE CONTRACTOR'S BIDS SHALL INCLUDE ALL NECESSARY PERMIT FEES REQUIRED TO COMPLETE THE SCOPE OF WORK, UNLESS OTHERWISE DIRECTED BY THE OWNER. COPIES OF ALL PERMITS SHALL BE SUPPLIED TO THE
GOVERNMENT PRIOR TO STARTING CONSTRUCTION.
a. UNLESS OTHERWISE SPECIFIED, THE TERM “PROVIDE” SHALL MEAN THAT THE CONTRACTOR IS REQUIRED TO FURNISH AND
INSTALL SAID EQUIPMENT.
5. EXISTING CONDITIONS: THE ENGINEERING DESIGN DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE NOT CONSIDERED CONSTRUCTION SHOP DRAWINGS. ALL CRITICAL DIMENSIONS SHALL BE CONFIRMED BY THE CONTRACTOR IN THE FIELD. THE LOCATION AND SIZES OF EXISTING EQUIPMENT, PIPING, DUCTWORK, FIXTURES, ETC. ARE APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE, BY THE CONTRACTOR. CONNECTION TO, REMOVAL OR RELOCATION OF EXISTING EQUIPMENT, PIPING AND DUCTWORK SHALL BE DONE IN SUCH A MANNER AS NOT TO DAMAGE THE EXISTING FIXTURES OR EQUIPMENT. ANY EQUIPMENT, DUCTWORK, PIPING ETC. DAMAGED DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS CONTRACTOR TO THE SATISFACTION OF THE GOVERNMENT, AND AT NO ADDITIONAL COST THE GOVERNMENT.
b. THE CONTRACTOR SHALL PROTECT ALL EXISTING FIRE SUPPRESSION AND FIRE ALARM SYSTEMS AS NECESSARY TO AVOID FALSE ALARMS AND NUISANCE TRIPS. ALL SUCH SYSTEMS SHALL REMAIN OPERATIONAL DURING CONSTRUCTION AS REQUIRED
BY THE LOCAL FIRE MARSHAL.
6. SERVICE INTERRUPTIONS AND WORKING HOURS: PRIOR TO THE START OF WORK, CONTRACTOR SHALL OBTAIN THE PERMISSION OF THE CONTRACTING OFFICER FOR INTERRUPTION OF EXISTING SERVICES AND FOR CONNECTION TO THE SAME. CONTRACTOR SHALL COORDINATE THE TIME OF WORK AND INTERRUPTION OF SERVICES IN ACCORDANCE WITH THE INSTRUCTIONS OF THE CONTRACTING OFFICER. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AS DEFINED BY THE CONTRACTING OFFICER. WORK PERFORMED OUTSIDE OF NORMAL WORKING HOURS SHALL BE NEGOTIATED WITH OWNER PRIOR TO THE CONSTRUCTION PHASE.
REQUIRED EXISTING SYSTEM SHUTDOWNS SHALL BE COORDINATED IN WRITING WITH THE CONTRACTING OFFICER'S REPRESENTATIVE
A MINIMUM OF 21 DAYS IN ADVANCE.
7. SCAFFOLDING, RIGGING AND HOISTING: CONTRACTOR SHALL PROVIDE ALL SERVICES REQUIRED FOR INSTALLATION, ERECTION AND DELIVERY OF ALL MATERIALS AND EQUIPMENT TO THE SITE AND FOR REMOVAL OF TRASH, CONSTRUCTION DEBRIS, WASTE, AND
DEMOLISHED ITEMS FROM THE PREMISES.
8. INSTALLATION: INSTALLATION OF EQUIPMENT, PIPING, FIXTURES, WIRING, ETC. SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER, AND SHALL CONFORM TO THE LATEST TRADE PRACTICES. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UNLESS INDICATED OTHERWISE, AND THE CURRENT MODEL, FOR WHICH REPLACEMENT PARTS IS AVAILABLE. SUBSTITUTIONS SHALL ONLY BE ACCEPTED AT THE DISCRETION OF THE CONTRACTING OFFICER OR THE ENGINEER. THE CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS, UNLESS INDICATED OTHERWISE. ALL EQUIPMENT SHALL BE
MOUNTED VIBRATION FREE.
a. THE CONTRACTOR SHALL REPAIR ALL OPENINGS IN WALLS, CEILINGS, FLOORS, ETC., WHICH ARE CREATED BY DEMOLITION AND/OR NEW PROJECT WORK. THE REPAIRS SHALL BE WITH MATERIALS AND FINISHED TO MATCH EXISTING. OPENINGS AND PENETRATIONS IN FIRE RATED PARTITIONS OR DUCTWORK SHALL BE SEALED WITH U.L. APPROVED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RESISTANT INTEGRITY. DUCTWORK AND PIPING SHALL BE CAPPED, SEALED AIR AND WATERTIGHT AND
INSULATED TO MATCH EXISTING.
b. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED TO PROVIDE THE MANUFACTURER'S REQUIRED SERVICE CLEARANCES, AND ANY AIR AND WATER BALANCING DEVICES SHALL BE ACCESSIBLE FOR ADJUSTMENT. PROVIDE ACCESS DOORS IN DRYWALL CEILINGS AND PARTITIONS AS REQUIRED TO SERVICE EQUIPMENT, BALANCE DIFFUSERS, AND EXPOSED JUNCTION BOXES.
COORDINATE THE EXACT LOCATIONS AND STYLE OF FLANGELESS ACCESS DOORS WITH THE NIST COR.
c. THE CONTRACTOR SHALL INSTALL ALL DUCTWORK, PIPING, RACEWAYS, CIRCUITRY, CONDUIT, ETC., AS HIGH AS POSSIBLE TO
MAXIMIZE HEADROOM.
9. PROJECT CLEANING: ALL MATERIAL NOT TO BE USED SHALL BE REMOVED FROM THE SITE AND ALL DEBRIS SHALL BE CLEARED. THE AREA OF WORK SHALL BE LEFT IN CLEAN CONDITION PRIOR TO TURNOVER TO OWNER. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO WASHING AND/OR REPAIRING GLASS, REMOVING SPOTS AND STAINS, CLEANING ALL FIXTURES AND WASHING ALL FLOORS, WALLS AND CEILINGS IF APPROPRIATE. THE CONTRACTOR SHALL REMOVE DEBRIS EACH DAY
AND/OR AT THE DIRECTION OF THE NIST COR.
10. PROJECT CLOSEOUT, COMMISSIONING, AND PUNCH LISTS: UPON COMPLETING APPROXIMATELY 75% OF THE REQUIRED WORK, THE CONTRACTOR SHALL NOTIFY THE NIST COR IN ORDER TO SCHEDULE A PRE-FINAL REVIEW OF CONSTRUCTION. NO WORK SHALL BE CONCEALED BY CEILINGS, WALLS, ETC. FINAL REVIEW SHALL BE SCHEDULED AT 100% COMPLETION OF CONSTRUCTION. ALL PUNCH
LIST ITEMS MUST BE ACCOMPLISHED PRIOR TO FINAL ACCEPTANCE.
a. ALL EQUIPMENT WARRANTIES AND OPERATIONS AND MAINTENANCE MANUALS SHALL BE FULLY TRANSFERRED TO THE CONTRACTING OFFICER PRIOR TO FINAL ACCEPTANCE. ALL EQUIPMENT, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED IN FULL FROM DEFECT FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK BY THE
CONTRACTING OFFICER.
b. UNLESS OTHERWISE SPECIFIED IN THE COMMISSIONING SPECIFICATIONS, THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE CONTRACTING OFFICER ITS PROPER OPERATION(S).
c. PROVIDE THREE (3) OPERATION AND MAINTENANCE MANUALS IN 3-RING BINDER, WITH SUBJECT INDEX AND TABS. LIST ALL DESIGN FIRMS, CONTRACTORS AND PRIMARY SUPPLIERS; PROVIDE A POINT OF CONTACT WITH PHONE NUMBER AND E-MAIL ADDRESS FOR EACH FIRM. INCLUDE WARRANTY STATEMENTS, COPY OF APPROVED SUBMITTAL AND OPERATION AND MAINTENANCE PROCEDURES FOR EACH PIECE OF EQUIPMENT. INCLUDE A COPY OF THE FINAL, APPROVED WATER AND AIR
BALANCE REPORT.
d. PROVIDE PREVENTATIVE MAINTENANCE MANUALS SEPARATE FROM OPERATION AND MAINTENANCE MANUALS. PREVENTATIVE
MAINTENANCE MANUALS SHALL BE TURNED OVER TO THE GOVERNMENT CONTRACTING OFFICER.
11. PROJECT WARRANTY: ALL WORK SHALL BE FULLY WARRANTED FOR A PERIOD OF ONE YEAR UNLESS SPECIFICALLY NOTED OTHERWISE. DURING THE CORRECTION PERIOD, THE CONTRACTOR SHALL CORRECT ANY WORK FOUND NOT TO BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS BY REPAIRING OR REPLACING THE DEFECTIVE WORK AT NO ADDITION TO THE CONTRACT SUM. ALL MANUFACTURE EQUIPMENT WARRANTIES SHALL BE TRANSFERRED TO THE CONTRACTING OFFICER UPON SUBSTANTIAL COMPLETION.
THE WARRANTY SHALL BEGIN AT SUBSTANTIAL PROJECT COMPLETION.
TITLE
1/4" = 1' - 0"
DETAIL OR ENLARGED PLAN CALLOUT
M-101
SHUT-OFF VALVE IN VERTICAL
THREE-WAY CONTROL VALVE
GENERAL MECHANICAL NOTES
A. PROVIDE FIRE STOPPING FOR ALL PIPE PENETRATIONS THROUGH WALLS AND FIRE-RATED WALLS AND FLOOR SLABS. ALL
PENETRATIONS SEALED/CAULKED BY FM CERTIFIED INSTALLER.
B. INSULATION FLAME/SMOKE RATING: PROVIDE COMPOSITE MECHANICAL INSULATION JACKETS, COVERINGS, SEALERS, MASTIC, AND ADHESIVES WITH FLAME-SPREAD INDEX OF 25 OR LESS AND SMOKE DEVELOPED INDEX OF 50 OR LESS AS TESTED BY ASTM E4 AND THE
APPROVED METHOD OF NFPA 255. INSULATION MUST BE U.L. LISTED AND LABELED.
C. PIPING PASSING THROUGH AREAS OF RENOVATION AND SERVING ADJACENT SPACES SHALL BE PROTECTED IN PLACE. WHERE IT IS DETERMINED THAT THESE DUCTWORK AND PIPING MUST BE RELOCATED, CONTRACTOR SHALL REROUTE AND RESTORE SERVICES WITH
MINIMAL DISRUPTION. COORDINATE WORK WITH THE GOVERNMENT AND APPROPRIATE USERS.
D. BALANCING: SYSTEM SHALL BE BALANCED TO DELIVER WATER QUANTITIES INDICATED ON DRAWINGS. WORK SHALL BE PERFORMED BY FIRM(S) CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). MECHANICAL CONTRACTOR SHALL PROVIDE ALL NECESSARY BALANCING VALVES TO ACHIEVE WATER QUANTITIES INDICATED ON DRAWINGS. WATER BALANCE SHALL BE PERFORMED PRIOR TO HEATING SEASON. THE CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED FOR
THE TESTS.
E. THE CONTRACTOR SHALL SUBMIT FOUR (4) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND MATERIALS TO THE NIST
COR FOR REVIEW.
1. FINAL BALANCING REPORTS
2. ALL SCHEDULED EQUIPMENT AND PRODUCTS
3. PIPING, VALVES, AND INSULATION
F. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS PUBLISHED INSTALLATION LITERATURE.
G. PROVIDE ALL WORK, EQUIPMENT, AND MATERIALS INDICATED. PROVIDE ALL INTERLOCKS, RELAYS, CONTROLS, ETC., FOR A FULLY
FUNCTIONAL SYSTEM.
H. SUPPORT EQUIPMENT WITH VIBRATION ISOLATORS.
I. PROVIDE DIELECTRIC COUPLINGS AT ALL FERROUS TO NON-FERROUS PIPE CONNECTIONS AND FLANGE UNION ISOLATING JOINTS TO PREVENT ANY ELECTROLYTIC ACTION BETWEEN DISSIMILAR METAL. DIELECTRIC FITTINGS SHALL BE EQUAL TO EPCO SALES, INC. ALL CONNECTIONS TO STEEL PIPES SHALL BE MADE WITH WELDING FITTINGS. BRONZE VALVES ARE NOT ACCEPTABLE AS A DIELECTRIC
COUPLING OR BREAK.
J. PIPES PENETRATING RATED WALLS, PARTITIONS, CEILINGS, AND FLOOR SLABS SHALL BE FIRE STOPPED AT RATED OUTER SURFACES.
INSULATION ENDS SHALL BE SEALED VAPORTIGHT.
K. ALL PIPING SHALL BE IDENTIFIED AS TO SERVICE (SUPPLY OR RETURN, MAKEUP OR DRAIN, ETC) AND DIRECTION OF FLOW. SELF ADHESIVE TYPE IDENTIFICATION SHALL BE APPLIED TO PIPE INSULATION AT REGULAR INTERVALS, MAXIMUM 20 FEET BETWEEN MARKERS, OR WHEN PIPING ENTERS/EXITS ROOM, OR FOR CONVENIENCE FOR FACILITY ENGINEERS.
L. PROVIDE MANUAL AIR VENTS AT HIGH POINTS AND DRAIN VALVES AT LOW POINTS IN HYDRONIC CLOSED SYSTEMS. PROVIDE UNIONS AT
PIPE CONNECTIONS TO EQUIPMENT TO FACILITATE REMOVAL OF EQUIPMENT.
M. ALL NEW PIPING SHALL BE LABELED TO BE CONSISTENT WITH EXISTING CONDITIONS. PIPE IDENTIFICATION LABELS SHALL HAVE 2" HIGH LETTERS WITH BACKGROUND COLOR THAT CONTRASTS BOTH THE COLOR OF PAINT AND LETTERING. FLOW DIRECTIONAL ARROWS SHALL MATCH PIPE IDENTIFICATION. PAINT SHALL BE DURON EPOXY MODIFIED ENAMEL WITH COLORS DEFINED BY THE PIPING SPECIFICATIONS OR TO MATCH BUILDING STANDARD. CONFORM TO ALL ANSI STANDARDS FOR PIPE LABELING.
N. INSULATE ALL HVAC WATER, DRAIN, AND COLD WATER PIPING. EXPOSED INSULATED PIPING WITHIN 6FT OF THE FINISHED FLOOR SHALL BE COVERED WITH PVC JACKETING. ALL PIPING LOCATED IN THE ATTIC SHALL BE PROVIDED WITH A PVC JACKETING.
O. COORDINATE HOURS OF ALL WELDING, SOLDERING, BRAZING. GRINDING, AND ALL HOT WORK WITH THE GOVERNMENT. REFER TO NIST SUBORDER S7401.04. TEMPORARY POWER REQUIREMENTS MUST BE COORDINATED WITH ELECTRICAL CONTRACTOR. ALL WELDING
REQUIRES A BURN PERMIT FROM THE NIST COR.
P. ALL PIPING JOINTS SHALL BE LEAK TESTED PRIOR TO BEING PUT IN SERVICE. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED, TO TWICE THE MAXIMUM SYSTEM OPERATING PRESSURE, AND FLUSHED PRIOR TO SYSTEM STARTUP.
Q. PROVIDE 1-1/2" ROUND BRASS VALVE IDENTIFICATION TAGS FOR ALL NEW VALVES.
R. SUPPORT ALL NEW PIPING FROM EXISTING BUILDING STRUCTURE AT A MAXIMUM OF 10'-0" INTERVALS OR AS REQUIRED TO PREVENT
SAGGING.
SECTION VIEW CALLOUT
M-301
DUCTWORK (20" IS VISIBLE DIMENSION,
SUPPLY AIR DUCTWORK TURNS UP OR TOWARDS
EXHAUST AIR DUCTWORK TURNS UP OR TOWARDS
SUPPLY AIR DUCTWORK TURNS DOWN OR AWAY
EXHAUST AIR DUCTWORK TURNS DOWN OR AWAY
MANUAL VOLUME DAMPER
DROP/OFFSET IN DUCTWORK
20"x12"
TRANSITION FITTING
SQUARE TO ROUND DUCTWORK TRANSITION FITTING
SQUARE ELBOW WITH TURNING VAVES
SHORT RAIDUS ELBOW
ACCESS DOOR OR PANEL
AIRFLOW DIRECTION
PARALLEL BLADE CONTROL DAMPER
OPPOSED BLADE CONTROL DAMPER
12" IS THE DIMENSION INTO THE PAGE)
ANGLE VALVE
PUMP
DP
S
T
SWITCH
TEMPERATURE SENSOR
DIFFERENTIAL PRESSURE SENSOR
SD SMOKE DETECTOR
MOTORIZED DAMPER
T TEMPERATURE SENSOR
PHASING NOTES
A. CONTRACTOR SHALL COORDINATE WITH THE NIST COR FOR APPROPRIATE PHASING OF CONSTRUCTION, SHUTDOWN REQUIREMENTS, AND TEMPORARY EQUIPMENT, TO ENSURE THE FACILITY FUNCTIONS AND OPERATIONS. CONTRACTOR SHALL ONLY DEMOLISHED ONE AIR HANDLER AT A TIME, AND SHALL USE THE OLD AIR HANDLERS AS A GUIDE FOR THE INSTALLATION OF THE NEW AHUs. ONCE NIST IS SATISFIED WITH THE FIRST NEW AHU INSTALLATION, THEN THE CONTRACTOR SHALL DEMOLISH THE REMAINING TWO (2) AHUs.
TEMPERATURE GAGE
PRESSURE GAGE
BALANCING VALVES
PRESSURE REDUCING VALVES
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
A
P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
M-001
COVER SHEET
MECHANICAL
226-438
NORTH
20"x20" SA (E) DN (TYP OF 2)
REMOVE ELECTRIC DUCT HEATER
22"x22" RA DN (E) (TYP OF 2)
60"x22" SA (X)
G H
R (E
4" HTBS/R (E) FROM CH-1
3" DSS (E)
1" DSS, CW, HW (E) TO SPRAY PUMP (TYP OF 3)
5" HTBS/R (E)
REMOVE GLYCOL HEATER
R E
M O
V E
A C
U -1
N
IA
G
A R
A M
O D
E L
"N O
-F R
O S
T" S
P R
A Y
C O
O
LE
R . S
H O
P O
R D
E R
R E
M O
V E
A C
U -1
N
IA
G
A R
A M
O D
E L
"N O
-F R
O S
T" S
P R
A Y
C O
O
LE
R . S
H O
P O
R D
E R
R E
M O
V E
A C
U -1
N
IA
G
A R
A M
O D
E L
"N O
-F R
O S
T" S
P R
A Y
C O
O
LE
R . S
H O
P O
R D
E R
2"HTBS/R(X)
(TYP. OF 2)
2" DSR (E)
REMOVE GLYCOL HEATER
AND ELECTRIC HEATER
1-1/2" GHS/R (X)
20"x28" SA DN (E)
(TYP. OF 2)
16"x36" RA DN (E)
(TYP. OF 2)
REMOVE BRINE CIRCULATING
PUMP (TYP. OF 3)
EXISTING DEFROST DRAIN
FROM ACU-12, 13 & 14
5" H
TB
S
(E
5" H
TB
R
(E
3" D
S S
(E
H
TB
R (E
H
TB
S (E
SPRAY PUMP (X)
(TYP.)
2 3
REMOVE GLYCOL HEATER
AND ELECTRIC HEATER
2 3
ACU-12,13,14
EXISTING
CONTROL
PANEL
3" HTBS/R(X)
2" DSR (E)
3" S
A N
(E
1-1/2"(X) 1-1/2"(X)
1-1/2"(X) 1-1/2"(X)
G H
S (E
C W
(E
H W
(E
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
MECH. EQPMT.
ATTIC
AREA OF
WORK
1/4"=1'-0" 4' 2' 0' 4' 8'
A P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
DEMOLITION WORK GENERAL NOTES
MD-101
DEMOLITION PLAN
MECHANICAL
226-439
DEMOLITION WORK PLAN NOTES
1. REMOVE AIR CONDITIONING UNIT AND ALL ASSOCIATED COMPONENTS. HOUSE
KEEPING PAD SHALL BE EXISTING TO REMAIN. CONTRACTOR SHALL VERIFY-IN-FIELD
THE EXISTING CONDITIONS OF THE HOUSE KEEPING PAD, AND COORDINATE WITH THE
NIST COR IF REPLACEMENT OR MODIFICATIONS TO THE PAD ARE REQUIRED. REFER
TO NEW WORK PLANS FOR ADDITIONAL INFORMATION.
2. REMOVE ABANDONED-IN-PLACE GLYCOL HEATING COIL AND ALL ASSOCIATED
COMPONENTS. REFER TO NEW WORK PLAN FOR ADDITIONAL INFORMATION.
3. REMOVE EXISTING ELECTRIC HEATING COIL AND ALL ASSOCIATED COMPONENTS.
REFER TO NEW WORK PLANS FOR ADDITIONAL INFORMATION.
4. REMOVE EXISTING BRINE PUMP AND ALL ASSOCIATED COMPONENTS. HOUSE
KEEPING PAD SHALL BE EXISTING TO REMAIN. CONTRACTOR SHALL VERIFY-IN-FIELD
THE EXISTING CONDITIONS OF THE HOUSE KEEPING PAD, AND COORDINATE WITH THE
NIST COR IF REPLACEMENT OR MODIFICATIONS TO THE PAD ARE REQUIRED. REFER
TO NEW WORK PLANS FOR ADDITIONAL INFORMATION.
5. REMOVE DIFFERENTIAL PRESSURE CONTROL VALVE AND SENSOR. REFER TO NEW
WORK FOR ADDITIONAL INFORMATION.
6. REMOVE 1" DSS, CW AND HW PIPING CONNECTIONS AND ASSOCIATED VALVES. REFER
TO MECHANICAL NEW WORK PLANS FOR ADDITIONAL INFORMATION. CONTRACTOR
SHALL COORDINATE WITH NIST COR FOR UTILITY SERVICE OUTAGES.
7. REMOVE HIGH TEMPERATURE BRINE SUPPLY AND RETURN PIPING BACK TO MAIN.
REFER TO MECHANICAL NEW WORK PLANS FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL COORDINATE WITH NIST COR FOR UTILITY SERVICE OUTAGES
8. REMOVE GLYCOL HEATING WATER PIPING BACK TO MAIN. CONTRACTOR SHALL
COORDINATE WITH NIST COR FOR UTILITY SERVICE OUTAGES.
9. REMOVE DRAIN PIPING AND ASSOCIATED VALVES. REFER TO NEW WORK FOR
ADDITIONAL INFORMATION.
10. REMOVE ASSOCIATED SPACE DRY BULB AND DEW POINT TEMPERATURE SENSORS,
LOCATED ON THE FLOOR BELOW. REFER TO NEW WORK PLANS FOR ADDITIONAL
INFORMATION
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM
RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT
INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR SHALL VISIT THE SITE AND VERIFY EXACT EXISTING CONDITIONS PRIOR
TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK.
THE CONTRACTOR SHALL NOTIFY THE NIST COR IN WRITING IF EXISTING CONDITIONS
ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE OWNER. IF THE OWNER DEEMS
THE EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT IN THE
PROPER MANNER.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING
REMOVED THROUGH EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER,
THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING & VERIFY ALL REMOVALS,
AS SOME DIFFERENCES MAY EXIST.
4. REMOVE ALL MECHANICAL SYSTEMS SHOWN AS BEING DEMOLISHED, CURRENTLY
SERVING EXISTING AREA OF WORK, AND ALL ASSOCIATED COMPONENTS.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR
REQUIRED TO COMPLETE DEMOLITION WORK.
6. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK
TO MATCH EXISTING CONDITION.
7. CONTRACTOR SHALL VERIFY IN FIELD ALL CRITICAL DIMENSIONS FOR AIR HANDLING
UNITS, PUMPS AND REHEAT COILS. THE CONTRACTOR SHALL NOTIFY NIST AND A/E
PRIOR TO COMMENCING WORK IF THE EXISTING CONDITIONS PREVENT THE
EXECUTION OF THE INTENDED WORK.
8. PROVIDE PRE-DEMOLITION AIR BALANCE OF THE ENTIRE HVAC SYSTEM BASED ON
THE ORIGINAL DESIGN CONDITIONS.
1 BUILDING 226 - PARTIAL ATTIC DEMOLITION PLAN - MECHANICAL
SCALE: 1/4" = 1'
SCOPE OF WORK
1. REMOVE ALL ACUs, INDICATED AS DEMOLISHED, AND ALL ASSOCIATED COMPONENTS.
DISCONNECT SUPPLY AND RETURN DUCTWORK, AND SUPPLY AND RETURN PIPING,
AND RECONNECT TO NEW ACUs IN NEW WORK.
2. REMOVE BRINE PUMPS, INDICATED AS DEMOLISHED, AND ALL ASSOCIATED
COMPONENTS. DISCONNECT PIPING AND RECONNECT IN NEW WORK.
3. REMOVE ABANDONED GLYCOL HEATING COIL AND ALL ASSOCIATED COMPONENTS,
INDICATED AS DEMOLISHED. DISCONNECT SUPPLY DUCTWORK AND RECONNECT IN
NEW WORK.
4. REMOVE ELECTRIC HEATING COIL, INDICATED AS DEMOLISHED, AND ALL ASSOCIATED
COMPONENTS. DISCONNECT DUCTWORK AND REFER TO NEW WORK PLANS FOR
ADDITIONAL INFORMATION.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text F
P-14
P-13
P-12
ACU-13
ACU-14
ACU-12
EDH-13 2 3
EDH-14 2 3
20"x20" SA (E) DN (TYP OF 2)
22"x22" RA DN (E) (TYP OF 2)
60"x22" SA
2" HTBS/R
2" DSR (E)
3" D
S S
(E
H
TB
R (E
H
TB
S (E
SPRAY PUMP
(TYP.)
ACU-12,13,14
EXISTING
CONTROL
PANEL
2-1/2" HTBS/R
2" DSR (E)
3" S
A N
(E
EDH-12
M-101
3" HTBS/R
G H
R (E
G H
S (E
C W
(E
H W
(E
5" H
TB
S
(E
5" H
TB
R
(E
P-14A
P-13A
P-12A
4" HTBS/R (E) FROM CH-1
3" DSS (E)
1" DSS, CW, HW (E) TO SPRAY PUMP (TYP OF 3)
5" HTBS/R (E)
20"x28" SA DN (E)
(TYP. OF 2)
16"x36" RA DN (E)
(TYP. OF 2)
EXISTING DEFROST DRAIN
FROM ACU-12, 13 & 14
SUPPLY AIR DUCTWORK
ELECTRIC DUCT HEATER
3-WAY BRINE LOCAL LOOP MIXING
CONTROL VALVE
HTBS/R (E)
ACU-14
P-14
RETURN AIR DUCTWORK
SUMP DRAIN PIPINGDEFROST DRAIN
GHS/R(E)
ACU CONTROL PANEL SAN PIPING
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
MECH. EQPMT.
ATTIC
AREA OF
WORK
1/4"=1'-0" 4' 2' 0' 4' 8'
A P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
NEW WORK GENERAL NOTES
M-101
NEW WORK PLAN
MECHANICAL
226-440
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM
RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT
INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT
EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR
PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE NIST COR IN
WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION
OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS
PROVIDED.
2. DUCTWORK AND PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS OR
EQUIPMENT.
3. PROVIDE ISOLATION VALVES FOR THE BRINE SYSTEM AS NECESSARY.
1 BUILDING 226 - PARTIAL ATTIC NEW WORK PLAN - MECHANICAL
SCALE: 1/4" = 1'
NEW WORK PLAN NOTES
1. PROVIDE AIR CONDITIONING UNIT AND ALL ASSOCIATED COMPONENTS AT LOCATION
INDICATED. CONTRACTOR SHALL COORDINATE ACCESS AND EQUIPMENT PATHWAY
INSTALLATION WITH AIR HANDLER MANUFACTURER. REFER TO MECHANICAL DETAILS,
SCHEDULES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. PROVIDE DUCTWORK IN PLACE OF DEMOLISHED GLYCOL HEATING COIL, AT LOCATION
INDICATED, AS NEEDED. CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF
DUCTWORK REQUIRED. DUCTWORK SHALL MATCH EXISTING IN CONSTRUCTION
MATERIAL, SEAL CLASS AND INSULATION. CONTRACTOR SHALL CONFIRM DUCTWORK
AND ACCESSORIES ARE COMPATIBLE WITH AIRSTREAM TEMPERATURES BETWEEN
-10F AND 150F.
3. PROVIDE ELECTRIC HEATING COIL AND ALL ASSOCIATED COMPONENTS, AT LOCATION
INDICATED. REFER TO MECHANICAL DETAILS AND SCHEDULES FOR ADDITIONAL
INFORMATION, INCLUDING CLEARANCE REQUIREMENTS.
4. PROVIDE BRINE PUMP AND ALL ASSOCIATED COMPONENTS, AT LOCATION INDICATED.
REFER TO MECHANICAL DETAILS AND SCHEDULES FOR ADDITIONAL INFORMATION.
5. PROVIDE 1" DSS, CW AND HW PIPING CONNECTIONS AND ASSOCIATED VALVES AND
CONNECT TO EXISTING AT LOCATION INDICATED. PIPING SHALL MATCH EXISTING IN
CONSTRUCTION MATERIAL, FITTINGS AND INSULATION. REFER TO MECHANICAL
DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE HIGH TEMPERATURE BRINE SUPPLY AND RETURN PIPING AND CONNECT TO
EXISTING AT LOCATION INDICATED WITH ISOLATION VALVES AT MAIN TAPS. REFER TO
MECHANICAL DETAILS FOR ADDITIONAL INFORMATION
7. PROVIDE 2" SANITARY AND DEFROST DRAIN PIPING AND ASSOCIATED VALVES AND
CONNECT TO EXISTING AT LOCATION INDICATED. PIPING SHALL MATCH EXISTING IN
CONSTRUCTION MATERIAL, FITTINGS AND INSULATION. REFER TO MECHANICAL
DETAILS FOR ADDITIONAL INFORMATION.
8. PROVIDE DIFFERENTIAL PRESSURE CONTROL VALVE AND SENSOR AT LOCATION
INDICATED.
9. PROVIDE SPACE DRY BULB AND DEW POINT TEMPERATURE SENSORS IN THE
ASSOCIATED ROOMS, LOCATED ON THE FLOOR BELOW, IN THE SAME LOCATION AS
THE DEMOLISHED SENSORS. REFER TO MECHANICAL CONTROLS DRAWINGS FOR
ADDITIONAL INFORMATION.
SCOPE OF WORK
1. PROVIDE ALL ACUs, INDICATED AS NEW WORK, AND ALL ASSOCIATED COMPONENTS.
RECONNECT SUPPLY AND RETURN DUCTWORK, AND SUPPLY AND RETURN PIPING, TO
ACUs. AIR CONDITIONING UNITS SHALL BE ASSEMBLED IN PLACE.
2. PROVIDE BRINE PUMPS, INDICATED AS NEW WORK, AND ALL ASSOCIATED
COMPONENTS. RECONNECT EXISTING PIPING TO ACU.
3. PROVIDE DUCTWORK IN PLACE OF DEMOLISHED GLYCOL HEATING COIL
4. PROVIDE ELECTRIC HEATING COIL, INDICATED AS NEW WORK, AND ALL ASSOCIATED
COMPONENTS. RECONNECT DUCTWORK.
2 BUILDING 226 - PARTIAL ATTIC ELEVATION - ACU-14
SCALE: 1/4" = 1'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text F
AIR FLOW
SEAL AIR TIGHT
REHEAT COIL
M A
X
DUCT
1 COIL DUCT CONNECTION DETAIL
NTS
ACCESS DOOR ON SIDE OR
BOTTOM FOR BEST ACCESS
M A
X
SIZES OF MAINS
REFER TO PLAN FOR ROUTING AND
PIPE HANGER W/VIBRATION
ISOLATOR
ANCHOR BOLT
BAS SENSOR WELL
CHECK VALVE
EXISTING CONCRETE
COUPLING GUARD
BALL VALVE
PIPE INSTALLATION AND
PUMP INERTIA BASE
FINISH FLOOR
SYSTEM IS FILLED
PRESSURE GAUGE W/
GROUT PUMP BASE AFTER
PAD
SIZES OF MAINS
PUMP BASE LENGTH AND WIDTH
REFER TO PLAN FOR
AS REQUIRED TO SUPPORT
PUMP AND SUCTION ELBOW
BAS SENSOR WELL
STAINLESS STEEL BRAIDED
FLEXIBLE CONNECTOR (TYP)
BUTTERFLY VALVE
BLOWDOWN VALVE
STRAINER WITH
HOSE END DRAIN VALVE
BAS SENSOR WELL
3 AIR CONDITIONING UNIT PIPING DETAIL
NTS
DUCT WIDTH
DUCT
HEIGHT
CONTROL PANEL LENGTH
CLEARANCE
DUCT
THICKNESS
CONTROL PANEL
OVERHANG
HEATING
COIL DEPTH
NOTES:
1. FOR SLIP-INSTALLATION, CUT HOLE IN DUCTWORK 1/8" LARGER THAN HEATER FRAME (HEATING COIL DEPTH x HEIGHT).
2. SUSPEND OR ATTACH DUCT PER MANUFACTURER RECOMMENDATIONS.
3. PROVIDE CLEARANCE FROM ALL ARCHITECTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ALL OTHER ELEMENTS EQUAL
TO THE CONTROLS OVERHANG HEIGHT AND LENGTH.
4. INSTALL HEATER AT LEAST 4 FEET DOWNSTREAM AND 4 FEET UPSTREAM FROM FAN OUTLET, ABRUPT TRANSITION, OR OTHER
OBSTRUCTION.
5. ELBOWS OR TURNS MUST BE LOCATED AT LEAST 4' FROM THE INLET OF THE HEATER AND 2' FROM THE OUTLET OF THE HEATER.
6. PROVIDE WITH ELECTRICAL DISCONNECT SWITCH.
CONTROL PANEL
WIDTH
CONTROL
PANEL HEIGHT
2 CENTRIFUGAL END SUCTION PUMP DETAIL (P-12, 13, 14)
NTS
SUCTION DIFFUSER
OPD MOTOR
BELT GUARD
FAN MOTOR
PRESSURE GAGE
3/8" LINE WITH REGULATING STOP COCK
DENSITY COLUMN, SEE DETAIL
RUBBER HOSE AND CLAMP CONNECTION
1/2 HP PUMP MOTOR, 3450 RPM, 460 V, 3 PH
2" DRAIN
THREE (3) 1" CONNECTIONS FOR
NO-FROST FEED, HOT WATER FEED
AND WATER MAKE UP FILL
4" FLANGE FOR LIQUID LEVEL
CONTROLLER
2" DRAIN WITH SWIRL BREAKER
12" X 8" ACCESS DOOR
3" HTBS INLET
3" HTBR OUTLET 8 ROW FINNED COOLING COIL
DAMPER SHAFT
FAN SHAFT
111-5/16" 13-1/2"
86-5/8"
SUPPLY DAMPER
RETURN DAMPER
VIBRATION ISOLATORS
PRIMARY MIST ELIMINATOR
AUXILARY MIST ELIMINATOR
DISCHARGE
INTAKE
DAMPER (TYP.)
ACCESS DOOR
2" OVERFLOW
FOR NO-FROST
2" OVERFLOW FOR WATER
ACCESS DOOR FOR
ELIMINATORS AND FILTER
49-1/2"
43-3/16"
-1
/2
80-5/16"13-1/2"
55-5/8"
BELT GUARD
FAN MOTOR
PRESSURE GAGE
3/8" LINE WITH REGULATING STOP COCK
DENSITY COLUMN, SEE DETAIL
RUBBER HOSE AND CLAMP CONNECTION
1/2 HP PUMP MOTOR, 3450 RPM, 460 V, 3 PH
2" DRAIN
THREE (3) 1" CONNECTIONS FOR
NO-FROST FEED, HOT WATER FEED
AND WATER MAKE UP FILL
4" FLANGE FOR LIQUID LEVEL
CONTROLLER
2" DRAIN WITH SWIRL BREAKER
12" X 8" ACCESS DOOR
2" HTBS INLET
2" HTBR OUTLET8 ROW FINNED COOLING COIL
FAN SHAFT
SUPPLY DAMPER
RETURN DAMPER PRIMARY MIST ELIMINATOR
AUXILARY MIST ELIMINATOR
DISCHARGE
INTAKE
DAMPER (TYP.)
ACCESS DOOR
2" OVERFLOW
FOR NO-FROST
2" OVERFLOW FOR WATER
ACCESS DOOR FOR
ELIMINATORS AND FILTER
49-1/2"
43-3/16"
-1
/2
80-5/16" 13-1/2"
55-5/8"
BELT GUARD
FAN MOTOR
PRESSURE GAGE
3/8" LINE WITH REGULATING STOP COCK
DENSITY COLUMN, SEE DETAIL
RUBBER HOSE AND CLAMP CONNECTION
1/2 HP PUMP MOTOR, 3450 RPM, 460 V, 3 PH
2" DRAIN
THREE (3) 1" CONNECTIONS FOR
NO-FROST FEED, HOT WATER FEED
AND WATER MAKE UP FILL
4" FLANGE FOR LIQUID LEVEL
CONTROLLER
2" DRAIN WITH SWIRL BREAKER
12" X 8" ACCESS DOOR
3" HTBS INLET
3" HTBR OUTLET 12 ROW FINNED COOLING COIL
FAN SHAFT
SUPPLY DAMPER
RETURN DAMPER
DISCHARGE
INTAKE
DAMPER (TYP.)
ACCESS DOOR
2" OVERFLOW
FOR NO-FROST
2" OVERFLOW FOR WATER
49-1/2"
43-3/16"
-1
/2
5 LOW TEMP ACU DETAIL (ACU-12)
NTS
6 LOW TEMP ACU DETAIL (ACU-13)
NTS
7 LOW TEMP ACU DETAIL (ACU-14)
NTS
HOUSE KEEPING PAD
EXISTING HOUSE KEEPING PAD
FAN
EXISTING HOUSE KEEPING PAD
HOUSE
KEEPING PAD
VIBRATION ISOLATORS
FAN
VIBRATION ISOLATORS
PRIMARY MIST ELIMINATOR
AUXILARY MIST ELIMINATOR
ACCESS DOOR FOR
ELIMINATORS AND FILTER
FAN
HOUSE KEEPING PAD
EXISTING HOUSE KEEPING PAD
4 ELECTRIC DUCT HEATER DETAIL
NTS
3/4" MANUAL
AIR VENT
3-WAY CONTROL VALVE
STRAINER WITH BLOW OFF
GATE VALVE
HTBS
HTBR
TEE (TYP)
AIR CONDITIONING UNIT
BRINE PUMP; REFER
TO PUMP DETAIL FOR
PIPING SPECIALTIES
AND VALVES
AIR VENT (TYP)
2" WATER TO EXISTING DRAIN
2" DSR TO EXISTING TANK
SPRAY PUMP AND TANK
ASSEMBLY NO-FROST
HW
CW
DSS
2" DRAIN
VIBRATION ISOLATOR (TYP)
VIBRATION ISOLATOR (TYP)
2"
2"
2"
SUMP/BASIN
COOLING COIL
PIPING SHOWN FOR REFERENCE ONLY.
WASHABLE FILTER
WASHABLE FILTER
WASHABLE FILTER
SUMP
SUMP
SUMP
SPRAY COIL
SPRAY COIL
SPRAY COIL
SPRAY
PUMP
STAINLESS STEEL FLEX
CONNECTION (TYP.)
SPRAY COIL
PRESSURE GAGE (TYP)
PRESSURE REDUCING
VALVE (TYP)
NO-FROST DISCHARGE
PIPING
BALANCE VALVE
1. IF SUCTION DIFFUSER IS PROVIDE WITH AN INTEGRAL STRAINER, THAN THE SEPARATE WYE
STRAINER IS NOT NECESSARY.
8 DENSITY COLUMN DETAIL
NTS
AIR HANDLING UNIT
DENSITY COLUMN
REMOVABLE PLUG FOR INSPECTION OF DENSITY COLUMN
UNION (TYP)
THROTTLING VALVE
SHUTOFF VALVE
TO SUMP PUMP DISCHARGE
DRAIN VALVE
P
PRESSURE TRANSDUCER
3"Ø
TO
S
U M
P
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
A
P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
M-501
DETAILS
MECHANICAL
226-441
3 PRESSURE GAGE DETAIL
NTS
2 VERTICAL TURBINE SUMP PUMP DETAIL
NTS
MOTOR
BASIN SUMP
IMPELLER
NOTE 2 & 3
PUMP
DISCHARGE
PUMP SHAFT
NOTE 1
NOTES:
(1) PUMP SHAFT SHALL BE SIZED TO FIT SUMP DEPTH
(2) PROVIDE PROTECTION AGAINST DEBRIS DAMAGING PUMP
(3) PROVIDE OFFSET BETWEEN PUMP IMPELLER AND BASIN FLOOR AS RECOMMENDED BY PUMP
MANUFACTURER.
(4) CONTINUATION OF ACU SUMP BASIN
NOTE 4
3/4" BALL VALVE
PRESSURE SNUBBER
REDUCING BUSHING
PRESSURE GAUGE
NOTE: FOR PIPES 2" AND SMALLER, USE FITTING INSTEAD OF THREADOLET OR WELDOLET.
THREADOLET
WATER PIPE
6" MIN.
WATER PIPING
CONCRETE INSERT
THREADED ROD
UNISTRUT CHANNEL
PIPING
NOTES:
1. MAXIMUM DISTANCE BETWEEN SUPPORTS IS 8'-0", OR AS REQUIRED TO PREVENT SAGGING.
2. THREADED ROD SIZE AS REQUIRED TO SUPPORT PIPING WITH A 3.0 SAFETY FACTOR.
3. CONCRETE ANCHORS SHALL BE HILTI DROP-IN ANCHOR WITH MINIMUM CONCRETE EMBEDMENT AS PER
MANUFACTURERS SPECS OR APPROVED EQUAL.
4. PROVIDE FOR COLD AND HOT WATER PLUMBING PIPING SUPPORTS.
STRAP PIPE
TO UNISTRUT
2. COORDINATE SUPPORT WITH ELECTRICAL DRAWINGS.
1. MAXIMUM DISTANCE BETWEEN SUPPORTS IS 8'-0", OR AS REQUIRED TO PREVENT SAGGING.
3. THREADED ROD SIZE AS REQUIRED TO SUPPORT PIPING WITH A 3.0 SAFETY FACTOR.
NOTES:
STRUCTURAL JOIST
1/2" THREADED
ROD (TYP).
1-1/4 X 1-1/4 X 3/16
ANGLE IRON SUPPORTS.
1/2" BOLT AND NUT
W/ 2" 1/2 WASHER.
NUTS AND WASHERS BOTH
SIDES OF ANGLE (TYP).
1 PIPE SUPPORT DETAIL
NTS
4 ELECTRIC DUCT HEATER SUPPORT DETAIL
NTS
4. PROVIDE DUCT SUPPORTS AS NEEDED TO INDEPENDENTLY SUPPORT THE ELECTRIC DUCT HEATER
1. MAXIMUM DISTANCE BETWEEN SUPPORTS IS 6 FT, OR AS REQUIRED TO PREVENT SAGGING
2. COORDINATE PIPE SUPPORT WITH OTHER TRADES AND EXISTING CONDITIONS.
3. THREADED ROD SIZE AS REQUIRED TO SUPPORT PIPING WITH A 3.0 SAFETY FACTOR.
EXPANSION RAIL, MATERIAL
ROLLER CENTERLINE, IN
EACH DIRECTIONNOTES:
EXTEND 6 IN. BEYOND
SAME AS PIPE (TYP),
CONTINUOUS VAPOR
BARRIER (TYP.)
SHIELD (TYP)
20 GAUGE SHEET METAL
HANGER ROD
END VIEW ELEVATION VIEW
6 IN.
INSULATION
5 ROLLER TYPE PIPE SUPPORT DETAIL
NTS
4. PROVIDE ROLLER SUPPORT FOR ALL BRINE PIPING
UNION
NO FROST LV-2 OR WATER
1/2" THREADED
ROD (TYP).
1-1/4 X 1-1/4 X 3/16
ANGLE IRON SUPPORTS.
1-1/4 X 1-1/4 X 3/16
ANGLE IRON SUPPORTS.
VERTICAL MOUNT HORIZONTAL MOUNT
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
A
P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
M-502
DETAILS
MECHANICAL
226-442
BRINE PUMP SCHEDULE
TAG
GPM RPM
50 1150
TDH
(FT)
IMPELLER
(IN)
ACTUAL
DIA.
7.63
PERFORMANCE
BHP
0.70
MOTOR
HP
1.0
VOLT
PHASE
HZ
NOTES
ALL
SERVICE
ACU-12
BUILDING 226
BASIS OF DESIGN
FLOWSERVE
AH3X1.5-82 M3GD
WEIGHT
(LBS)
425P-12
P-13 ACU-13
BUILDING 226
35 25 7.880.62 3 60
P-14 ACU-14
BUILDING 226
75 35 60
INDOOR LOW TEMPERATURE AIR CONDITIONING UNIT SCHEDULE
TAG TOTAL
(MBH)
SENSIBLE
(MBH)
LOCATION NOTES
NOTES:
1. PROVIDE WITH THE FOLLOWING
a. 2 INCH SOLID DOUBLE WALL CONSTRUCTION WITH FOAM INJECTED PANEL WITH R-30 PANEL INSULATION
b. NO THROUGH METAL CONSTRUCTION
c. MERV 8 WASHABLE FILTERS WITH STAINLESS STEEL FRAMES
d. TWIN (2) BELT DRIVEN BACKWARDS INCLINED CLASS II FANS WITH AJUSTABLE SHEAVES, COMBINATION MOTOR STARTER AND DISCONNECT, AND NEMA PREMIUM TEFC MOTOR.
e. STAINLESS STEEL CASING, COIL AND HOUSING CONSTRUCTION
f. FAN AND FILTER STATUS SWITCHES, DISCHARGE, MIXED, AND RETURN AIR SENSORS AND DAMPER ACTUATOR.
g. SPRAY SUMP PUMP. REFER TO SCHEDULE BELOW AND SPECIFICATIONS.
h. MIST ELIMINATORS
i. VIBRATION ISOLATORS
j. BRINE COOLING COIL PERFORMANCE DATA IS BASED ON WORKING FLUID OF DYNALENE HFLO (REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION FOR DYNALENE HFLO
WORKING FLUID.)
MOTOR
(HP)
BRINE COOLING COILINDOOR FAN
VOLTS / PHASE /FREQ
ACU-12 30
BUILDING 226
ATTIC
ALL5 460 / 3 / 60
AIR FLOW
(CFM)
5,500
ELECTRIC DUCT HEATER SCHEDULE
MARK SERVICE LOCATION
AIRFLOW
(CFM)
SIZE
(INCH) VOLT / PH / HZ BASIS OF DESIGN NOTES
EDH-12 ACU-12
BUILDING 226
ATTIC
460 / 3 / 60
INDEECO
166X
ALL
EDH-13
EDH-14
460 / 3 / 60
460 / 3 / 60
5,500 60"x22"
4,750 34"x40"
NOTES:
1. PROVIDE WITH FIN TUBULAR COIL DUCT HEATER.
2. PROVIDE WITH UNIT MOUNTED DISCONNECT.
3. PROVIDE WITH SCR CONTROL, STAGED CIRCUITS AND CONTROL PANEL
4. RATED POWER INCLUDES 20% SAFETY FACTOR.
NOTES:
1. PROVIDE WITH THERMAL OVERLOAD PROTECTION
2. PROVIDE WITH VIBRATION ISOLATION AND INERTIA BASE
3. PROVIDE WITH STAINLESS STEEL CONSTRUCTION.
4. PROVIDE AS BASE MOUNTED END SUCTION MAGNETIC DRIVE AND SEAL-LESS CONSTRUCTION, COMPLIANT WITH ANSI B73.1 AND B73.3 AND HI 5.1-5.6
WORKING FLUID
VISCOSITY
Cp
5.2
DENSITY
(LB/CF)
49.8
TEMP.
(°F)
- 15
5.2 49.8
5.2 49.8
LBT
(°F)
-11.8
BASIS OF DESIGN
ELLIS & WATTS
ESP
(IN.W.G.)
1.0
EBT
(°F)
-15
EAT DB
(°F)
LAT DB
(°F)
-4.2 2.4
FLOW
RATE
(GPM)
WPD
(FT)
APD
(IN W.C.)
0.2
ROWS
WORKING FLUID (BRINE)
VISCOSITY
Cp
5.2
DENSITY
(LB/CF)
49.8
TEMP.
(°F)
- 15
RPM
ELECTRICAL
ACU-13 22
BUILDING 226
ATTIC
3 460 / 3 / 604,750 1.0 -15 35 0.29 8 5.2 49.8 - 15 1750
ACU-14 BUILDING 226
ATTIC
3 460 / 3 / 604,750 1.0 -15 75 0.38 12 5.2 49.8 - 15 1750
- 15
- 15
ACU-13
ACU-14
BUILDING 226
ATTIC
BUILDING 226
ATTIC
APD
(IN. WG.)
0.10
0.075
4,750
EAT
(°F)
-4.2
-3.7
-6.0
LAT
(°F)
150 0.075 34"x40"
0 -3.7
0 -6.0
-11.5
35-12.4
ELLIS & WATTS
ELLIS & WATTS
MOTOR
(BHP)
2.5
RPM
1,652
2.2
2.2
1,553
1,553
ALL
ALL
INDEECO
166X
INDEECO
166X
ALL
ALL
SYSTEM NOTES
SMACNA DUCT PRESSURE CLASS
IN.W.G.
GENERAL NOTES
A. ALL DUCT CONSTRUCTION SHALL BE CONSTRUCTED AS SEAL CLASS A.
B. DUCTWORK LEAKAGE TESTS PRESSURE SHALL BE EQUAL TO THE SMACNA DUCT PRESSURE CLASS.
C. ALL DUCTWORK SHALL BE LEAK TESTED UNLESS OTHERWISE NOTED. LEAKAGE RATES SHALL NOT EXCEED THE LEAKAGE FACTORS FOR THE LEAKAGE CLASS AT THE ASSOCIATED TEST PRESSURE.
SMACNA LEAKAGE
CLASS -
RECTANGULAR
DUCTWORK
SMACNA LEAKAGE
CLASS - ROUND
DUCTWORK
ACU DUCT SYSTEM 6 3
DUCT CONSTRUCTION SCHEDULE
N/A
EXHAUST
2.0
SUPPLY
2.0
RETURN
FPI
1.3
3.8
1150 1.0 400
FLOWSERVE
AG1.5X1-82 M3GD
6.01.311750 2.0 400
FLOWSERVE
AG3X1.5-62 M3GD
FLA
1.8
1.8
2.9
DEFROST SUMP PUMP SCHEDULE
TAG
GPM RPM
25 1150
TDH
(FT)
IMPELLER DIAMETER
(IN)
RATED
7.88
PERFORMANCE
BHP
0.62
MOTOR
HP
1.0
VOLT
PHASE
HZ
NOTES
ALL
SERVICE
ACU-12
BUILDING 226
BASIS OF DESIGN
FLOWSERVE
1E1.5X1SP-82RV
WEIGHT
(LBS)
500P-12A
NOTES:
1. PROVIDE WITH STAINLESS STEEL CONSTRUCTION
2. PROVIDE AS VERTICAL SUBMERSIBLE TURBINE PUMP.
3. PROVIDE WITH THERMAL OVERLOAD PROTECTION
4. PROVIDE WITH EC MOTOR CONTROLLER, FOR SPEED ADJUSTMENTS DURING BALANCING.
5. PROVIDE WITH WORKING FLUID AS LV2 NO-FROST SOLUTION (REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION)
WORKING FLUID
ALL
ALLREFER TO AHU SPECIFICATION25 115025 460 3 60
ACU-13
BUILDING 226
FLOWSERVE
1E1.5X1SP-82RV
P-13A
25 115025 460 3 60
ACU-14
BUILDING 226
FLOWSERVE
1E1.5X1SP-82RV
P-14A
MINIMUM
5.0
7.880.62 1.0 5005.0
7.880.62 1.0 5005.0
TSP
(IN.W.G.)
2.0
2.0
2.0
2. PROVIDE THE FAN ASSEMBLY WITH THE FOLLOWING MAXIMUM ACOUSTIC LEVELS:
SOUND POWER BY OCTAVE BAND (Lw)
INLET
OUTLET
63 HZ 125 HZ 250 HZ 500 HZ 1000 HZ 2000 HZ 4000 HZ 8000 HZ
ALL
ALL
BASIS
OF
DESIGN
TWIN CITY
150/BAE-DW
ACU-12
INLET
OUTLET
ACU-13
INLET
OUTLET
ACU-14
TWIN CITY
150/BAE-DW
TWIN CITY
150/BAE-DW
WEIGHT
(LB)
POWER
(kW)
300 250
BASIS
OF
DESIGN
SUPER RADIATOR
COIL
SUPER RADIATOR
COIL
SUPER RADIATOR
COIL
WEIGHT
(LB)
3,000
2,600
2,900
STAGES
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #19112
D
C
A
B
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
SHEET OF
N
IS
T
O F
P M
G a ith e rs b u rg
M
D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
E
2 3 4 5 6
B U
IL
D
IN
G
R
E P
L A
C E
H V
A C
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
-0
/2
/2
M M
/R T
S
/2
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/2
/2
A
P
S
U B
M
IS
S
IO
N
/2
/2
A
P
S U
B M
IS
S
IO
N
/3
/2
A P
T A
S K
N O
C O
N T
R A
C T
N O
S
B
-1
-C
Q -0
N D
F N
B
F
IN
A L
S U
B M
IS
S
IO
N
/2
/2
C A
K
M-601
SCHEDULES
MECHANICAL
226-443
DDC INPUT/OUPUT POINT SCHEDULE
NOTES
ANALOG BINARY ANALOG BINARY
GENERAL NOTES
1. ALL SETPOINTS ARE ADJUSTABLE.
2. SOFTWARE SHUTDOWN THROUGH THE DDC SYSTEM IS ACCEPTABLE WHERE EMERGENCY SHUT DOWN IS INDICATED UNLESS OTHERWISE NOTED.
3. ALARM SIGNALS SHALL NOTIFY UP TO 3 PEOPLE VIA E-MAIL AS DIRECTED BY NIST.
INPUT TO DDC OUTPUT FROM DDC
TE
M
PE
RA
TU
RE
PR
ES
SU
RE
AI
RF
LO
W
(C
FM
W
AT
ER
FL
O W
(G
PM
HU
M
ID
IT
Y
ST
AT
US
CU
RR
EN
T
SE
NS
IN
G
R
EL
AY
SM
O
KE
D
ET
EC
TO
R
FR
EE
ZE
ST
AT
LE
AK
D
ET
EC
TI
O N
DI
FF
ER
EN
TI
AL
P
RE
SS
UR
E
SE
LE
CT
O
R
SW
IT
CH
AL
AR
M
CE
NT
RA
L
PL
AN
T
ST
AT
US
SE
TP
O
IN
T
AD
JU
ST
M
EN
T
PO
SI
TI
O
N
SP
EE
D
O N
/ O
FF
O
PE
N / C
LO
SE
FA
IL
UR
E
HI
G
H
AN
AL
O
G
LO
W
A
NA
LO
G
HI
G
H
BI
NA
RY
LO
W
B
IN
AR
Y
FA
UL
T
IN
ST
RU
CT
IO
NS
FAILURE PROGRAMS
TI
M
E
SC
HE
DU
LE
LE
AD
/ L
AG
- CO
LO
R G
RA
PH
IC
S
DDC FEATURES
GENERAL
-O
CC
UP
IE
D / U
NN
O
CU
PI
ED
SPECIFIC NOTES
1. FAILURE SHALL BE DETERMINED BY CURRENT SENSING RELAY.
CO
LE
VE
LS
(p pm
AIR CONDITIONING UNIT X
RETURN AIR DAMPER X
RETURN AIR TEMPERATURE SENSOR X X
DISCHARGE AIR TEMP. SENSOR X X
X
FILTER PRESSURE SENSOR X XX
LOCAL LOOP MIXING CONTROL VALVE X
ELECTRIC HEATING COIL X
1X X XSUPPLY FAN
MIXED (BYPASS) AIR DAMPER XX
SUPPLY AIR DAMPER XX
BRINE COIL PUMP X XX
DISCHARGE AIR DEW POINT SENSOR X X
SPACE DEW POINT SENSOR X X
C
C
TO
S
A N
(E
DEFROST SOLUTION SUMP
BRINE COIL
D E
FR
O
S T
S U
P P
LY
V
E N
T V
A
LV
E
S U
M P
W A
TE
R
D R
A
IN
V A
LV
E
BI
S P
R A
Y P
U M
P S
TA
TU
S
BO
S P
R A
Y P
U M
P S
TA
R
T/ S
TO
P
AI
S P
E C
IF
IC
G R
A V
IT
Y
C O
N C
E N
TR
A
TO
R
S E
N S
O R
BO BO BO
D R
A
IN
T O
N O
F R
O S
T S
U M
P
BOBO
FROM EXISTING HOT WATER SYSTEM
FROM EXISTING COLD WATER SYSTEM
FROM EXISTING DSS SYSTEM
BO
C O
LD
W
A
TE
R V
E N
T V
A
LV
E
H O
T W
A
TE
R V
E N
T V
A
LV
E
S U
M P
H O
T W
A
TE
R F
IL
L
V A
LV
E
AO
S U
M P
C O
LD
W
A
TE
R F
IL
L
V A
LV
E
AOAO
D E
FR
O
S T
S U
P P
LY
F
IL
L
V A
LV
E
T
S U
M P
F
LU
ID
T
E M
P E
R A
TU
R
E
AI
S U
M P
L
IQ
U
ID
L E
V E
L
AI
1 DEFROST SYSTEM (ACU-12, 13, 14)
NTS
BRINE COIL LEAVING AIR SENSOR X X
X 1
DEFROST SYSTEM
SPECIFIC GRAVITY PRESSURE
BRINE SPRAY PUMP
DEFROST OVERFLOW VALVE
WATER DRAIN VALVE
DEFROST DRAIN VALVE
X X
X X X 1
X
X
X
HOT WATER FILL VALVE
X
COLD WATER FILL VALVE X
DEFROST SUPPLY FILL VALVE
X
X
X
XHOT WATER VENT VALVE
COLD WATER VENT VALVE
DEFROST SUPPLY VENT VALVE
SUMP LIQUID LEVEL X
SUMP TEMPERATURE SENSOR X X
DDC PANEL
X XDISCHARGE STATIC PRESSURE
SPACE TEMPERATURE SENSOR X X
7 SEQUENCE OF OPERATIONS - ACU TEMPERATURE AND VOLUME CONTROL
NTS
3 SEQUENCE OF OPERATIONS - ACU TEMPERATURE AND VOLUME CONTROL (CONT.)
NTS
S U
M P
D E
FR
O
S T
S O
LU
TI
O N
O V
E R
FL
O
W V
A
LV
E
S U
M P
D E
FR
O
S T
S O
LU
TI
O N
D R
A
IN
V A
LV
E
DDC PANELAI
R E
TU
R
N A
IR
D
E W
P O
IN
T
AI
R E
TU
R
N A
IR
T
E M
P E
R A
TU
R
E
AI
S U
P P
LY
A
IR
D
R Y
B U
LB
AO
E
LE
C
TR
IC
H
E A
TE
R
C O
M M
A N
D
AO
S U
P P
LY
D
A M
P E
R C
O M
M A
N D
AO
R E
TU
R
N D
A M
P E
R C
O M
M A
N D
AO
M
IX
IN
G
D A
M P
E R
C O
M M
A N
D
BO
S U
P P
LY
F
A N
S
TA
R T/
S
TO
P
BI
S
U P
P
LY
F A
N S
TA
TU
S
AI
B R
IN
E
C O
IL
L
E A
V
IN
G A
IR
T
E M
P E
R A
TU
R
E
AI
FI
LT
E R
D
IF
FE
R
E N
TI
A
L P
R E
S S
U R
E
P U
M P
S
TA
R T/
S
TO
P
BOBI
P U
M P
S
TA
TU
S
2 LOW TEMP ACU AND BRINE PUMP CONTROL DETAIL (ACU-12, 13, 14)
NTS
T
AI
S P
A C
E D
R Y
B U
LB
AI
D
IS
C H
A R
G E
S
TA
TI
C
P R
E S
S U
R E
AO
B R
IN
E
C O
IL
L
O C
A L
LO
O
P M
IX
IN
G C
O N
TR
O
L V
A
LV
E
FILTERSDP
T2
C
C
DP
DP
HTBS
HTBR
SUPPLY AIR
C
H
T1
RETURN AIR
T3
Tdp
BI
(R E
FE
R
T O
D E
TA
IL
F
O R
A D
D
IT
IO
N
A L
IN
FO
SP
REFER TO DEFROST
CONTROL DETAIL 1
P
X
X
X
X
X
X
X
X
X
THIS ENVIRONMENTAL CHAMBER IS TO MAINTAIN FINE CONTROL OF DRY-BULB (DB) AND DEW-POINT (DP) TEMPERATURES FOR ROOM DRY-BULBS RANGING FROM 0°F TO 150°F UTILIZING A SPRAYED COIL AIR HANDLING UNIT.
THE CONTROLS FOR THE CHAMBER SHALL BE A MODERN, BACNET COMPLIANT, DIGITAL CONTROL SYSTEM ACCESSIBLE FROM A NIST NETWORK. ALL MODES OF OPERATION REQUIRE ON/OFF CONTROL OF THE CHAMBER CHILLER AND MAIN BRINE LOOP PUMP, AND SETTING/VERIFYING OF THE CHAMBER CHILLER SYSTEM'S MAIN BRINE…