- Install ACU unit in several buildings Federal contract opportunity
- Solicitation number
- 1333ND25RNB190003
About this file
This is a technical file notice indicating that a PDF portfolio requires Adobe Acrobat X or Adobe Reader X (or later versions) for optimal viewing. The image shows a PDF file icon with red accents and the Adobe PDF logo, along with text directing users to "Get Adobe Reader Now!" via a clickable button. This appears to be a standard Adobe software requirement notification page that precedes the actual contract documents, rather than containing any substantive information about the federal contract opportunity for ACU unit installation at NIST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NIST B226 Replace HVAC 100 Submission Specs.pdf | ||
| Amendment 001.docx | DOCX document | |
| Guidelines for Contractors and A-E firms - March 11 2024.pdf | ||
| OFPM Asbetos-containing-material-master-specs_-05012021_Official.docx | DOCX document | |
| NIST B226 Replace HVAC Final Submission Dwgs.pdf | ||
| Material ID.pdf | ||
| RFI Reponses 071723.pdf | ||
| Material Inventory.pdf | ||
| Guidelines for Contractors and A-E firms - May 25 2022.docx | DOCX document | |
| PAYNE-NIST Sprayed Coil Liquid Defrost Air Handler SEQUENCE OF OPERATIONS 210112b.pdf | ||
| NIST B226 Replace HVAC 100 Submission BOD.pdf | ||
| md53 wage rates.txt | TXT text file | |
| FormSF1442.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
HOMOGENEOUS MATERIAL (AREA) SAMPLING/ANALYTICAL SUMMARY
NIST GB - Building 226
MATERIAL CODE:
DS03
ACM STATUS:
ND
MATERIAL DESCRIPTION:
Gray pliable duct sealant
MATERIAL TYPE:
M
FRIABILITY:
NF II
CLASSIFICATION
3 LF per each
COMMENTS:
APPROXIMATE TOTAL QUANTITY
305 EA
SAMPLE # ROOM/LOC SAMPLE LOCATION DESCRIPTION ANALYTICAL SUMMARY
Method Material / Layer Asbestos % and TypeResult
DS03-01 A310-A on duct, 1' from east wall, 8' from floor NDPLM 0.00%
DS03-02 A356 Duct; 7'F, 1'E, 2'N NDPLM 0.00%
DS03-03 MR-28 5'U, 13'W, 16'N NDPLM 0.00%
DS04
ACM
Hard tan duct sealant associated caulk gun applied with squared HVAC duct
5 lf per each
26 EA
DS04-01 B232 Duct; 9'F, 18'N, 12'W ACMPLM 4.00% Chrysotile
DS04-02 A120 Duct; 13'F, 2'W, 9'S NDPLM 0.00%
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
Date Printed: 7/19/2023
DS05
Red duct sealant associated with duct
2 LF each
641 EA
DS05-01 SCB105 Duct; 1'F, 1'N, 1'W ACMPLM 2.00% Chrysotile
DS05-02 MR-31 7'F, 8'E, 15'N on duct ACMPLM 6.00% Chrysotile
DS06
Dark brown pliable duct sealant
80 LF
DS06-01 SCB302 1'F, 0'N, 3'E ACMPLM 3.00% Chrysotile
DS06-02 JM34 Duct; 0'S, 12'W,4'F NDPLM 0.00%
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
DS05
Red duct sealant associated with duct
2 LF each
641 EA
DS05-01 SCB105 Duct; 1'F, 1'N, 1'W ACMPLM 2.00% Chrysotile
DS05-02 MR-31 7'F, 8'E, 15'N on duct ACMPLM 6.00% Chrysotile
DS06
Dark brown pliable duct sealant
80 LF
DS06-01 SCB302 1'F, 0'N, 3'E ACMPLM 3.00% Chrysotile
DS06-02 JM34 Duct; 0'S, 12'W,4'F NDPLM 0.00%
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
DT01
White canvas duct wrap with white sealant and foil backing associated with lab fume hood duct tape
62472 SF
DT01-01 B309-A Duct 8' from floor 3' from N, 3' from E foil backing NDPLM 0.00% wrap NDPLM 0.00%
DT01-02 B345 3' above floor, N wall, 19' E foil backing NDPLM 0.00%
DT02
Older cloth duct wrap with foil and yellow mastic
70 SF
DT02-01 B232 Duct, 10' floor, 3' N, 11' W foil with mastic NDPLM 0.00%
DT02-02 B232 8'F, 2'N, 7'W NDPLM 0.00%
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
DT03
White duct tape associated with mechanical room
360 LF
DT03-01 MR-W 6'F, 20'S, 9'W NDPLM 0.00%
DT03-02 DJ34 6'F,14'N, 1'W
EJM01
Gray expansion joint material
247 LF
EJM01-01 XS2 S wall, 4'F, 0'E NDPLM 0.00%
EJM01-02 XS4 S wall, 4'F, 2'U NDPLM 0.00%
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
MA04
Brown hard duct pin adhesive associated with DT01
61930 SF
MA04-01 B232 10'Floor, 3'N, 10'W ACMPLM 10.00% Chrysotile
MA05
Dark brown remnant duct pin adhesive
14 EA
MA05-01 B232 Duct; 16'N, 12'W ACMPLM 20.00% Chrysotile
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
PF01
PACM
Pipe fittings
T
F
3496 EA
PF02
Hard mag pipe fitting/hanger assoc. 3' wide air o cell insulation
148 SF
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
PH01
Hard pipe hanger associated with PI01
111 EA
PI01
Cloth wrapped over fiberglass pipe insulation with black tar mastic
20419 LF
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
PI02
Hard mag pre-formed pipe insulation
1356 LF
PI03
3' wide Aire-o-cell insulation
798 SF
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
PS01
White painted on pipe sealant associated with newer fiberglass pipe insulation
871 EA
PS01-01 A316-1 Pipe 6' from floor, 3' from N, 3' from E NDPLM 0.00%
PS01-02 B232-A 6'N, 4'E, 2' from floor NDPLM 0.00%
PS02
White painted end associated with Hard foam non suspect insulation
143 EA
PS02-01 MR-31 5'U, 8'S, 6'W NDPLM 0.00%
PS02-02 MR-W 6'u, 8's, 6'w NDPLM 0.00%
MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M=Miscellaneous, FRIABILITY: F= Friable, NF I = Non-Friable Category I, NF II = Non-Friable Category I METHOD: NAA= Not Analyzed – Assumed, NAPS=Not Analyzed - Positive Stop, PLM= Polarized Light Microscopy - Visual Estimate, Point Count= Polarized Light Microscopy - Point Count Method, RESULT: ND = None Detected (No Asbestos Detected), TR/TR-1% = (< or = 1% Asbestos Content), LOCATION: N=North, S=South, E=East, W=West, f=from, ff= feet from MATERIAL TYPE: S=Surfacing, T=Thermal System Insulation, M= Misc Material, MATERIAL FRIABILITY: F=Friable, NF I = Category I Non-Friable, NF II = Category II Non-Friable QUANTITY: SF=Square Feet, LF=Linear Feet, EA=Each
MATERIAL INVENTORY SUMMARY WITH CLASSIFICATIONS
Building 226
Room ID
DJ25
Description
Mechanical Room
North/South Wall Length
East/West Wall Length Height
58 60 12
No Suspect Materials Found.
SACM_ID Material_Description Location ACM Determination
DS05 Red duct sealant associated with duct ‐ Other ACM
DT01 White canvas duct wrap with white sealant and foil backing associated with lab fume hood duct tape
‐ Other ND
DT03 White duct tape associated with mechanical room ‐ Other ND
MA04 Brown hard duct pin adhesive associated with DT01 ‐ Other ACM
PF01 Pipe fittings ‐ Other PACM
PF02 Hard mag pipe fitting/hanger assoc. 3' wide air o cell insulation ‐ Other PACM
PI01 Cloth wrapped over fiberglass pipe insulation with black tar mastic ‐ Other PACM
PI03 3' wide Aire‐o‐cell insulation ‐ Other PACM
PS01 White painted on pipe sealant associated with newer fiberglass pipe insulation
PS02 White painted end associated with Hard foam non suspect insulation
Page 179 of 195Date Printed: 7/19/2023
MATERIAL INVENTORY SUMMARY WITH CLASSIFICATIONS
Building 226
Room ID
DJ28
Description
Mechanical Room
North/South Wall Length
East/West Wall Length Height
46 60 12
No Suspect Materials Found.
SACM_ID Material_Description Location ACM Determination
DS03 Gray pliable duct sealant ‐ Other ND
DS05 Red duct sealant associated with duct ‐ Other ACM
DT01 White canvas duct wrap with white sealant and foil backing associated with lab fume hood duct tape
DT03 White duct tape associated with mechanical room ‐ Other ND
MA04 Brown hard duct pin adhesive associated with DT01 ‐ Other ACM
PF01 Pipe fittings ‐ Other PACM
PF02 Hard mag pipe fitting/hanger assoc. 3' wide air o cell insulation ‐ Other PACM
PI01 Cloth wrapped over fiberglass pipe insulation with black tar mastic ‐ Other PACM
PI03 3' wide Aire‐o‐cell insulation ‐ Other PACM
PS01 White painted on pipe sealant associated with newer fiberglass pipe insulation
PS02 White painted end associated with Hard foam non suspect insulation
Page 180 of 195Date Printed: 7/19/2023
General:
1. Are there noise restric�ons for work in this space?
All work over 80 dBA measured at 15 feet shall occur a�er normal work hours.
Contractor shall have a meter on hand to measure dBA. Reference GUIDELINES FOR
OFPM CONTRACTORS AND A/E FIRMS PERFORMING SITE INVESTIGATIONS AND
FIELDWORK (including construc�on) AT THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY.
2. We assume all work can be completed during normal business hours. If off hours is required, what is the process for base access?
Outages and Noise limits are some of the Out of Hours normal hours ac�ves which is to be coordinated COR. All contractor’s and subs shall obtain Green badges.
3. Curently there are two access points to the work area, (qty:1) general use elevator and an egreess stairwell. Are we allowed to unitize both access points to deliver/remove equipment and material. Please advise.
Both points of access can be used. The elevator and stairway are for public use. At no time should the paths be blocked. The elevator use is limited by the load capacity and cab size to move materials.
4. Is the space considered “confined space” and will need a confined space permit.
Confined spaces are label as such and shall follow the GUIDELINES FOR OFPM
CONTRACTORS AND A/E FIRMS PERFORMING SITE INVESTIGATIONS AND FIELDWORK
(including construc�on) AT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. The contractor’s safety plan shall evaluate the ac�ves for risk if the condi�ons exist.
5. The drawings specify on Sheet 226-438/ Phasing Notes: CONTRACTOR SHALL
COORDINATE WITH THE NIST COR FOR APPROPRIATE PHASING OF CONSTRUCTION,
SHUTDOWN REQUIREMENTS, AND TEMPORARY EQUIPMENT, TO ENSURE THE FACILITY
FUNCTIONS AND OPERATIONS. CONTRACTOR SHALL ONLY DEMOLISH ONE AIR
HANDLER AT A TIME AND SHALL USE THE OLD AIR HANDLERS AS A GUIDE FOR THE
INSTALLATION OF THE NEW AHUs. ONCE NIST IS SATISFIED WITH THE FIRST NEW AHU
INSTALLATION, THEN THE CONTRACTOR SHALL DEMOLISH THE REMAINING TWO (2)
AHUs. During the site visit, there were men�on of the poten�al that all AHUs would be demolished at one �me. How is this project to be phased? One unit at a �me, or all three at once? Please advise.
The units are not currently in service. The contractor may and should demolish all units, then reinstall all units in a single phase.
6. Are we allowed to u�lize the roof to stage the AHUs. We will set AHUs on the roof and bring them down the egress stairwell into our workspace. Please advise if this approach is approved.
The method may be approved pending COR approval of final plan. A better method may be utilizing the attic elevator.
7. Document entiteled NIST B226 Replace HVAC - 100_ Submission Specs incldues specification section 01000 Unit Quantity Work Items, it appears that this specificatison section is not applicable to this project. Please advise.
The specification does not apply but, the bid breakdown with proposal shall show breakdown of material and labor to make up costs.
- Demoli�on & Abatement:
9. NIST will test items suspected to contain hazardous material. We request that NIST test samples are taken from all the insula�on at each AHU. We believe the lines connected to the AHUs are wrapped in asbestos-containing insula�on. Please provide the results from the tes�ng to ensure we capture all the demoli�on/abatement SOW in our bid proposal.
See the attached material types and testing reports of material in the AHUs location.
NIST’s IH can test additional materials during construction before removing if not contained in the report.
- Mechanical:
10. A�er review of all the solicita�on documents received, it appears that the duct cleaning scope of work is not shown. Please confirm if duct cleaning is to be included in the base contract scope of work. If so, please provide the drawing and specifica�ons which details the extent of the duct cleaning scope of work.
The ductwork for these units go to the third floor labs under the units. See Drawings Original drawing. The cleaning shall follow standard The National Air Duct Cleaners Association (NADCA), 2021 edition.
11. The piping systems appear not to have proper isola�on valves to facilitate demo. Can the en�re system be shut down or will outages be needed to add isola�on valves?
Outage and isola�on valves will be required to isolate from the building. Isola�on valves are a part of the scope on drawings.
12. There are exis�ng drain pans. Are these to be reused or replaced?
Provide New Drain Pans.
13. Exis�ng piping appears to be steel pipe. The drawings call to match exis�ng. Can copper pipe be used in lieu of steel? Please advise.
Follow the requirements of the drawings and specifica�ons.
14. Can we use propress piping on these systems?
No
- Electrical:
16. Spec sec�on 260533-3.1.A.3 states that raceways in the following loca�ons shall be
Rigid steel conduit:
a. Loading Dock.
b. Corridors used for traffic of mechanized carts, forkli�s, and pallet-handling units.
c. Mechanical rooms.
Our team has performed work in mul�ple NIST buildings in areas considered mechanical rooms where the raceways were EMT. Can NIST verify whether they will accept EMT for this project in the A�c of B226, or if Rigid steel conduit will be required?
Submit bid as per specifica�ons. Provide bid breakdown on the rigid steel breakdown if requirement is changed in the future via a credit modifica�on.
17. Drawing 226-447 shows P-13A being fed by a 30A non-fused bus duct switch, while the Detail #2 Par�al One-Line Diagram on drawing 226-448 shows all three pumps being fed from fusible 30A bus duct switches. These are likely to be long lead �me items. Can NIST please clarify whether the switch is intended to be fused, or not?”
Both the bus switches and combina�on motor starter disconnects are fused.