H2O Analysis 109690 11182019.pdf

PDF 192 KB Posted

Attached to
NIST Center for Neutron Research Cooling Tower Maintenance and Repair Services
Solicitation number
1333ND20QNB610625
Issued by

About this file

This solicitation seeks maintenance and repair services for cooling towers at the National Institute of Standards and Technology Center for Neutron Research. The scope includes routine maintenance, cleaning, and repairs for two sets of cooling towers that cool the reactor's secondary cooling water. One tower is a 2002 structure with three cells, the other is a 2011 modular tower with two cells. Services are also required for related subsystems like a deicing system, fire protection system, and plume abatement system. The aging right-angle gear drives in cells 1-4 need special attention. The objective is to inspect, clean, perform maintenance, and complete any necessary repairs on the cooling towers and connected subsystems to support continued operations at the Center for Neutron Research reactor facility. The Department of Commerce National Institute of Standards and Technology is the contracting agency.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Component Conducti vity pH Hardness

, total Hardness , calcium

Alkalini ty, total

Phosphon ate

Molybdat e ATP

Make-up Water 446 Record

7.4 Record

Record

Record

Record

1.03 Record

Cooling Tower 1470 1400 max

8.7 8 - 9

600 max

500 max

400 max

4.02 15 max

1.32 1 - 2

150 max

Component Cond.

Cycles

Alk Cycles Hardness

Cycles Phosphat e Cycles

Cooling Tower 3.3 6 max

3.1 6 max

4.0 6 max

3.9 6 max

Inventory Chemstar 120 Amount Previous Delivery Est. Daily Usage Est. Remaining Unit

Cooling Tower 20

0.8750

<28 Days Gallons (US)

Chemstar 509 Amount Previous Delivery Est. Daily Usage Est. Remaining Unit

Cooling Tower 140

0.8750

<98 Days Gallons (US)

Opening Comment During today's visit the following services were performed:

All wet chemistry tests were performed on the make-up water and cooling water.

Adjustments were made where necessary.

Recommendations for improvements were discussed with the operators.

Make-up Water Online The conductivity is down to approximately 450 this week, but it is still higher than normal and is decreasing our cycles of concentration which increases water and chemical use.

Cooling Tower Online All tested parameters are within the control limits.

Based on the current Calcium, phosphate and alkalinity levels in the tower water we can increase the conductivity set point to 1750uS. This will get our cycles up without to account for the increase in make-up water conductivity. The goal is to keep cycles between 4 and 6 where cycles = (tower conductivity/make-up water conductivity).

This will also reduce chemical and water usage.

Closing Comment Thank you for your business. Please do not hesitate to contact us with any questions concerning this report.

Bryan Deal Chemical Engineer 443-417-7954 Email: bdeal@chemstar.pro

Service Report Cooling Tower Report

Monday, November 18, 2019 11:37 AM EST

Center for Neutron Research

NIST

100 Bureau Drive Stop 6101

GAITHERSBURG MD 20899-6101

(301) 975-6957

Report Number: 109690 Recorded By: Bryan Deal

(443) 417-7954 bdeal@chemstar.pro

Research Building - Cooling

International Chemstar, Inc. - 9601 Pulaski Park Drive Suite 406, Baltimore MD 21220 (410) 391-7516

Service Report Cooling Tower Report

Monday, November 18, 2019 11:37 AM EST

Center for Neutron Research

NIST

100 Bureau Drive Stop 6101

GAITHERSBURG MD 20899-6101

(301) 975-6957

Report Number: 109690 Recorded By: Bryan Deal

(443) 417-7954 bdeal@chemstar.pro

Research Building - Cooling

International Chemstar, Inc. - 9601 Pulaski Park Drive Suite 406, Baltimore MD 21220 (410) 391-7516