Attachment F:
Amendment 0001 to Combined Synopsis and Solicitation 1333ND19QNB150306
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
Fire Alarm Systems
Component Periodic Frequency Method NFPA Reference
1. All equipment Annual Inspection NFPA 72- Section 14.3
2. Control equipment
(a) Fire alarm systems monitored for alarm, supervisory, and trouble signals
NFPA 72- Section 14.3, 14.4
(1) Functions Annual Test
(2) Fuses Annual Test and Inspection
(3) Interfaced Equipment Annual Test and Inspection
(4) Lamps and LEDs Annual Test and Inspection
(5) Primary (main) power supply Annual Test and Inspection
(6) Trouble Signals
i. Audible and visual Annual Test
ii. Disconnect switches Annual Test
iii. Ground-fault monitoring circuit Annual Test
iv. Transmission of signals to off-premises location Annual Test
(b) Fire alarm systems unmonitored for alarm, supervisory, and trouble signals
(1) Function Annual Test
(2) Fuses Annual Test
(3) Interfaced Equipment Annual
Test
(4) Lamps and LEDs Annual
(5) Primary (main) power supply Annual Test
(6) Trouble Signals Annual Test
3. Supervising station alarm systems-transmitters
(a) All equipment
Annual
Test and Inspection
(b) Digital alarm communicator transmitter (DACT) Annual Test and Inspection
(c) Digital alarm radio transmitter (DART) Annual Test and Inspection
(d) McCulloh transmitter Annual Test and Inspection
(e) Radio alarm transmitter (RAT) Annual Test and Inspection
(f) All other types of communicators Annual Test and Inspection
4. In-building fire emergency voice/alarm communications equipment
Annual Inspection NFPA 72- Section 14.3,
(a) Amplifier/tone generators Annual Test
(b) Call-in signal silence Annual Test
(c) Off-hook indicator (ring down) Annual Test
(d) Phone jacks Annual Test
(e) Phone set Annual Test
(f) System performance Annual Test
5. Engine-driven generator Annual Test NFPA 72-Section 14.4
6. Secondary (standby) power supply Annual Test NFPA 72-Section 14.4
7. Uninterruptible power supply (UPS) Annual Test NFPA 72-Section 14.4
8. Batteries NFPA 72-Section 14.3,
(a) Lead-acid Annual Inspection
(1) Battery replacement Annual Test
(2) Charger test Annual Test
(3) Discharge test Annual Test
(4) Load voltage test Annual Test
(5) Specific gravity Annual Test
(b) Nickel-cadmium Annual Inspection
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
(1) Battery replacement Annual Test
(2) Charger test Annual Test
(3) Discharge test Annual Test
(4) Load voltage test Annual Test
(c) Primary (dry cell) Annual Inspection
(d) Sealed lead-acid Annual Inspection
(1) Battery replacement Annual Test
(2) Charger test Annual Test
(3) Discharge test Annual Test
(4) Load voltage test Annual Test
9. Remote annunciators Annual Test NFPA 72- Section 14.3,
10. Notification appliance circuit power extenders Annual Inspection
NFPA 72- Section 14.3
11. Remote power supplies Annual Inspection
12. Transient suppressors Annual Inspection
13. Fiber-optic cable connections Annual Inspection
14. Conductors circuit integrity Annual Test NFPA 72- Section 14.4
15. Initiating Devices
(a) Air sampling
(b) Duct Detectors Annual
(c) Electromechanical releasing devices Annual
(d) Fire extinguishing system(s) or suppression system(s) switches
(e) Manual fire alarm boxes Annual
(f) Heat detectors Annual Test
(g) Smoke detectors Annual
(1) Sensitivity testing 5 years Test
(h) Projected beam smoke detectors Annual
(i) Supervisory signal devices Annual Test
(j) Waterflow devices Quarterly
Semiannual Inspection
(k) Carbon monoxide detectors Annual
(l) Multi-sensor fire detector or multi-criteria fire detector or combination fire detector
Annual Test
(m) Fire-gas and other detectors Annual Test
16. Special hazard equipment
(a) Abort switch
NFPA 72- Section 14.4
(b) Cross-zone detection circuit Annual Test
(c) Matrix-type circuit Annual Test
(d) Release solenoid circuit Annual Test
(e) Squibb release circuit Annual Test
(f) Verified, sequential, or counting zone circuit Annual Test
(g) All above devices or circuits or combinations thereof Annual Test
17. Combination Systems
(h) Fire extinguisher electronic monitoring device/systems
(i) Carbon monoxide detectors/systems Annual Test
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
18. Fire alarm control interface and emergency control function interface Semiannual Frequency required by the applicable NFPA standard(s) for the equipment being supervised.
Inspection Test
19. Notification appliances
(a) Audible appliances
(b) Audible textual notification appliances Annual
(c) Visible appliances Annual
20. Exit marking audible notification appliances Annual Test NFPA 72- Section 14.3,
21. Emergency control functions Annual Test NFPA 72- Section 14.4
22. Area of refuge two-way communication system Annual Test and Inspection NFPA 72- Section 14.3,
23. Special Procedures
(a) Alarm verification
NFPA 72- Section 14.4
(b) Multiplex systems Annual Test
24. Supervising station alarm systems-receivers
(a) All equipment
(b) Signal receipt Annual Inspection
(c) Receivers Annual Inspection
25. Public emergency alarm reporting system transmission equipment
(a) Publicly accessible alarm box
(b) Auxiliary box Annual Test and Inspection
(c) Master box
(1) Manual operation
(2) Auxiliary operation Annual Test and Inspection
26. Mass notification system
(a) Functions
(b) Monitored for integrity
(1) Control Equipment
i. Fuses
ii. Interfaces Annual Test and Inspection
iii. Lamps/LED Annual Test and Inspection
iv. Primary (main) power supply Annual Test and Inspection
(2) Secondary power Annual Test and Inspection
(3) Initiating devices Annual Inspection
(4) Notification appliances Annual Test and Inspection
(b) Not monitored for integrity; installed prior to adoption of 2010 edition
(1) Control equipment
i. Fuses
ii. Interfaces Annual
iii. Lamps/LED Annual
iv. Primary (main) power supply Annual
(2) Secondary power Annual
(3) Initiating devices Annual Test
(4) Notification appliances Annual
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
(c) Control unit functions and no diagnostic failures are indicated
Annual Test
(d) Control unit reset Annual Test
(e) Control unit security Annual Test
(f) Audible/visible functional test Annual Test
(g) Software backup Annual Test
(h) Wireless signals Annual Test
(i) Antenna Annual Test and Inspection
(j) Transceivers Annual Test and Inspection
Sprinkler Systems
Component Periodic Frequency Method NFPA Reference
1. Gauges
(a) Wet system gauges
Quarterly 5 years
NFPA 25- Chapter 5
(b) Deluge system gauges Quarterly 5 years
(c) Dry system gauges
(1) Gauges where air pressure supervision is not connected to a constantly attended location
(2) Gauges where air pressure supervision is connected to a constantly attended location
5 years Test
(a) Preaction system gauges 5 years Test
2. Waterflow alarm devices
(a) Mechanical devices
NFPA 25- Chapter 5
(b) Vane and pressure-switch-type devices Quarterly Semiannual
3. Hydraulic name plate Quarterly Inspection NFPA 25- Chapter 5
4. Buildings Annual (prior to freezing weather) Inspection NFPA 25- Chapter 4
5. Hanger/seismic bracing Annual Inspection NFPA 25- Chapter 5
6. Pipe and fittings Annual Inspection NFPA 25- Chapter 5
7. Sprinklers
(a) All
At 50 years and every 10 years thereafter At 75 years and every 5 years thereafter
NFPA 25- Chapter 5
(b) Extra-high or greater temperature solder type 5 years Test
(c) Fast-response At 20 years and every 10 years thereafter
Test
(d) Dry At 10 years and every 10 years thereafter
(e) In harsh environments 5 years Test
8. Sprinklers and automatic spray nozzles protecting commercial cooking equipment and ventilation systems
Annual Test NFPA 25- Chapter 5
9. Spare sprinklers Annual Inspection NFPA 25- Chapter 5
10. Information sign Annual Inspection NFPA 25- Chapter 5
11. Obstruction, internal inspection of piping 5 years Inspection NFPA 25- Chapter 14
12. Heat trace Per manufacturer requirements Inspection NFPA 25- Chapter 5
13. Anitfreeze solution Annual Maintenance NFPA 25- Chapter 5
Fire Pumps
Component Periodic Frequency Method NFPA Reference
1. Pump operation NFPA 25- Chapter 8
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
(a) No-flow condition
i. Diesel engine-driven fire pump
ii. Electric motor-driven fire pump
1. Fire pumps serving high rise buildings
Annual Annual
(b) Flow condition Annual Test
(c) Fire pump alarm signals Annual Test
2. Hydraulic Annual Maintenance NFPA 25- Chapter 8
3. Mechanical transmission Annual Maintenance NFPA 25- Chapter 8
4. Motor Annual Maintenance NFPA 25- Chapter 8
5. Controller, various components Per manufacturer recommendations Maintenance NFPA 25- Chapter 8
6. Diesel engine system, various components Per manufacturer recommendations
Maintenance NFPA 25- Chapter 8
Valves, Valve Components, and Trim
Component Periodic Frequency Method NFPA Reference
1. Control valves
NFPA 25- Chapter 13
(a) All control valves
i. Position
Annual Annual
Maintenance
ii. Operation Annual Test
iii. Supervisory Semiannual Test
2. Valve supervisory signal initiating device Quarterly Inspection NFPA 25- Chapter 13
3. Alarm valves
(a) Interior of valve 5 years Inspection
(b) Strainers, filters, orifices 5 years Inspection
4. Check valves- interior 5 years Inspection NFPA 25- Chapter 13
5. Preaction/Deluge valves
(a) Interior of valve
i. Valves that cannot be reset without removal of a faceplate
ii. Valves that can be reset without removal of a faceplate
5 years Inspection
(b) Strainers, filters, orifices 5 years Inspection
(c) Priming water Quarterly Test
(d) Low air pressure alarms
i. Not installed in valve enclosures
ii. Installed in valve enclosures Annual Test
(e) Full flow Annual Test
(f) Air leakage 3 years Test
6. Dry pipe valves/quick-opening devices
(a) Gauges
i. Gauges on systems with low air or nitrogen pressure alarm
Inspection
NFPA 25- Chapter 13
ii. Gauges on systems without low air or nitrogen pressure alarm
Quarterly Inspection
(b) Interior of valve Annual Inspection
(c) Strainers, filters, orifices 5 years Inspection
(d) Air leakage 3 years Test
(e) Priming water Quarterly Test
(f) Low air pressure alarm Quarterly Test
(g) Quick-opening devices Quarterly Test
(h) Trip test Annual Test
(i) Full flow trip test 3 years Test
7. Pressure-reducing and relief valves
(a) Sprinkler systems
NFPA 25- Chapter 13
(b) Hose connections Annual 5 years
(c) Hose racks Annual 5years
(d) Pressure relief valves Annual Test
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
(e) Circulation relief Annual Test
8. Main drains
(a) Systems where the sole water supply is through a backflow preventer and/or pressure-reducing valves
(b) All other systems Annual Test
9. Gauges 5 years Test NFPA 25- Chapter 13
1. Waterflow devices
(a) Mechanical devices
NFPA 25- Chapter 13
(b) Vane-type and pressure switch-type Semiannually Test NFPA 25- Chapter 13
Carbon Dioxide Extinguishing Systems
Component Periodic Frequency Method NFPA Reference
1. Hose 5 years Test and visible inspection NFPA 12- Section 4.8
2. Carbon dioxide system Annual Test and visible inspection NFPA 12- Section 4.8
3. Size, type, and configuration of the hazard and system Annual Test and visible inspection NFPA 12- Section 4.8
4. Time delays for operation Annual Test and visible inspection NFPA 12- Section 4.8
5. Audible alarms for operation Annual Test and visible inspection NFPA 12- Section 4.8
6. Visible alarms for operation Annual Test and visible inspection NFPA 12- Section 4.8
7. Warning signs Annual Inspection NFPA 12- Section 4.8
8. High pressure cylinder weights Semiannual Inspection NFPA 12- Section 4.8
Wet Chemical Extinguishing Systems
Component Periodic Frequency Method NFPA Reference
1. System Annual Maintenance NFPA 17A- Chapter 7
2. Fixed temperature sensing element- fusible metal alloy type Annual Maintenance NFPA 17A- Chapter 7
3. Wet chemical containers 12 years Test-Hydrostatic NFPA 17A- Chapter 7
4. Auxiliary pressure containers 12 years Test-Hydrostatic NFPA 17A- Chapter 7
5. Hose assemblies 12 years Test-Hydrostatic NFPA 17A- Chapter 7
Clean Agent Extinguishing Systems
Component Periodic Frequency Method NFPA Reference
1. System Annual Test and Inspection NFPA 2001- Chapter 7
2. Agent quantity and pressure Semiannual Inspection NFPA 2001- Chapter 7
3. Pressure gauges Annual Inspection NFPA 2001- Chapter 7
4. Factory-charges, nonrefillable containers that do not have a means of pressure indication Semiannual Inspection NFPA 2001- Chapter 7
5. Clean agent cylinders 5 years Inspection NFPA 2001- Chapter 7
6. Hose Annual
5 years Inspection Test
NFPA 2001- Chapter 7
7. Enclosure Annual Inspection NFPA 2001- Chapter 7
Explosion Prevention and Control Systems
Component Periodic Frequency Method NFPA Reference
1. Vent closures Annual Inspection NFPA 68-Chapter 11
2. Explosion prevention systems Quarterly Test and inspection NFPA 69-Chapter 15
Commercial Cooking Suppression Systems
Component Periodic Frequency Method NFPA Reference
1. System Semiannual Maintenance NFPA 96-Chapter 11
2. Fusible links- metal alloy type Semiannual Replace NFPA 96-Chapter 11
3. Automatic sprinklers- metal alloy type Semiannual Replace NFPA 96-Chapter 11
4. Detection devices that are bulb-type automatic sprinklers and fusible links Annual Inspection and maintenance NFPA 96-Chapter 11
5. Fixed temperature-sensing elements other than the fusible metal alloy type
Annual Inspection and maintenance NFPA 96-Chapter 11
6. Grease buildup
NFPA 96-Chapter 11
Fire Alarm and Suppression System Testing, Inspection, Maintenance and Repairs on the Gaithersburg Campus
(a) Systems serving moderate-volume cooking operations
Semiannual Inspection and maintenance
(b) Systems serving low-volume cooking operations Annual Inspection and maintenance
7. Cooking equipment Annual Inspection and maintenance NFPA 96-Chapter 11