About this file
These seawater system schematic drawings detail a comprehensive engineering design for a marine facility's seawater infrastructure at the NOAA Hollings Marine Laboratory. The technical drawings (M5.01 through M5.04) include detailed schematics for seawater intake, main seawater pumps, settling tanks, piping supports, and system routing, with specific technical specifications such as pipe dimensions (ranging from 80mm to 250mm), material types (predominantly PVC and stainless steel), and installation requirements. Key system components include four settling tanks (each 48,000 gallons), multiple seawater pumps (MSP-1 through MSP-4 rated at 450 GPM), water intake screens, and extensive piping networks connecting various facility structures including the Mehrl Building and SCDNR Building. The drawings provide granular engineering details on pump suction configurations, ground and horizontal piping supports, elevation specifications, and installation notes, with annotations specifying structural connections, support spacing, and critical installation parameters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4-
2-
F
4-
2-
T
C on su lt in g
En gi ne er in g
G ro up
O ne N or th si de
A tl an ta G eo rg ia
SY
C
SY
C
M5.01
M5.06
M5.04
ROUTE PIPING ON TOP OF CONCRETE STEAM TRENCH. COVER PIPING WITH 300 MM OF
SOIL. SEE CIVIL DRAWING C1.01 FOR EXACT TRENCH LOCATION.
LOCATE PIPING UNDER SCDNR BUILDING.
SEE CIVIL DRAWING C1.01 FOR UNDERGROUND PIPING.
CONNECT THE (2) 80 MM SWS PIPES TO THE EXISTING (2) 80 MM
SEAWATER PIPES INSTALLED IN THE MEHRL BUILDING PROJECT.
CONNECT THE (2) 200 MM SWR PIPES TO THE EXISTING (2) 200 MM
(1) 150, (2) 200, AND (2) 150
PVC SEAWATER PIPING
(2) 200 SEAWATER PIPING
IN CRAWL SPACE
(1) 150 PVC, (2) 200 PVC, (2) 150 PVC
SEAWATER PIPES INSTALLED IN THE MEHRL BUILDING PROJECT.
SW
R
SW
S
SW
SSW
R
(2) 200 SWR & (2) 80 SWS
SEE CIVIL DWG. C1.01
FOR CONTINUATION
SEE DWG. M1.10
MEHRL BUILDING PROJECT
FOR CONTINUATION
Xref Q:\96n258-004.PRJ\Fjt.dwg
CONNECT 25 mm DOMESTIC COLD WATER TO EXISTING COLD WATER LINE6
SEE DWG. M5.2 FOR VALVES AND
ACCESSORIES NOT SHOWN.
KEY NOTES:
7 INSTALL PIPING UNDER WALKWAY WITH A MINIMUM OF 300 MM OF COVER.
SEE DWG. M5.2 FOR VALVES AND
ACCESSORIES NOT SHOW
SEE DWG. M5.2 FOR VALVES AND
ACCESSORIES NOT SHOWN
SW
R5
SW
R4
SW
R3
SW
R2
SW
R1
IN MECH. RM. OF ADMINISTRATION BUILDING. PIPING OUTSIDE OF BUILDING
SHALL BE PVC. PROVIDE BACKFLOW PREVENTER AT CONNECTION TO EXISTING
DOMESTIC COLD WATER SYSTEM. SEAL WALL PENETRATION WATER-TIGHT.
PROVIDE ESCUTCHEON.
Xref Q:\96N258-004.prj\Swroute.dwg
(2) 150 SEAWATER PIPING
IN CRAWL SPACE
(2) 80 MM CONNECTIONS WITH BLIND FLANGE FOR FUTURE USE9
SEE PIPING SUPPORT DETAIL
ON DWG. M5.03/3.
SEE STRUCTURAL DRAWING S6.01
AND DETAILS ON DWG. M5.03
SEAWATER SYSTEM SITE PLAN
N
PROVIDE CONNECTION TO SCDNR BUILDING SEAWATER SYSTEM AT DISCHARGE
OF EXISTING SECONDARY SEAWATER PUMP LOCATED AT THE SCDNR
LABORATORY BUILDING.
COORDINATE THIS WORK WITH SCDNR AND THE COTR.
BY SCDNR OR OTHERS.
SEE CIVIL DWG. C1.10
AND CIVIL SPECIFICATIONS
FOR PIPING ROUTING AND
MATERIALS.
COORDINATE PIPING WITH EXISTING CONDITIONS IN THIS LOCATION.
GE
NE
RA
L
RE
VI
SI
ON
-1
3-
SY
C
MAIN SEAWATER PUMPS
OUTDOOR TANKS
MEHRL BUILDING
33 GPM
STANDBY
24 HRS/DAY
33 GPM
SETTLING TANKS
MSP-3
450 GPM (28.35 L/S)
24 HR/DAY
STANDBY
450 GPM (28.35 L/S)
MSP-2
MSP-1
RAW SEAWATER SETTLED SEAWATER
150 mm PVC
(4 TANKS @ 48,000 GALLONS EACH)
4-
2-
F
4-
2-
T
C on su lt in g
En gi ne er in g
G ro up
O ne N or th si de
A tl an ta G eo rg ia
250 mm (TYP.4)
200 mm
SEA
200 mm PVC
80 mm
SY
C
SC
S
M5.02
PCV-3
PCV-2
PCV-1
MV-4
MV-3
MV-2
MV-1
SWR 1
SWR 2
SWR 3
SWR 4
SWR 3
SWR 4
SWS 4
SWS 3
SWR 4
SWR 3
MV-8
TFV-2 TFV-1
TFV-3 TFV-4
SSP-1
SSP-2
SWS 3
SWS 4
PUMP CONCRETE PAD (SEE STRUCTURAL DWGS.)
80 80
80 mm
200 mm
MV-7
MV-6
MV-5
200 mm
80 mm 80 mm
KEY NOTES:
SEE DRAWING 1/M5.03 FOR ADDITIONAL CLEANOUTS
NOT INCLUDED ON THIS DRAWING.
250 mm OVERFLOW PIPE
TANK 2 TANK 1
TANK 3 TANK 4
80 mm
450 GPM (28.35 L/S)
24 HR/DAY
LEGEND
TANK FILLING VALVE
TANK DRAW-DOWN VALVE
SUMP DRAIN VALVE
PUMP CONTROL VALVEPCV - #
SDV - #
TDV - #
TFV - #
CONTROL VALVE SCHEDULE
NO.
TFV
NOTES:
PO/SC - POWERED OPEN/SPRING CLOSED
ACTUATOR
POSITION PROOF
END SWITCH
PC/SO - POWERED CLOSED/SPRING OPEN
PC/SO OPEN
TDV PO/SC CLOSED
SDV PO/SC CLOSED
PCV PC/SO CLOSED
50 mm DISCHARGE
TO THE SEA (TYP.5)
TDV-3
SDV-3
TDV-4SDV-4
SDV-1
SDV-2
100 mm DRAIN TERMINATE OVER TRENCH
SWS 1
PUMPS
SETTLED SEAWATER
DRAIN VALVES FULL SIZE OF LINE (TYP.)
Xref Q:\96n258-004.PRJ\Fjt.dwg
MSP-4
PCV-4
450 GPM (28.35 L/S)
24 HR/DAY
MV-5
SWR 5 SWR 5
PROVIDE CONNECTION TO SCDNR BUILDING SYSTEM
80 mm
150 mm
80 mm PVC
150 mm (TYP.4) m m m m
80 mm (TYP.4) 200 mm (TYP.4)
150 mm PVC
80 mm
150 mm PVC
200 mm PVC
150 mm SWR PUMP SUCTION
FROM WATER INTAKE SCREEN.
SEE DWG. M5.01 FOR
CONTINUATION (TYP.4)
25 mm PVC
20 PVC
25 PVC
20 PUMP COOLING WATER VALVE (TYP.4)
N.I.C.
SEE CIVIL DWG. C1.10
AND SPECIFICATIONS.
SEE KEY NOTES 4 AND 5 ON
DRAWING M5.01 FOR PIPING
CONNECTION LOCATION TO MEHRL
SEAWATER PIPING.
CO
CO
CO
CO
CO
CO
ROUTE 100 MM
DRAIN PIPE TO OVER
EXISTING INGROUND
DISTRIBUTION TANK.
(TYP.3)
32 mm BALL
VALVE WITH
HOSE CONNECTION
LOCATE VALVES AND ACCESSORIES BEFORE
SWR3 AND SWR4 ENTER SCDNR CRAWL SPACE
AT A LOCATION APPROVED BY THE COTR.
CO
m m
32 mm DOMESTIC COLD WATER
SEE DWG. M5.04/3 FOR CONT.
32 mm m m
IN ADDITION TO THOSE SHOWN, PROVIDE CLEANOUTS NOT MORE THAN
EVERY 50 METERS FROM MAIN SEAWATER PUMPS TO THE SETTLING TANKS
AND ON ALL RUNS TO THE CONNECTION WITH THE EXISTING MEHRL PIPING.
CLEANOUTS SHALL BE LOCATED AT THE ELBOWS WHEREVER POSSIBLE, AND
THEIR PROPOSED LOCATIONS SHALL BE SUBMITTED TO THE COTR FOR
APPROVAL PRIOR TO INSTALLATION.
B
B
STRAIGHT LENGTH OF PUMP SUCTION PIPE SHALL BE4
350 MM MINIMUM.BFP
ADMINISTRATION BUILDING
MECHANICAL ROOM
EXISTING DOMESTIC COLD WATER SYSTEM
CONNECT TO EXISTING
25 mm PVC
F A
TO FLOOR DRAIN
SEE CIVIL DWG. C1.10
AND SPECIFICATIONS
TO THE SEA
50 mm DISCHARGE
TDV-2 TDV-1
SWS 2
25 mm
BLIND FLANGE FOR FUTURE USE
BY SCDNR OR OTHERS (TYP.2)
SEE DWG. M5.01 FOR LOCATION.
CAPPED FOR FUTURE USE BY
SCDNR OR OTHERS (TYP.2)
COPPER TO PVC UNION
NEW 25 COPPER DOMESTIC COLD WATER PIPING
N
SEAWATER SYSTEM SCHEMATIC DIAGRAM
GE
NE
RA
L
RE
VI
SI
ON
-1
3-
SY
C
80 80
20 DRAIN VALVE (TYP.4)1
4-
2-
F
4-
2-
T
C on su lt in g En gi ne er in g G ro up
O ne N or th si de
A tl an ta G eo rg ia
SY
C
SY
C
M5.03
MAIN SEAWATER PUMPS RISER DIAGRAM
NO SCALE
MSP-4
MSP-3
MSP-2
PUMP SUCTION PIPE
304.8 Ø mm
Xref Q:\96N258.PRJ\fjt.dwg
MSP-1
12.5 mm X 12.5 mm SLOTS
NO SCALE
DIRT COVER
CONCRETE STEAM TRENCH COVER
SEE CIVIL DWG. C1.01 FOR EXACT
TRENCH LOCATION.
SEAWATER PIPING SUPPORT
NO SCALE
300.0
1235.0
50.0 (TYP.)
150 SWR TYPE 316
STAINLESS STEEL PIPE
m m
50 MM INSIDE DIAMETER
LIFTING LUG
M5.03
M5.03
M5.03
1200 mm
MAIN SEAWATER PUMP SUCTION5
M5.03 SCALE: 1:25
SEA FLOOR
WOOD STRUCTURE
SEE STRUCTURAL DWGS.
PILE (TYP.)
MAIN SEAWATER PUMP
PILE. SEE STRUCTURAL DWGS.
150 mm PUMP SUCTION PIPING
-814.00 MLW
2550.00
AT SETTLING TANKS
M5.03
NO SCALE HORIZONTAL GROUND PIPING SUPPORT8
M5.03 NO SCALE
SEE STRUCTURAL DWGS.
SEE STRUCTURAL DWGS.
SEA WATER PIPING
NOTE 1
SEAWATER PIPING
NOTE 1
NOTE 1: SEE DWGS. M5.03 AND M5.04 FOR
PIPE SIZES AND PIPING SUPPORT LOCATIONS.
NOTE 1: SEE DWGS. M5.03 AND M5.04 FOR
PIPE SIZES AND PIPING SUPPORT LOCATIONS.
1. IN ADDITION TO THE FOUR WATER INTAKE SCREENS
NOTES:
PROVIDE ONE ADDITIONAL WATER INTAKE SCREEN FOR
USE AS SPARE. DELIVER SPARE SCREEN TO OWNER.
THE WATER INTAKE SCREEN MANUFACTURER SHALL FABRICATE THE SCREEN
2. DETAILS SHOWN ABOVE ARE INTENDED TO ILLUSTRATE THE GENERAL ARRANGEMENT.
AS REQUIRED TO WITHSTAND THE FORCES PRESENT IN AN OCEAN ENVIRONMENT.
150 SWR BELOW SEA FLOOR.
SEE DWG. M5.01.
100 MM CONCRETE PAD
UNDEGROUND PIPING.
SEE DWG. C1.10.
SEE DWG. M5.06 FOR
PUMP AND PIPING LAYOUT
HORIZONTAL PIPING SUPPORT
MAIN SEAWATER PUMP6
M5.03 SCALE: 1:25
SEE DWG. M5.01
FOR CONTINUATION
SEA BOTTOM
750 mm
150 Ø PVC
TYPE 316 STAINLESS STEEL
BOLTED FLANGE
INTAKE SCREEN INLET
SUPPORTS. SEE
STRUCTURAL DWGS.
TYPE 316 STAINLESS STEEL U-BOLT
M5.03
WATER INTAKE SCREEN AND
STAINLESS STEEL U-BOLT (TYPICAL)
PILE (TYP.)
(4) 150 SWR.
SEE DWG. M5.01.
SEE STRUCTURAL DWGS.
SEE STRUCTURAL DWGS.
FOR INTAKE SCREEN AND
PIPING SUPPORT MATERIAL
AND MOUNTING.
EXISTING RIPRAP
PIPE SUPPORT.
SEE STRUCTURAL DWGS.
PILE (TYP.)
CO
CO
CO
CO CO
CO
CO
CO
CO
CO
CO
EQ. EQ. EQ.EQ. EQ.
PIPE SUPPORT. SEE STRUCTURAL DWGS.
PUMP SUCTION PIPING SUPPORTS9
M5.03 SCALE: 1:25
WATER INTAKE SCREEN AND
SEAWATER PIPING (1) 150 SWR, (2) 200 SWR, (2) 150 SWR
SEE DWG. M5.01 FOR PIPE ROUTING.
150 mm Ø TYPE 316
STAINLESS STEEL OUTLET
PIPE WELDED TO BOTTOM
OF INTAKE SCREEN
50 mm DISCHARGE TO THE SEA VALVE (TYP.6)
150 TYPE 316
STAINLESS STEEL
STUDED FLANGE
ABOVE STEAM TRANCH
SEAWATER SYSTEM DETAILS
SWR5 SWR4
SWR3
SWR2
SWR1
TYPE 316 STAINLESS STEEL
BOLTED FLANGE
Xref Q:\96N258.PRJ\fjt.dwg
SETTLING TANKS
(SEE STRUCTURAL DRWS.)
SY
C
SY
C
M5.04SETTLING TANK SECTION3
M5.04 SCALE: 1 = 50
SETTLING TANK SECTION2
M5.04 SCALE: 1 = 50
M5.04
M5.04
SAFETY CHAIN
(TYP.)
OPEN END OVERFLOW PIPE (TYP.)
250 ∅ PVC
SSP-1
SSP-2
SETTLING TANK PLAN1
M5.04 SCALE: 1 = 50
250 ∅ PVC
OPERATING LEVEL
(2) 80 TO MEHRL BLDG.
SEE SECTION ABOVE ON
THIS DRAWING
(2) 150 FROM MAIN
SEAWATER PUMPS
SEE DWG. M5.01
FOR CONTINUATION
TANK 3
TANK 2
TANK 4
TANK 1
NOTE 2
NOTES REFERENCED ON THIS DRAWING:
32 MM VALVE WITH
HOSE END CONNECTION
PIPE SUPPORT
SEE STRUCTURAL
DWGS.
OVERFLOW (TYP.4)
TANK FILLING VALVES
TANK FILLING
VALVES (TYP.4)
SUMP DRAIN PIPING (TYP.4)
WALKWAY
SCDNR BUILDING
CRAWL SPACE
BFP
NOTE 3 NOTE 3
SEE STRUCTURAL DRAWINGS
FOR SETTLING TANK CONSTRUCTION
NOTE 1 (TYP.4)
SUMP
SUMP
SUMP
DRAIN
NOTE 1
N
SWR1
SWR2
SWS2
SEE DWG. M5.01 AND C1.10 FOR CONTINUATION
OF PIPING ROUTED TO MEHRL BUILDING
32 mm DOMESTIC COLD WATER
PIPE SUPPORT SEE STRUCTURAL DWGS.
PIPE SUPPORT
SEE STRUCTURAL
DWGS.
PIPE SUPPORT
SEE STRUCTURAL
DWGS.
DO
W N
SWR1
SWR2
32 mm DOMESTIC
COLD WATER
SEE M5.04/3 FOR CONTINUATION
OF PIPING ROUTED TO DOCK
NOTE 5 (TYP.)
NOTE 5 (TYP.)
OVERFLOW (TYP.)
TANK DRAIN PIPING (TYP.)
NOTE 5
(TYP.)
NOTE 5
STRAINERS SEE NOTE 1
EL 4000
B/ FDN
EL -1150
T/GRADE
EL 0000
T/WALL
EL -405
EL 600
TANK #2 TANK #3
EL 300
(T
YP
EL -1150
EL 374
T/WALL
EL 3644
EL 4000
OPERATING LEVEL
GROUND LEVEL
OVERFLOW LEVEL
SETTLING LEVEL SETTLING LEVEL
CONCRETE PAD (TYP.2)
SWR1
SWR2
100 mm DRAIN
100 mm DRAIN
WATER LEVEL CONTROL (TYP. 4)
SEE DWG. M5.05/1 FOR DETAILS
150 150
1. SEE DWG. M5.02 FOR PIPE SIZES, VALVES, AND ACCESSORIES NOT SHOWN ON THIS DRAWING.
2. 32 MM DOMESTIC COLD WATER PIPE CONNECT TO EXISTING DOMESTIC COLD WATER PIPE LOCATED IN CRAWL SPACE OF SCDNR BUILDING. DOMESTIC COLD WATER PIPING AND ACCESSORIES OUTSIDE OF SCDNR BUILDING SHALL
BE PVC.
3. LOCATE PIPING ON THE GROUND WITH 300 MM MINIMUM COVER.
4. SEE SPECIFICATION FOR PIPING SUPPORT SPACING REQUIREMENTS NOT NOTED ON THIS DRAWING.
5. PROVIDE PIPING SUPPORTS EVERY 1500 mm FOR PIPE SIZES 80 mm AND SMALLER AND EVERY 2000 mm FOR PIPE SIZES LARGER THAN 80 mm.
ALSO PROVIDE SUPPORTS AT EACH ELBOW AND VALVE AND AS REQUIRED FOR A RIGID SECURE INSTALLATION.
(NOT ALL REQUIRED SUPPORTS ARE SHOWN.)
6. CONTRACTOR SHALL DETERMINE EXACT PIPE ROUTING AND ELEVATIONS PRIOR TO FABRICATING STEEL PIPE
SUPPORTS SHOWN ON STRUCTURAL DRAWINGS.
7. PIPING PENETRATIONS AT THE SETTLING TANKS SHALL BE MADE WATERTIGHT WITH LINK-SEAL. SEE LINK-SEAL
DETAIL ON STRUCTURAL DRAWINGS. (TYPICAL)
EL 900EL 900
AIR COMPRESSOR ON CONCRETE PAD
UNDER STAIR LANDING.
32 mm VALVES FOR FUTURE CONNECTION
SEAWATER SETTLING TANKS
GE
NE
RA
L
RE
VI
SI
ON
-1
2-
SY
C
80 mm CROSSOVER.
SEE DWG. M5.02.
| fjn9m501 |
| Model |
| Layout1 |
| fjtkm502 |
| Model |
| Layout1 |
| fjtkm503 |
| Model |
| fjtkm504 |
| Model |
| Layout1 |
| Intake Drawing |
| Seawater Schematic |
File details come from the government source that posted it. Updated .