13166 Selection Notice.docx

DOCX document 58 KB Posted

Attached to
13166 Water Well Design, Permitting & Construction Oversight
Solicitation number
S-63400-00014299
Issued by
Marion County, Oregon

About this file

This is an evaluation summary document from the Oregon Parks and Recreation Department (OPRD) regarding the selection of a contractor for RFP #13166, titled "Water Supply Well Design, Permitting & Construction at Silver Falls State Park." The project encompasses comprehensive water supply well services including conceptual design, well-siting evaluation, Oregon Health Authority initial plan review, specification preparation, construction oversight, and documentation for the development of one to three new wells at Silver Falls State Park. The RFP solicitation required proposers to submit maximum 10-page electronic proposals through the OregonBuys system by July 30, 2025. The evaluation process has been completed, and OPRD intends to enter into one contract with the highest-ranked proposer. The contract term extends through October 30, 2026, and encompasses six primary project phases: programming, schematic design, design development, construction documents, bidding services, and construction contract administration.

The evaluation scoring was distributed across three criteria categories: professional background (45 points), service delivery and customer care (25 points), and analysis and evaluation (30 points), with a total possible score of 100 points. Three proposers were ranked based on their evaluation scores: Terraphase Engineering Inc (94.00 points), GSI Water Solutions, Inc (93.67 points), and Landau Associates, Inc (92.67 points). The procurement encouraged participation from small businesses certified by the Oregon Certification Office for Business Inclusion and Diversity (COBID), with potential price preferences available for Oregon-based services. The contract includes fixed-price primary services, potential contingency services, and reimbursable expenses. All proposers were required to meet comprehensive insurance requirements, including workers' compensation, commercial general liability, automobile liability, professional liability, and excess/umbrella insurance, as well as demonstrate business responsibility and compliance with equal opportunity participation standards.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION SUMMARY

Oregon Parks and Recreation Department 725 Summer St. NE, Ste C

PROJECT TITLE: 13166 Water Supply Well Design, Permitting & Construction at Silver Falls State Park

OregonBuys #: S-63400-00014299

RFP #: 13166

The Oregon Parks and Recreation Department (OPRD) has completed its evaluation process for the above solicitation. It is OPRD’s intent to enter into one contract with the highest ranked proposer.

PROPOSER
TOTAL SCORE
1. Terraphase Engineering Inc
94.00
2. GSI Water Solutions, Inc
93.67
3. Landau Associates, Inc
92.67

image1.jpeg

File details come from the government source that posted it. Updated .