This document is a Requests for Information (RFIs) log for the Montlake Radioactive Materials Program Decommissioning project, RFQ Number 1305M326Q0486, issued by NOAA. The RFI log compiles 75 bidder inquiries received on 28-August-26 with responses issued by the client/Subject Matter Experts on 31-August-25, with response dates documented as 3-September-26.

The project involves decommissioning and radiological survey work at the NOAA Northwest Fisheries Science Center Montlake Laboratory facility, a government-owned federal complex constructed in 1963. Key project scope includes: disposal of four primary waste drums (1A, 2A, 5A, 6A) containing H-3, C-14, and I-125 radioactive materials, with one consolidated shipment anticipated at firm-fixed-price (FFP) on a per-drum unit basis; decommissioning of two PerkinElmer Packard Tri-Carb Liquid Scintillation Counters (S/N 103840 and 422739), one PerkinElmer Packard TopCount NXT Microplate Counter (S/N 429550), and one Thermo Niton Lead-Based Paint XRF Analyzer (S/N 6562) containing sealed internal radioactive sources; disposal of 300-500 pounds of lead shielding from loose lead pigs and internal instrument shielding; and characterization and disposal of mixed waste containing organic solvents such as toluene. The survey scope encompasses Room 413E (primary laboratory, approximately 373 square feet), Rooms 421E and 307E containing radiological equipment, and the waste storage shed, following MARSSIM principles with Class 3 survey methodology and ANSI/HPS N13.12-2013 clearance criteria of 6,000 dpm/100 cm². Transportation and disposal costs are firm-fixed-price. The facility operates under NRC License No. 46-06377-04 Amendment 45, valid until 9/30/2039, with oversight by NRC Region IV. The contractor shall support NOAA through final NRC review and license termination with a target contractual milestone of 28-February-2027 for deliverable completion, though the current NRC license expiration is 2039. Contractual acceptance authority rests with the NOAA Contracting Officer with review and concurrence by the NOAA Radiation Safety Officer and subsequent NRC approval. Discovery of unforeseen pre-existing contamination exceeding clearance limits will be processed via formal contract modification procedures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI # Date Recv'd RFI Date Sent to Client/SME

Client/SME Response Response Date

1 27-Aug-26 Please confirm the approximate actual volume of radioactive waste currently requiring disposal, including the estimated volume/fill level of the five (5) 55-gallon drums;

the anticipated number of shipments; and the maximum contact radiation dose rate (mR/hr) for each waste container. The SOW identifies five 55-gallon metal drums (275 gallons total container capacity), but does not state that the drums are full, nor does it specify the number of shipments or maximum contact dose rate.

31-Aug-25 Bidders shall assume the four primary waste drums (1A, 2A, 5A, 6A) are at least ¾ full. External contact radiation dose rates for all containers are at ambient background levels (< 0.1 mR/hr) due to the total decay of short-lived I-125 and the shielding of low-energy beta emitters (H-3, C-14) by the steel drum walls. One consolidated shipment is anticipated, and disposal costs are firm-fixed-price on a per-drum unit basis.

3-Sep-26

2 28-Aug-26 Please provide the exact serial numbers of the two Liquid Scintillation counters and the Niton XLP instrument.

31-Aug-25 Serial numbers, models, and locations for site counting equipment and analyzers are:

1) Room 421E: PerkinElmer Packard Tri-Carb Liquid Scintillation Counter, Model B1900, S/N: 103840.

2)Room 307E: PerkinElmer Packard Tri-Carb Liquid Scintillation Counter, Model 1600 TR, S/N: 422739.

3)Room 413E: PerkinElmer Packard TopCount NXT Microplate Scintillation & Luminescence Counter, Model C9912V0, S/N: 429550 (MFG Date: August 2002).

4)Portable Analyzer: Thermo Niton Lead-Based Paint XRF Analyzer, Model XLp Series, S/N: 6562.

3-Sep-26

3 28-Aug-26 Please provide the exact radionuclides and their total quantity of radioactivity for the two Liquid Scintillation counters and the Niton XLP instrument.

31-Aug-25 Radionuclides and activity levels associated with the sealed internal sources in this equipment are:

1) Thermo Niton XLp (S/N 6562): Contains either Cd-109 (40 mCi nominal as of 06/15/2007; decayed to < 0.0011 mCi) or Am-241 (4.5 uCi as of 02/26/2004; currently approx 4.34 uCi).

2) Tri-Carb LSCs (S/N 103840 & 422739): Each unit contains an internal, heavily shielded sealed external standard source (Ba-133 or Eu-152, approx 1 to 10 uCi).

3) TopCount NXT (S/N 429550): Microplate counter system; contractor shall inspect for associated external microplate check sources during mobilization.

3-Sep-26

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

4 28-Aug-26 Please provide the estimated quantity of lead the contractor is required to dispose.

31-Aug-25 The total estimated quantity of lead to be surveyed, cleared, or dispositioned by the contractor is 300 to 500 pounds, consisting of:

1) Loose Lead Pigs & Shielding: Approximately 200 pounds of standalone lead pig storage containers and brick/plate shielding requiring surface survey and release in accordance with NUREG-1556 Vol 7 / ANSI N13.12 criteria.

2) Internal Instrument Shielding: Approximately 100 to 300 pounds of internal structural lead shielding surrounding detector assemblies inside the two Tri-Carb LSCs, TopCount NXT, and Niton unit.

3-Sep-26

5 28-Aug-26 I was unable to attend the site visit. Would it be possible for NOAA to share any photographs of the laboratory spaces and other areas included in the scope? If photos are available, we thought they would be helpful for our team to better understand the facility layout and existing conditions as we develop our technical approach. If not, no problem at all.

31-Aug-25 Yes, photographs of the laboratory spaces are provided across the attached documentation:

Room 413E: Comprehensive photographs detailing workbenches, cabinets, fume hoods, freezers, sinks, and equipment are provided in Appendix F of Attachment 1 (FINAL STATUS SURVEY REPORT

ROOM 413E – 6/26/2023).

Rooms 309E and 421E: Four (4) additional laboratory photographs (Photos 2 through 5) depicting the physical layout and current conditions of Labs 309E and 421E are included in Exhibit A.

3-Sep-26

6 28-Aug-26 Are we able to obtain copies of the surveys in Lab 413E that were conducted in support a 2023 release survey?

31-Aug-25 Yes, the complete Final Status Survey Report for Room 413E (prepared by NW Radiation Services, Inc., dated June 26, 2023) is provided.

3-Sep-26

7 28-Aug-26 How is the holday period handled at this site? Are we allowed to work during the Montlake Laboratory holidays if different from our observance?

31-Aug-25 The facility is a federal installation. Work schedules during federal holidays or outside normal business hours must be coordinated in advance with the NOAA Contracting Officer Representative (COR) and site security.

3-Sep-26

8 28-Aug-26 Are routine surveys available for our review during the generation of the response to the RFQ? This will help us determine what survey instrumentation is being used and what we will need to use.

31-Aug-25 Quarterly contamination survey records show zero detectable surface contamination in active laboratory work areas since 2019. Bidders should plan to utilize standard calibrated radiological instrumentation, including GM pancake detectors (e.g., Ludlum 14C / 44-9), low-energy NaI scintillators (e.g., Ludlum 3 / 44-3), microRem meters, and LSCs.

3-Sep-26

9 28-Aug-26 Under the Statement of Work, item 1.4 and 1.5, how has the disposal of Toulene being handled?

31-Aug-25 Liquid waste containing organic solvents such as toluene (including legacy scintillation cocktail fluids) must be characterized, packaged, transported, and disposed of as Mixed Waste (combined RCRA hazardous chemical and radioactive waste) in full compliance with applicable EPA, DOT, and NRC regulations. Contractors shall account for dual-permitted mixed waste treatment and disposal facilities in their technical approach and pricing.

3-Sep-26

10 28-Aug-26 Item 1.6 mentions NUREG-1556 Vol 7 - this is a NUREG- 1556 Vol 9. Which is governing document?

31-Aug-25 NUREG-1556 Vol 7 (Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Academic, Research and Development, and Other Licenses of Limited Scope) is the governing regulatory guidance document for License No. 46-06377-04. NUREG-1556 Vol 9 governs medical human-use licenses and does not apply to NOAA's non-human marine research operations.

3-Sep-26

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

11 28-Aug-26 Section 1.5.5 mentions 10CFR. Can we assume that the reference is to 10CFR20 which mentioned later in the SOW?

31-Aug-25 Yes, regulatory citations refer to 10 CFR Part 20 (Standards for Protection Against Radiation) and 10 CFR Part 30 (Rules of General Applicability to Domestic Licensing of Byproduct Material).

3-Sep-26

12 28-Aug-26 Is the radioactive/mixed waste inventory complete and final?

31-Aug-25 Yes, the waste inventory including the LSCs provided in the SOW is complete and final for proposal pricing.

3-Sep-26

13 28-Aug-26 Will disposal/transportation costs be firm-fixed-price or reimbursable/pass-through?

31-Aug-25 Transportation and disposal costs are Firm-Fixed-Price (FFP) 3-Sep-26

14 28-Aug-26 What happens contractually if unidentified waste or pre-existing contamination is discovered?

31-Aug-25 Discovery of unforeseen pre-existing contamination exceeding clearance limits or unidentified hazardous/mixed waste will be evaluated and processed via formal contract modification/change order procedures.

3-Sep-26

15 28-Aug-26 Can NOAA provide complete historical surveys, spill/decontamination records and the 2023 Room 413E survey package?

31-Aug-25 Yes, the complete 2023 Room 413E Final Status Survey package is provided, which incorporates historical usage, spill history, and prior survey evaluations. See Attachment 1 in Section 5 of the revised

SOW.

3-Sep-26

16 28-Aug-26 Can NOAA provide complete source/device inventories and source certificates for the LSCs, Gamma Counter, standards and Niton device?

31-Aug-25 Device models, serial numbers, and radionuclide data are provided: Niton S/N 6562 (Cd-109/Am-241), LSCs S/N 103840 & 422739 (Ba-133/Eu-152standards), and standard calibration sets. Original paper source certificates are unavailable due to equipment age. Technical specifications, device serial numbers, isotope identities, original assay dates, and mathematical decay calculations are provided in the SOW. Bidders shall perform required wipe/leak testing during mobilization to generate updated certificates prior to source removal and transport.

3-Sep-26

17 28-Aug-26 What specific NRC-approved release criteria/DCGLs are to be used for equipment and building surfaces?

31-Aug-25 The surface clearance criteria for equipment, fixtures, and permanent building surfaces is 6,000 dpm/100 cm2, based on ANSI/HPS N13.12-2013 Table 1 Group 2 screening levels (C-14 as the limiting radionuclide).

3-Sep-26

18 28-Aug-26 Is a MARSSIM-based Final Status Survey expected, and what survey classifications are anticipated?

31-Aug-25 Yes, survey planning follows MARSSIM (NUREG-1575) principles. Impacted laboratory spaces are designated as Class 3 survey units based on operating history and clean preliminary surveys.

3-Sep-26

19 28-Aug-26 What is the exact physical survey boundary and total square footage, including drains, ventilation, waste shed and ancillary areas?

31-Aug-25 Boundaries encompass:

Room 413E: Primary laboratory space (~ 373 SF), fume hood interior/plenum, and hot sink. This lab has completed the decommission survey. The report is provided as Attachment 1 in Section 5 of the revised

SOW.

Room 421E: Location of Tri-Carb LSC Model B1900 (S/N 103840) with loose lead pigs.

Room 307E: Location of Tri-Carb LSC Model 1600 TR (S/N 422739) with loose lead pigs and shields.

Waste Shed: Staging area for the 4 active waste drums.

3-Sep-26

20 28-Aug-26 Does the contractor's NRC support obligation continue through final license termination, including responses to NRC RAIs and confirmatory surveys?

31-Aug-25 Yes, the contractor shall support NOAA through final NRC review, including responding to technical inquiries or requests for additional information (RAIs) related to contractor deliverables.

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

21 28-Aug-26 Is February 28, 2027 the deadline for contractor deliverables or actual NRC approval of license termination?

31-Aug-25 February 28, 2027 represents the target contractual milestone for completion of contractor field work, final report submittals, and license termination application filings. The current license is good until 2039.

3-Sep-26

22 28-Aug-26 Who has final authority to accept each technical deliverable—the NOAA RSO, Contracting Officer, NRC, or combination thereof?

31-Aug-25 Contractual acceptance authority rests with the NOAA Contracting Officer (CO), based on technical review and concurrence by the NOAA Radiation Safety Officer (RSO) and subsequent regulatory approval by the NRC.

3-Sep-26

23 28-Aug-26 Is decontamination of pre-existing contamination included in the base scope?

31-Aug-25 Base scope includes minor, incidental surface decontamination of accessible fixtures or equipment.

Major uncontained pre-existing structural contamination is not anticipated.

3-Sep-26

24 28-Aug-26 If contamination exceeding anticipated levels is discovered, will additional remediation be handled as a change in scope?

31-Aug-25 Yes, remediation of significant unexpected contamination beyond scope baseline screening levels will be processed as an equitable adjustment / contract change order.

3-Sep-26

25 28-Aug-26 Should the contractor include a specific allowance for incidental decontamination?

31-Aug-25 Contractor pricing should incorporate standard incidental decontamination effort. 3-Sep-26

26 28-Aug-26 What constitutes contamination "resulting from Contractor activities" versus pre-existing contamination?

31-Aug-25 Pre-existing contamination refers to residual activity present prior to contractor mobilization.

Contractor-caused contamination refers to new contamination resulting from spills, cross-contamination, or improper containment during project execution.

3-Sep-26

27 28-Aug-26 We noticed in the SOW there is not a Historical Site Assessment (HSA) identified and that is typically the first part of our process for decomissioning, has there been one preformed or are we expected to complete one as part of the MARSSIM decomissioing process?

31-Aug-25 Historical operating data, radionuclide authorization history, and spill records are documented in the 413E Decommission Report in 2023. The contractor shall synthesize this historical data into the final decommissioning report.

3-Sep-26

28 28-Aug-26 Can we get a copy of the current license? 31-Aug-25 Yes. It's provided as a reference in Section 2.3 of the SOW. 3-Sep-26 29 28-Aug-26 Can we confirmation whether H-3, C-14, and I-125 are intended to be the complete remaining radionuclides of concern or are simply the isotopes associated with the waste currently identified.

31-Aug-25 Yes. 3-Sep-26

30 28-Aug-26 Is there better characterization of the existing waste drums, including physical/chemical form and whether there is any mixed waste?

31-Aug-25 Active waste consists of Drums 1A (I-125 solid/liquid, decayed), 2A (H-3 solid/liquid + LSC standards), 5A (I-125 solid/liquid, decayed), and 6A (H-3 solid/liquid). See RFI #9 response on Mixed Waste.

3-Sep-26

31 28-Aug-26 Can we get model/source information for the TriCarbs, gamma counter, Niton, and associated standards?

31-Aug-25 Room 421E LSC: PerkinElmer Packard Tri-Carb, Model B1900, S/N: 103840.

Room 307E LSC: PerkinElmer Packard Tri-Carb, Model 1600 TR, S/N: 422739.

Room 413E Microplate Counter: PerkinElmer Packard TopCount NXT, Model C9912V0, S/N: 429550.

Niton XRF: Model XLp Series, S/N: 6562 (Cd-109/Am-241).

3-Sep-26

32 28-Aug-26 Can we get The previous survey/release documentation, particularly the 2023 work for Room 413E.

31-Aug-25 Yes, the June 2023 Final Status Survey Report for Room 413E is provided as Attachment 1 in Section 5 of the revised SOW.

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

33 28-Aug-26 Can we get the amendment/release history for historical Montlake use areas that are no longer included in the SOW.

31-Aug-25 Yes. Historical amendment records for previously released areas are maintained on file by the NOAA

RSO

3-Sep-26

34 28-Aug-26 Can we get a few photos of the laboratories since we were unable to attend the site visit?

31-Aug-25 Additional photos are provided in Exhibit A of the revised SOW. 3-Sep-26

35 28-Aug-26 When was I-125 last used at the facility, and in which room or rooms was it last used?

31-Aug-25 I-125 was last received/used prior to 2019 in Room 413E. Due to its 59.5-day half-life, all residual I-125 has decayed to zero.

3-Sep-26

36 28-Aug-26 For each of the five 55-gallon drums, please provide the net waste volume, gross mass, and the date on which the listed activity was calculated.

31-Aug-25 Bidders shall assume the four primary waste drums (1A, 2A, 5A, 6A) are at least ¾ full. External contact radiation dose rates for all containers are at ambient background levels (< 0.1 mR/hr) due to the total decay of short-lived I-125 and the shielding of low-energy beta emitters (H-3, C-14) by the steel drum walls. One consolidated shipment is anticipated, and disposal costs are firm-fixed-price on a per-drum unit basis.

3-Sep-26

37 28-Aug-26 Is a facility floor plan available? Please provide it and identify the radioactive-material use/storage areas, including the square footage of Room 413E and the radioactive waste storage shed.

31-Aug-25 Relevant floor plans on 309E, 413E, and 421E are provided in Exhibit A of the revised SOW. There is no floor plan available the Shed. Photo 1 of Exhibit shows the entire footprint of the RadWaste Storage area (~ 5' x 15').

3-Sep-26

38 28-Aug-26 Please provide any available past radiological survey summaries and the expected current contamination levels in the use/storage areas.

31-Aug-25 Our monthly surveys are available for review. The results are mostly below background.

Comprehensive surveys from June 2023 for Lab 413E confirmed zero removable or fixed contamination above background (< LLD) on all room surfaces, fixtures, and equipment.

3-Sep-26

39 28-Aug-26 Were there any radioactive-material spills that were not fully remediated and left residual contamination?

31-Aug-25 No un-remediated spills or uncontained contamination events occurred in the facility. 3-Sep-26

40 28-Aug-26 Are there any locations where inaccessible radioactive contamination may be present? If so, please identify them.

31-Aug-25 No inaccessible radiological contamination is known or suspected. 3-Sep-26

41 28-Aug-26 Have all contents been removed from the use/storage areas other than the waste and equipment identified in the SOW?

31-Aug-25 Yes, all loose research consumables and non-waste reagents were cleared. There are some small containers of cleanup rages and PPE related radiation waste in 309E.

3-Sep-26

42 28-Aug-26 Are the two TriCarb liquid scintillation counters, gamma counter, and portable LBP Niton sensor operational? If a TriCarb is operational, may the contractor use it onsite to analyze wipe samples?

31-Aug-25 All listed instruments are operable but have not been used for years. They are slated for decommissioning/release. Bidders shall assume these units are non-operational and must supply their own calibrated survey meters and LSC equipment.

3-Sep-26

43 28-Aug-26 Please provide a copy of NRC License No. 46-06377-04, Amendment 45.

31-Aug-25 Yes. It's provided as a reference in Section 2.3 of the SOW. 3-Sep-26

44 28-Aug-26 Were any radionuclides with half-lives greater than 120 days, other than those identified in the SOW, ever used at the facility? If so, which radionuclides?

31-Aug-25 No dispersible radionuclides with half-lives > 120 days other than H-3 and C-14 were used under the license.

3-Sep-26

45 28-Aug-26 Was radioactive material ever disposed to the sewer? If so, please identify the room or rooms and discharge locations.

31-Aug-25 Yes, in 309E and 413E, down the sink in each lab. 3-Sep-26

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

46 28-Aug-26 We understand the urgency in the Administration’s need to award this project but we would respectfully request a brief 3-5 day extension to allow an opportunity to thoroughly review responses to questions and make any adjustments to pricing as a result of these responses.

31-Aug-25 Proposal due date modifications are issued formally by the Contracting Officer via solicitation amendments.

3-Sep-26

47 28-Aug-26 Please provide any dimensioned drawings, blueprints, or schematics which detail each room to be cleared and released.

31-Aug-25 Additional floor plans are provided in Exhibit A of the revised SOW. The 413E Decommission Report is provided as Attachment 1 in Section 5 of the revised SOW. CAD drawings are available and will be provided on an as-needed basis.

3-Sep-26

48 28-Aug-26 Please provide any drawings, prints, or schematics showing the location of utilities and isolation points for water, gases, and electrical.

31-Aug-25 Utility isolation points will be coordinated directly with NOAA facility engineering staff during site mobilization.

3-Sep-26

49 28-Aug-26 Please provide history on the use of radiological materials and any reports of spills which may have occurred.

31-Aug-25 There is no record of any historical spills since the current RSO took over the program in 2011. 3-Sep-26

50 28-Aug-26 Please provide any relevant maintenance history of the areas in question (e.g., cabinets or fixtures relocated, walls painted, floors recovered, etc).

31-Aug-25 Major casework, benches, and fume hoods remain in their original historical positions. 3-Sep-26

51 28-Aug-26 Do the existing floor coverings, wall coverings, paint, and cabinetry predate radiological activities?

31-Aug-25 Yes, structural finishes and laboratory casework predate or coincide with licensed operations. 3-Sep-26

52 28-Aug-26 What is the size of the 413E Laboratory? 31-Aug-25 About 373 SF 3-Sep-26 53 28-Aug-26 Please provide a summary of current radiological conditions in the impacted areas?

31-Aug-25 Current radiological conditions are clean based on the monthly surveys and 413E Decommission Report. 3-Sep-26

54 28-Aug-26 Please provide any legacy surveys or a summary for review? 31-Aug-25 The 413E Decommission Report finalized in 2023 is provided as Attachment 1 in the revised SOW. 3-Sep-26

55 28-Aug-26 Please provide any source leak test results. 31-Aug-25 Historical leak test certificates (e.g., Niton leak test on 05/23/2011) are on file. 3-Sep-26 56 28-Aug-26 Please provide any diagrams or schematics showing the configuration of the fume hood and exhaust ducting.

31-Aug-25 HVAC diagrams are provided as Photos 6 and 7 in Exhibit 1. 3-Sep-26

57 28-Aug-26 What is the intended post-release use for this laboratory? 31-Aug-25 Unrestricted non-radiological marine research. 3-Sep-26

58 28-Aug-26 Is this release being performed in support of demolition or is the intent to repurpose the laboratory spaces for non-radiological work and maintain the fixtures as intact as possible?

31-Aug-25 The goal is facility repurposing; laboratory fixtures and casework shall remain intact. 3-Sep-26

59 28-Aug-26 Are their logs the waste container contents and an estimation of radioactivity isotope and quantity packaged in each container?

31-Aug-25 Yes, waste drum packaging logs listing isotope activity, dates, and container numbers (1A, 2A, 5A, 6A) are provided.

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

60 28-Aug-26 Please provide a copy of waste handling procedures and logs of previous waste disposals.

31-Aug-25 Waste handling records are maintained under the NOAA Radiation Safety Program. These documents are available to the awarded contractor if needed.

3-Sep-26

61 28-Aug-26 Please provide any drawings or schematics detailing the configuration of sink and floor drains in the relevant spaces, specifically if there are any neutralization vessels or tanks present in the system prior to connection to the sewer?

31-Aug-25 This is only 1 sink in 309E. There are no neutralization vessels or tanks present in the system prior to connection to the sewere.

3-Sep-26

62 28-Aug-26 Can a summary of radioactive discharges to the sewer be provided?

31-Aug-25 Discharges were logged monthly; the final sink discharge occurred in July 2019 in compliance with 10 CFR 20 limits.

3-Sep-26

63 28-Aug-26 What type of scintillation cocktail(s) were used. Can SDS information be provided?

31-Aug-25 See 1.4.3 of the SOW for liquid scintillation vials containing Ecolume based scintillation cocktail. SDS is available via a simple google search on Ecolume.

3-Sep-26

64 28-Aug-26 Regarding the lead to be disposed, can an estimated quantity and configuration be provided?

31-Aug-25 The total estimated quantity of lead to be surveyed, cleared, or dispositioned by the contractor is 300 to 500 pounds, consisting of:

1) Loose Lead Pigs & Shielding: Approximately 200 pounds of standalone lead pig storage containers and brick/plate shielding requiring surface survey and release in accordance with NUREG-1556 Vol 7 / ANSI N13.12 criteria.

2) Internal Instrument Shielding: Approximately 100 to 300 pounds of internal structural lead shielding surrounding detector assemblies inside the two Tri-Carb LSCs, TopCount NXT, and Niton unit.

3-Sep-26

65 28-Aug-26 What was the last date a shipment I-125 was received? 31-Aug-25 05/21/2019. 3-Sep-26 66 28-Aug-26 Please provide a copy of the radioactive materials receipt log and any information on the distribution of the radioactive material.

31-Aug-25 Material receipt logs are maintained by the RSO and will be available to the awarded contractor. 3-Sep-26

67 28-Aug-26 Has a notice of intent to terminate the license been provided to the NRC?

31-Aug-25 No. 3-Sep-26

68 28-Aug-26 Are there any pre-established criteria with NRC regarding the rigor of surveys required or the limits which are to be employed?

31-Aug-25 Clearance criteria follow ANSI/HPS N13.12-2013 screening levels (6,000 dpm / 100 cm2) and MARSSIM Class 3 survey methodologies.

3-Sep-26

69 28-Aug-26 Is license oversight provided by NRC region 4 or another? 31-Aug-25 Regulatory oversight is provided by NRC Region IV (Arlington, TX) 3-Sep-26 70 28-Aug-26 Can you provide information on the isotopes and activities of any sealed sources located in equipment to be decommissioned?

31-Aug-25 Niton S/N 6562 (Cd-109 / Am-241);

Tri-Carb S/N 103840 (Ba-133 / Eu-152); and

Tri-Carb S/N 422739 (Ba-133 / Eu-152).

3-Sep-26

71 28-Aug-26 Is this facility government owned or leased? 31-Aug-25 The facility is a government-owned federal complex (NOAA NWFSC Montlake Laboratory) 3-Sep-26 72 28-Aug-26 Please provide the date the facility was constructed and a summary of the materials of construction.

31-Aug-25 1963 3-Sep-26

Client/SME Response Response Date

Requests For Information (RFIs) / Inquiries Project Title:

RFQ Number:

Montlake RAD Prog Decommision 1305M326Q0486

73 28-Aug-26 Please provide a copy of the facility radioactive materials license and/or a summary of the license detailing history, amendments, authorized materials (isotopes, quantities, forms), and any prior decommissioning activities. Is the license current?

31-Aug-25 2.3.5.and 3.1.1 on NRC License No. 46-06377-04 Amendment 45 is valid un l 9/30/2039. 3-Sep-26

74 28-Aug-26 Please provide a summary of the radiological operating history, including radiation safety staff, status, facility history, surveys, and types of instruments utilized for surveys.

31-Aug-25 Licensed research involved low-energy beta tracer protocols under named RSO Thanh Minh Trinh, P.E., with routine wipe testing confirming clean operations.

3-Sep-26

75 28-Aug-26 Please provide a summary of previous activities performed in support of decommissioning, including surveys, facility sweeps, waste packaging/disposal, chemical removal, etc.

31-Aug-25 Decommissioning activities to date include the June 2023 Room 413E, waste consolidation, and staging of 4 waste drums in the waste shed.