This is Appendix A from a federal contract document detailing a comprehensive list of pile locations requiring shimming and/or stubs at what appears to be a maritime or bridge structure. The appendix identifies 83 bent locations with multiple piles (designated A through G) at each location, categorizing defects and repair scope.
The document establishes scope parameters by classifying each pile condition as either "AMP" (in-scope) or "MC" (out of scope). In-scope items requiring shimming and/or stub work include nonbearing piles with partial bearing conditions, misaligned piles, and structural elements with limited section loss where bearing support must be restored. Out-of-scope items encompass piles with severe heart rot (typically 70-100% section loss), hollow sections, extensive tidal zone deterioration, completely missing piles, pile cap defects, and structural damage beyond shimming remediation. Specific defect types cataloged include nonbearing conditions with identified gaps (ranging from 1/4" to 6"), partial bearing percentages, heart rot with varying penetration depths, hollow sounding piles, splits and cracks, and stubs of various heights. The data indicates approximately 90 in-scope locations requiring corrective work and over 200 out-of-scope defects that fall outside the contract's shimming and stub installation requirements, establishing clear delineation between repair responsibilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| image_(9)_0002.png | PNG image | |
| Sol_1305M326Q0067_Amd_0002.pdf | ||
| Sol_1305M326Q0067_Amd_0001.pdf | ||
| 1305M326Q0067_SOW_A5_Storage_and_Laydown_Area_0001.jpg | JPG image | |
| 2026_04_30_-_Contractor_Site_Visit_Sign-In_Sheet_0001.pdf | ||
| Sol_1305M326Q0067.pdf | ||
| 1305M326Q0067_SOW_A2_2025_Manchester_Pier_Load_Rating_Analysis_Report.pdf | ||
| 1305M326Q0067_SOW_A1_2024_Manchester_Pier_Inspection_Report.pdf | ||
| 1305M326Q0067_SOW_A4_SAM_WD_Davis-Bacon_WA20260126.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
List of locations requiring shimming and/or stubs (all rows noted as “AMP” are IN-SCOPE. All rows noted as “MC” are OUT OF SCOPE)
Bent Pile Plumb / Battered
Defect Type
Note AMP or
MC?
2 Cap Other Pile cap is in contact with the ground for full length.
Bottom of pile cap has moisture and Pile D-G are buried.
MC
3 Cap
Other East Face: Intermittent checks, 1/2" wide x up to 50% depth.
3 E
Non-bearing
Partially bearing 50% due to misalignment.
AMP
3 D Hollow Interior pile sounds hollow, piles are sistered. Exterior pile is not bearing for 3".
MC
4 Cap Other East Face: Intermittent split, 1/2" wide x 1" deep. MC
6 G Other Shim present 2.25" high. MC
6 F Other Shim present 2.25" high. MC
6 Cap Other Pile cap is in contact with the ground for 75% of length.
Bottom of cap has moisture and Piles D-F are buried.
MC
7 Cap Other Pile cap is in contact with the ground for full length.
Bottom of pile cap has moisture and Pile D-G are buried.
MC
8 Cap Other Pile cap is in contact with the ground for 80% of length.
Bottom of pile cap has moisture and Piles D-F are buried.
MC
8 G Non-bearing
Not bearing for 3.5" to the west with heart rot present leaving only 1.5" outer shell intact.
AMP
9 D/Cap Other Pile D and bottom of pile cap is buried on the North end for 6'.
MC
9 G Non-bearing
Partially bearing for 1.5" with a 3/8" gap over west, approximately 50% of pile.
AMP
10 G Non-bearing
Square stub that is 100% not bearing with up to 1" gap.
No original pile just stub.
AMP
10 F Heart Rot Crack, up to 1" wide x full depth with heart rot visible, 2" shell remaining.
MC
11 D Non-bearing
Top of pile missing 5" wide x 1.25" deep section affecting bearing area.
AMP
11 G Heart Rot South face deteriorated. Non-bearing 2" with visible heart rot, 1" thick shell remains. 12" deep of heart rot minimum.
12 E Other Stub, 11" high with shim. AMP
12 Curb Base
Non-bearing
North curb base is 100% not bearing.
12 G
Split, 1" wide with 5" penetration, not bearing.
AMP
13 G Heart Rot 80% section loss at channel bottom. 50% non-bearing with a "sistered" timber plank.
MC
13 F Non-bearing
Partially bearing with 30% non-bearing, moderate rot, and
1.5" pick penetrations at channel bottom.
AMP
13 E
Partially bearing with 25% non-bearing.
AMP
14 F Heart Rot 95% section loss at channel bottom. MC
14 G Heart Rot 95% section loss at channel bottom. MC
15 G
Heart Rot
Jacketed 3' high above channel bottom with 7" annular space. Hollow sounding 1' high above jacket. Top 3" of jacket SIP steel form is damaged.
MC
15 D Other Wire rope connecting telephone pole to pile. MC
16 D Heart Rot 90% section loss at channel bottom. MC
16 G Heart Rot 40% section loss with 6" deep penetration. MC
17 G Plumb Heart Rot 3' above channel bottom: 40% section loss with 7" penetrations.
MC
17 E Heart Rot 90% section loss. MC
17 E-New
Non-bearing for 7", over 50% non-bearing
AMP
18 D Battered Non-bearing
Non-bearing for 3", approximately 25% non-bearing
AMP
18 E Hollow Sounds hollow, no visible rot. MC
18 G Plumb Splits Split, 1/2" wide x 2" deep x full height. MC
19 D-Org Plumb Non-bearing
Hollow at lower 4' with 1/2" gap between top of pile and pile cap, 100% non-bearing.
AMP
19 D Battered Non-bearing
Partially bearing, 2" or approximately 20% non-bearing, with 1" diameter x 3" deep hole, 1' above channel bottom.
19 E
Partially bearing, 2" or approximately 20% non-bearing.
AMP
19 F Other 2' above channel bottom: 1" diameter x 4" deep hole. MC
19 G Battered Hollow Sounds hollow, no visible rot. MC
20 D Plumb Heart Rot Estimated 30% section loss. 6' above channel bottom:
Split 1/2" wide with 9" penetration.
20 E
Partially bearing, 2" or approximately 20% non-bearing.
20 G Battered Heart Rot Estimated 50% section loss with 10" deep penetration at least 12" high.
MC
21 G Plumb Hollow Sounds hollow, no visible rot. MC
21 E
Heart Rot 80-90% section loss in tidal zone with 11" of penetration.
MC
21 D Battered Heart Rot 80+% section loss at low water line. MC
22 Cap Other Pile cap is saw cut and the end is deteriorating. MC
22 Curb Base
Other Below north curb base shim is also cut
MC
22 D Battered Hollow Sounds hollow, no visible rot. MC
22 E Heart Rot 90% section loss at least 6' high at LWL. MC
22 F
Partially bearing with 40% non-bearing with 1/2" gap.
AMP
22 G Battered Heart Rot 80% section loss due to heart rot with 10" deep penetrations.
23 F
Partially bearing, 2" or approximately 20% non-bearing.
AMP
23 D Battered Heart Rot Typical rotting. MC
23 D Plumb Heart Rot 10' above channel bottom: Approximately 70% section loss & pile is non-bearing.
MC
25 D Plumb Non-bearing
Partially bearing 50%.
AMP
26 F Heart Rot 60% section loss in tidal zone, 6' high minimum MC
26 G Battered Heart Rot 70% section loss in tidal zone. MC
27 D Battered Non-bearing
100% non-bearing with 6" gap.
AMP
27 F Heart Rot 50% section loss in tidal zone, 2' below high water line. MC
28 D Battered (Extra)
Hollow Hollow and cut in tidal zone.
MC
28 D Battered (Actual)
Hollow Multiple thru splits with 90%section loss and crushing at top of pile.
MC
29 G Battered Heart Rot 100% broken at low water line. 90% section loss with thru crack at hardware and pile non-bearing.
MC
29 E Other Stub, 18" high. AMP
29 F
Heart Rot 90% section loss at high water line with 12.5" penetration.
MC
30 D Battered Heart Rot 3.5' above channel bottom and 1' below low water line:
90% section loss.
MC
31 F Heart Rot At high water line: 70% section loss. MC
31 E Heart Rot 6' above channel bottom: 90% section loss, 2' H x 4" W.
At high water line: 50% section loss.
32 G Plumb Heart Rot At high water line: 90% section loss. MC
33 D Plumb Heart Rot 6' above channel bottom: 90% section loss, 1' H x 3" W MC
33 D Battered Non-bearing
100% non-bearing.
AMP
33 G Plumb Heart Rot At HWL: 40% section loss MC
34 G Battered Heart Rot 8' above channel bottom: 80% section loss, 8" H x 2" W with 10" of penetration.
MC
34 D Plumb Heart Rot 1" shell remains full height MC
34 D Battered Heart Rot At MWL: 80% section loss. MC
34 F Heart Rot At HWL: 30% section loss. MC
36 G Plumb Heart Rot 2' below HWL: 40% section loss. MC
36 F Heart Rot 2' below HWL: 30% section loss. MC
36 D Plumb Heart Rot 8' above channel bottom: 80-90% section loss with 11" of penetration.
MC
37 D Battered Non-bearing
100% non-bearing with 3" gap and exposed drift pin.
AMP
38 G Plumb Heart Rot At HWL: 90% section loss. MC
38 D Battered Non-bearing
100% non-bearing with 1/2" gap.
AMP
39 D Battered Non-bearing
100% non-bearing with 1" gap.
AMP
39 G Battered Non-bearing
100% non-bearing with 1" gap.
AMP
39 G Plumb Other Failed at MWL MC
39 E Heart Rot 10' above channel bottom: 30% section loss. MC
40 G Plumb Other Split with 20% section loss x 6' high at channel bottom at bottom of pile (as-built)
MC
40 E Heart Rot At MWL: 90% section loss x 3' high. MC
40 F (new)
Non-bearing
Partially bearing with 30% non-bearing.
AMP
41 F Heart Rot 75% section loss, 3' below pile cap & not bearing MC
42 D Plumb Other 4' stub extending from channel bottom MC
42 G Plumb Heart Rot 5' above channel bottom: 60% section loss, 6" W x 2' H MC
43 E Heart Rot 6' below pile cap: 70% section loss MC
43 G Plumb Heart Rot 5' below low water line: Hole, 2" H x 1" W x 6" D penetration, estimated 25% section loss.
MC
43 D Plumb Other 4' stub extending from channel bottom MC
44 D Plumb Heart Rot 50% section loss at low water line. MC
44 F Other Flaking off of outer shell, estimated 20% section loss at low water line.
44 E Splits Top of pile split, 15% loss of bearing cross section. MC
45 F
Stub is bearing 20% on pile due to rotting of stub.
45 E
Stub is bearing 20% on pile due to rotting of stub.
AMP
45 D Plumb Heart Rot 90% section loss at low water line. MC
45 D Battered Heart Rot 5' above channel bottom: 90% section loss. MC
46 F Heart Rot 5' above channel bottom: 90% section loss. MC
46 D Plumb Non-bearing
Not bearing on Stub and not bearing on pile
AMP
46 D Battered Non-bearing
Not bearing on Stub and not bearing on pile
AMP
47 E New Splits 1" cracking / splitting, full height. MC
47 E Original Heart Rot 100% section loss. MC
47 G Plumb Heart Rot 30% section loss MC
47 G Battered Splits Split / cracked from top of pile 4' long x 2" deep. MC
47 F
Non-bearing with a 0.5" gap.
AMP
47 D Battered Non-bearing
Non-bearing with a 0.5" gap.
AMP
47 D Plumb Heart Rot At low water line: 90% section loss. MC
48 G Plumb Heart Rot 5' below low water line: 90% section loss. MC
48 D Battered Non-bearing
Non-bearing.
AMP
48 G Plumb Non-bearing
Partially bearing 50% with 1/2" gap.
AMP
48 D Battered Non-bearing
Partially bearing with 75% non-bearing.
AMP
49 G Plumb Non-bearing
Partially bearing 50% with 1/2" gap
AMP
49 D Plumb Non-bearing
Partially bearing with 90% non-bearing with 1" gap
MC
49 D Plumb Heart Rot 7' below HWL: 95% section loss. MC
49 F
Partially bearing 50% with 1/2" gap
AMP
49 F Heart Rot 3" h x 1" w hole with 4" of penetration, estimated 30% section loss @ high water line.
MC
50 D Plumb Non-bearing
Partially bearing 50%.
AMP
50 E Heart Rot At high water line: 4" h x 1" w x 4" deep penetration estimated 30% section loss.
MC
50 F Heart Rot At high water line: 4" h x 1" w x 4" deep penetration estimated 30% section loss.
51 G Plumb Heart Rot 100% section loss. MC
51 G Plumb Non-
Partially bearing with 80% non-bearing due to 1/4" gap.
AMP
51 G Battered Non-bearing
Partially bearing with 80% non-bearing due to 1/4" gap.
AMP
51 D Battered Non-bearing
Partially bearing 50% due to 1/4" gap.
AMP
51 G Plumb Heart Rot 100% section loss. MC
52 E
Partially bearing with 75% non-bearing due to 1" gap.
AMP
52 G Battered Heart Rot 10' above channel bottom: 90% section loss. MC
53 E Heart Rot 2" h x 1" w hole with 3" of penetration estimated 25% section loss.
MC
53 G Battered Other Top 2' exhibits moderate crushing up to 20% loss of section due to crushing.
MC
Curb Base
Other North Side: Sill plate does not extend full length, partial shim at curb base.
MC
56 E Other Stub, 14" high. AMP
56 F Heart Rot 10' below HWL: 90% section loss with 2" deep shakes around 50% of perimeter.
MC
57 D Battered Heart Rot 8' above channel bottom: 90% section loss x 4' high. MC
58 D Plumb Heart Rot At LWL: 90% section loss. MC
58 F Interior sister
Non-bearing
Non-bearing 100% with 1" Gap.
AMP
58 G Plumb Non-bearing
Non-bearing with 1" gap.
AMP
58 G Battered Non-bearing
Non-bearing with 1" gap.
AMP
59 D Plumb Heart Rot 2' below high water line: 1/2" hole with 6+" of penetration with estimated 50% section loss.
MC
60 F Original Heart Rot 100% section loss. MC
61 G Plumb Other Crushing at top causing 10% section loss. MC
61 G Battered Other Crushing at top causing 10% section loss. MC
64 F Heart Rot Estimated 80% section loss, 8+" penetration MC
64 D Battered Heart Rot 90% section loss in tidal zone. MC
64 F Heart Rot 90% section loss with full height split and hollow. MC
65 G Plumb Heart Rot 90% section loss at high water line with thru split. MC
65 G Battered Splits Split, 1/4" wide. MC
67 D Plumb Heart Rot 90% section loss at low water line. MC
67 F Heart Rot 90% section loss in tidal zone. MC
68 G Plumb Heart Rot 100% section loss at low water line. MC
69 C Battered Heart Rot 90% section loss at high water line. MC
69 D Plumb Heart Rot 2" h x 1" w hole with 2" deep penetration with 15% section loss estimated. NOTE: 16" diameter pile.
MC
69 E Heart Rot 95% section loss. MC
69 F Heart Rot 90% section loss in tidal zone. MC
69 G Battered Non-bearing
Non-bearing 100% with 1" gap.
AMP
71 A Battered Heart Rot 5' below HWL: 90% section loss. MC
72 B Plumb Heart Rot 70% section loss in tidal zone with wide checks/splits. MC
72 E Heart Rot Estimated 30% section loss in tidal zone. MC
73 F Plumb Heart Rot 3' below HWL: 10.5" penetration with estimated 85% section loss.
MC
73 F Battered Non-bearing
Non-bearing with 3" gap.
AMP
73 C Heart Rot 80% section loss in tidal zone. MC
73 Pile Cap
Other 1.5" gap in pile cap.
MC
74 D Heart Rot At channel bottom: 90% section loss for 15' high.
Partially bearing with 60% non-bearing and 1/2" gap.
MC
74 C Other Stub, intact. MC
75 G Plumb Heart Rot 2" h x 1" w x 2" d penetration - estimated 15% section loss.
MC
75 A Plumb Heart Rot 90% section loss at top. MC
75 F Plumb Heart Rot At high water line: 10" deep penetration - estimated
80% section loss.
MC
75 A Plumb Non-bearing
Partially bearing 50%.
AMP
75 A Battered Non-bearing
Partially bearing 50%.
AMP
75 E Original Heart Rot Original pile 100% section loss, failed, and disconnected.
MC
76 E Heart Rot Estimated 75% section loss at high water line. MC
76 D Heart Rot 2' below high water line: Estimated 50% section loss. MC
76 C
Partially bearing with 40% non-bearing.
AMP
76 F Plumb Heart Rot 3' below high water line: 1/4" wide crack with estimated 50% section loss.
MC
77 A Battered Heart Rot Near low water line: 90% section loss in tidal zone. MC
77 G Battered Other Disconnected and loose, terminates 3' below high water line.
MC
77 G Plumb Heart Rot 90+% section loss and failed. NOTE: Sister pile installed by cutting battered pile.
MC
78 A Battered Non-bearing
Non-bearing 100% with 1" gap
MC
78 Curb Base
Other South curb base shim is not bearing 90%
78 G Plumb Heart Rot At high water line: 90% section loss. MC
79 G Plumb Heart Rot At high water line: 20% section loss. MC
79 C Other Stub. MC
79 E Other Stub. MC
79 B Plumb Non-bearing
Non-bearing 100% with 1" gap.
AMP
79 G Plumb Heart Rot Estimated 60% section loss at top. MC
79 G Plumb Heart Rot Bottom 12': 90% section loss with 1/2" shell remains. MC
80 D
Partially bearing with 40% non-bearing and 1/2" gap.
AMP
81 Curb base
Other South curb base shim failed.
MC
81 D Heart Rot 5' below HWL: 90% section loss at split, 5' long. MC
Stringe rs Other
Stringers 1, 3, 5, 25, 27, and 29 from north have exposed drift pin/bolt, 1.5" max.
MC
82 B Plumb Non-bearing
100% non-bearing with 1/2" gap, sways in current with no drift pin or hole visible on cap underside.
AMP
82 B Battered Non-bearing
100% non-bearing with 1/2" gap, sways in current with no drift pin or hole visible on cap underside.
AMP
82 C Splits Split, 1/2" wide x minimum 6" deep split, does not appear hollow.
MC
82 D Non-bearing
Stub with multiple 1/2" gaps, partially bearing approximately
50%.
82 E
Stub with 1/2" gap, non-bearing 100%.
AMP
82 E Other Pipe Attachment. MC
82 F Plumb Non-bearing
Partially bearing with 80% non-bearing and 1/2" gap.
AMP
82 G Battered Heart Rot 15% heart rot. MC
82 G Battered Non-bearing
100% non-bearing, with 1/2" gap with partial perimeter shake.
MC
82 G Plumb Non-bearing
Partially bearing with 60% non-bearing and 1/2" gap.
AMP
82 Curb Base
Other South curb base shim failed.
MC
83 Cap Other 137" (72"+65") Overhang at the south end of cap to face of battered pile.
MC
Curb Base
Other North curb base at Bent 83: 50" l x 6" h x 2" deep failure/split with splitting 2.5" deep at thru bolt.
MC
83 A Plumb Non-bearing
100% non-bearing.
83 A Battered Other 12" h x 3" w x 4.5" d void. MC
83 A-B Heart Rot 2" shell remains, estimated 70% section loss. MC
83 B Plumb Non-bearing
100% non-bearing with 2" gap, sways in current with no drift pin or hole visible on cap underside.
AMP
83 B Battered Non-bearing
100% non-bearing with 2" gap, sways in current with no drift pin or hole visible on cap underside.
AMP
83 C Splits Thru split, 1/4" wide. MC
83 D
100% non-bearing exposing 20% heart rot.
83 F
Partially bearing 50% with 1/4" gaps.
AMP
83 G Battered Other Missing. MC
83 G Plumb Other Missing. MC