SOW Appendix 2 - Milford floor plans.pdf
PDF 3 MB Posted
- Attached to
- Fire Alarm System Upgrade/Replacement Federal contract opportunity
- Solicitation number
- 1305M325Q0090
About this file
These floor plans depict multiple buildings (Buildings #1, #2, and #10) with ground, first, second floors, and an attic, primarily containing laboratories, offices, storage spaces, mechanical rooms, and safety equipment. Each floor plan includes standard safety features like fire extinguishers (marked "F"), pull boxes ("P"), emergency lights ("EL"), first aid stations ("FA"), and automated external defibrillators ("AED"). Building #1 has three floors with numerous numbered laboratories (e.g., Lab 18, Lab 16) and associated offices, a seawater lab section on the ground floor with fish culture rooms and hatches, and a library/conference room on the second floor. Building #2 has similar laboratory and office configurations across its floors, with additional spaces like a dark room and mechanical areas. Building #10 has a simpler layout focusing on offices, storage, kitchen, and lavatory spaces across two floors. The floor plans provide detailed room-by-room layouts with multiple exit points and emergency safety provisions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1305M325Q0090_Amd_0003.pdf | ||
| SOW Appendix 1 - Fire Alarm Inspection Report.pdf | ||
| 1305M325Q0090 Questions and Answers.pdf | ||
| Sol_1305M325Q0090_Amd_0002.pdf | ||
| Sol_1305M325Q0090_Amd_0001.pdf | ||
| Attachment 2 POTTER Brand Technical Specifications.pdf | ||
| Sol_1305M325Q0090.pdf | ||
| Attachment 1 Statement of Work - Milford Fire Alarm System Upgrades.pdf | ||
| Attachment 3 SCA Wage Determination 2025-4113 Rev 32 dated 08July2025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .