About this file

This document is a Fire Alarm Annual Inspection Report for the Northeast Fisheries Science Center Milford CT Lab, conducted by Johnson Controls on January 10, 2023. The comprehensive inspection revealed several device deficiencies across multiple building zones, including broken pull station covers, a non-functioning remote key switch, and a fire alarm panel battery that failed both visual inspection and load testing due to its expiration date of 08/2016. Out of 176 total devices inspected, 170 passed, 5 failed, and 1 could not be inspected (a heat detector in the elevator mechanical room).

The key deficiencies included a pull station in the attic with broken hinges, a remote key switch by the roof-top access that was not working and corroded, a garage pull station with a broken cover held by a tie wrap, a rear shop pull station with a broken cover, and a fire alarm panel battery in the telephone room that failed load testing and had an outdated manufacture date. The inspection was performed by Chester Zebrowski from Johnson Controls, with the facility contact being Dom Capomolla, Facilities Engineer at the Northeast Fisheries Science Center. The report includes detailed images documenting each deficient device and its specific failure reason.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUSTOMER NAME: Northeast Fisheries Science Center Milford CT Lab BUILDING NAME: Northeast Fisheries Science Center Milford CT Lab BUILDING ADDRESS: 212 Rogers Ave, Milford, CT 06460 CONTACT NAME: Dom Capomolla CONTACT E-MAIL: domenick.capomolla@noaa.gov CONTACT ROLE: Facilities Engineer

CONTACT PHONE: 2036270994

INSPECTION TYPE: Fire Alarm v2 FREQUENCY: Annual

WORK ORDER: 53643484

INSPECTION START DATE: 01/10/2023

INSPECTION END DATE: 01/10/2023

INSPECTOR: Chester Zebrowski

INSPECTOR LICENSE: CT ELC 0189852-L6

ACCOUNT NAME: Johnson Controls North America OFFICE ADDRESS: 27 Inwood Road Rocky Hill, CT 06067

OFFICE PHONE: 860-602-3200

OFFICE LICENSE: CT FRP-0040801-F1 / CT ELC 018746-E1 / MA SC-00786 / MA 17359A

TIMEZONE: GMT-05:00

FIRE ALARM INSPECTION REPORT

Building Notes

1. 01/10/2023-All devices inspected and tested. Deficiencies are noted in this report.

DEVICE DEFICIENCIES

LOCATION DESCRIPTION ADDRESS DEVICE MAKE MODEL BARCODE DATE OF TEST TYPE IMAGES

Attic (Building #02) Attic Zone 06 Pull Station — — — 01/10/2023 VISUAL FAILURE

DEFICIENCY

IMAGES APPENDIX

1.1

FAILURE REASON: Cover hinges broken

Penthouse (Building #01) By roof- top access Zone 04 Remote Key Switch — — — 01/10/2023

FUNCTIONAL

FAILURE,VISUAL

FAILURE

DEFICIENCY

IMAGES APPENDIX

1.2

FAILURE REASON: Switch not working and is corroded.

Basement (Building #01) Garage Zone 01 Pull Station — — — 01/10/2023 VISUAL FAILURE

DEFICIENCY

IMAGES APPENDIX

1.3

FAILURE REASON: Broken cover. Being held by tie wrap

Floor 01 (Building #03) Rear shop Zone 08 Pull Station — — — 01/10/2023 VISUAL FAILURE

DEFICIENCY

IMAGES APPENDIX

1.4

FAILURE REASON: Broken cover

Basement (Building #01)

Telephone Rm FACP Panel Battery — Battery — — — 01/10/2023

FUNCTIONAL

FAILURE,VISUAL

FAILURE

DEFICIENCY

IMAGES APPENDIX

1.5

FAILURE REASON: Failed load test and expiration date code of 08/2016.

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Address: 212 Rogers Ave, Milford, CT 06460

Fire Alarm v2 | 01/10/2023 Page 1 of 15

INSPECTION RESULTS SUMMARY

DEVICE TYPE INVENTORY COUNT PASSED FAILED CANNOT INSPECT

Annunciator 1 1 0 0

Battery 1 0 1 0

Duct Detector 3 3 0 0

Heat Detector 82 81 0 1

Panel 1 1 0 0

Pull Station 21 18 3 0

Remote Key Switch 3 2 1 0

Smoke Detector 22 22 0 0

Audible Visible Device 32 32 0 0

Visible Notification Device 10 10 0 0

TOTAL 176 170 5 1

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 2 of 15

Panels/Initiating Devices

DEVICE TYPE INVENTORY COUNT PASSED FAILED CANNOT INSPECT

Annunciator 1 1 0 0

Battery 1 0 1 0

Duct Detector 3 3 0 0

Heat Detector 82 81 0 1

Panel 1 1 0 0

Pull Station 21 18 3 0

Remote Key Switch 3 2 1 0

Smoke Detector 22 22 0 0

FACP PANELS

# LOCATION DESCRIPTION MANUFACTURER MODEL DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Basement (Building #01)

Fire panel room across from elevator Simplex 4100ES Panel — Chester John

Zebrowski 01/10/2023 Passed

Is the panel in a normal condition at the start of the inspection? Yes

Alarm, Supervisory, and Trouble Signals (Inputs) Yes

Circuit Supervisory (Including Opens, Shorts & Ground Faults) Yes

POWER SUPPLY SUPV - LOSS OF AC POWER/BATTS Yes

Fuses/Lamps/LED Tested & Verified Yes

INTERFACE EQUIP VERIFICATION OF REQUIRED SIGNALS Yes

MAIN POWER SUPPLY TESTED UNDER FULL LOAD Yes

REMOTE ANNUNCIATOR(S) - OPERATION/VERIFICATION Yes

INITIATING DEVICES TEST Yes

ELEVATOR RECALL FUNCTION & SHUNT TRIP OPERATION Yes

HVAC SHUT DOWN Yes

MASTERBOX / CENTRAL STATION CONNECTION TESTED Yes

MASTERBOX / CENTRAL STATION ACCOUNT # FACP-Simplex 4100 U

Acct # 107-3150 Monitored by: JCI

ALARM NOTIFICATION APPLIANCES TESTED Yes

MULTIPLEX COMMUNICATIONS TESTED Yes

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 3 of 15

BATTERIES

# LOCATION DESCRIPTION DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Basement (Building #01)

Telephone Rm FACP Panel Battery Battery — Chester John Zebrowski 01/10/2023 Failed

Quantity (Enter 2 if answering for a set) 2

Amp hour rating 33 AH

Visual inspection Fail

* Date code expiration fail

Batteries less than 5 years? Fail

Manufacturer Date Code 08/2016

Voltage with charger 26.5

Voltage without charger 25.0

Load Voltage Test Fail

Load Voltage Test Results (%) <40

Reason for failure: (Functional Failure,Visual Failure) Failed load test and expiration date code of 08/2016.

SMOKE DETECTORS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Floor 02 (Building #01) Elevator lobby Zone 03 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

2 Floor 01 (Building #01) Elevator lobby Zone 02 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

3 Floor 02 (Building #01)

Elevator lobby (Recall) M1-7 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

4 Floor 01 (Building #01)

Elevator lobby (Recall) M1-8 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

5 Basement (Building #01)

Elevator lobby (Recall) M1-9 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

6 Basement (Building #01) Elevator mech rm Zone 01 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

7 Basement (Building #01) Hall by elevator Zone 01 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

8 Floor 01 (Building #02)

Hall by main entrance Zone 05 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

9 Floor 02 (Building #01) Hall by rear stair Zone 03 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

10 Floor 01 (Building #02) Hall by rm 1 Zone 05 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

11 Floor 01 (Building #02) Hall by rm 5 Zone 05 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

12 Floor 01 (Building #01) Hall by rm 10 Zone 02 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

13 Floor 02 (Building #02) Hall by rm 15 Zone 06 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

14 Floor 02 (Building #02) Hall by rm 17 Zone 06 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

15 Floor 01 (Building #01) Hall by rm 19 Zone 02 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

16 Floor 02 (Building #01) Hall by rm 20 Zone 03 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

17 Floor 01 (Building #10) Kitchen Zone 09 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 4 of 15

SMOKE DETECTORS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

18 Floor 02 (Building #01) Rm 32 Zone 03 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

19 Basement (Building #01)

Telephone Rm (FACP room) Zone 01 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

20 Floor 02 (Building #01) Top of main stair Zone 03 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

21 Penthouse (Building #01) Top of stair Zone 04 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

22 Floor 02 (Building #10) Top of stair Zone 09 Smoke Detector — Chester John

Zebrowski 01/10/2023 Passed

HEAT DETECTORS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Attic (Building #02) Attic (center high) Zone 06 Heat Detector — Chester John Zebrowski 01/10/2023 Passed

Notes:

•Zone tested due to height

2 Attic (Building #02) Attic (left) Zone 06 Heat Detector — Chester John Zebrowski 01/10/2023 Passed

3 Attic (Building #02) Attic (right) Zone 06 Heat Detector — Chester John Zebrowski 01/10/2023 Passed

4 Floor 02 (Building #03)

Attic storage (Center) Zone 08 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

5 Floor 02 (Building #03) Attic storage (left) Zone 08 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

6 Floor 02 (Building #03) Attic storage (Right) Zone 08 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

7 Basement (Building #01) Boiler rm Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

8 Basement (Building #01) Boiler rm Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

9 Penthouse (Building #01) By water tanks Zone 04 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

10 Basement (Building #01) Elevator mech rm Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Cannot Inspect

Reason cannot inspect: Elevator technician needed for this inspection

11 Basement (Building #01)

Fish culture hatchery room (left) Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

12 Basement (Building #01)

Fish culture hatchery room

(right) Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

13 Floor 01 (Building #03) Front Shop Zone 08 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

14 Floor 01 (Building #02)

Furnace rm by main entrance Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

15 Basement (Building #01) Garage Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

16 Basement (Building #01) Garage Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

17 Basement (Building #01) Garage Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 5 of 15

HEAT DETECTORS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

18 Basement (Building #01)

Janitors closet by restroom Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

19 Floor 01 (Building #01)

Janitors closet by rm 19 (Button Heat) Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

20 Floor 02 (Building #01)

Janitors closet in elevator lobby Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

21 Basement (Building #01)

Main electrical rm (off of boiler rm) Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

22 Basement (Building #01) Main fish culture rm Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

23 Basement (Building #01) Main fish culture rm Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

24 Basement (Building #01)

Mechanical rm 1 (off of boiler rm) Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

25 Basement (Building #01)

Mechanical rm by elevator lobby Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

26 Floor 01 (Building #03) Pump room Zone 08 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

27 Floor 01 (Building #03) Rear shop Zone 08 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

28 Basement (Building #01) Receiving office Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

29 Floor 01 (Building #02)

Restroom by main entrance (sprinkler

rm) Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

30 Floor 01 (Building #02) Rm 1 Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

31 Floor 01 (Building #02) Rm 1 left office Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

32 Floor 01 (Building #02) Rm 1 right office Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

33 Floor 01 (Building #02) Rm 5 Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

34 Floor 01 (Building #02) Rm 6 Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

35 Floor 01 (Building #01) Rm 10 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

36 Floor 01 (Building #01) Rm 10 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

37 Floor 01 (Building #01) Rm 11 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

38 Floor 01 (Building #01) Rm 11 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

39 Floor 01 (Building #01) Rm 12 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

40 Floor 01 (Building #01) Rm 12 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

41 Floor 01 (Building #01) Rm 13 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

42 Floor 01 (Building #01) Rm 13 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

43 Floor 01 (Building #01) Rm 14 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 6 of 15

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

44 Floor 01 (Building #01) Rm 14 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

45 Floor 01 (Building #01) Rm 15 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

46 Floor 01 (Building #01) Rm 15 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

47 Floor 01 (Building #01) Rm 16 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

48 Floor 01 (Building #01) Rm 17 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

49 Floor 01 (Building #01) Rm 17 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

50 Floor 01 (Building #01) Rm 18 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

51 Floor 01 (Building #01) Rm 18 office Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

52 Floor 01 (Building #01) Rm 19 Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

53 Floor 01 (Building #01) Rm 19 office Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

54 Floor 02 (Building #01) Rm 20 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

55 Floor 02 (Building #01) Rm 20 boiler rm Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

56 Floor 02 (Building #01) Rm 21 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

57 Floor 02 (Building #01) Rm 21 office Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

58 Floor 02 (Building #01) Rm 22 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

59 Floor 02 (Building #01) Rm 22 office Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

60 Floor 02 (Building #01) Rm 23 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

61 Floor 02 (Building #01) Rm 23 office Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

62 Floor 02 (Building #01) Rm 24 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

63 Floor 02 (Building #01) Rm 24 A Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

64 Floor 02 (Building #01) Rm 24 B Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

65 Floor 02 (Building #01) Rm 24 elec closet Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

66 Floor 02 (Building #01) Rm 25 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

67 Floor 02 (Building #01) Rm 25 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

68 Floor 02 (Building #01) Rm 26 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

69 Floor 02 (Building #01) Rm 26 - office Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 7 of 15

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

70 Floor 02 (Building #01) Rm 28 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

71 Floor 02 (Building #01) Rm 29 Zone 03 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

72 Floor 02 (Building #02) Room 11 Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

73 Floor 02 (Building #02) Room 13 Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

74 Floor 02 (Building #02)

Room 14 Women’s room Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

75 Floor 02 (Building #02) Room 15 Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

76 Floor 02 (Building #02)

Room 16 Men’s room Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

77 Floor 02 (Building #02) Room 17 Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

78 Floor 02 (Building #02) Room 18 Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

79 Floor 02 (Building #02) Room 20 Zone 06 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

80 Floor 01 (Building #01)

Storage closet by rm 19 (Button Heat) Zone 02 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

81 Floor 01 (Building #02)

Storage rm by main entrance Zone 05 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

82 Basement (Building #01)

Storage / sinks rm by receiving office Zone 01 Heat Detector — Chester John

Zebrowski 01/10/2023 Passed

DUCT DETECTORS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Penthouse (Building #01) By roof- top access Zone 04 Duct Detector — Chester John

Zebrowski 01/10/2023 Passed

2 Floor 02 (Building #01) Elevator lobby Zone 03 Duct Detector — Chester John

Zebrowski 01/10/2023 Passed

3 Basement (Building #01)

Mechanical rm 1 (off of boiler rm) Zone 01 Duct Detector — Chester John

Zebrowski 01/10/2023 Passed

PULL STATIONS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Attic (Building #02) Attic Zone 06 Pull Station — Chester John Zebrowski 01/10/2023 Failed

Reason for failure: (Visual Failure) Cover hinges broken

2 Basement (Building #01) Boiler rm exit Zone 01 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

3 Floor 02 (Building #02) By Stair Zone 06 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

4 Penthouse (Building #01) By water tanks Zone 04 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

5 Floor 01 (Building #01) Elevator lobby Zone 02 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

6 Floor 01 (Building #02) Front entrance Zone 05 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 8 of 15

PULL STATIONS

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

7 Floor 01 (Building #03) Front shop Zone 08 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

8 Basement (Building #01) Garage Zone 01 Pull Station — Chester John

Zebrowski 01/10/2023 Failed

Reason for failure: (Visual Failure) Broken cover. Being held by tie wrap

9 Basement (Building #01)

Gas cyclinder storage rm Zone 02 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

10 Basement (Building #01) Hall by elevator Zone 01 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

11 Floor 02 (Building #01) Hall by elevator Zone 03 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

12 Floor 02 (Building #01) Hall by rear stair Zone 03 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

13 Floor 01 (Building #01) Hall by rm 19 Zone 02 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

14 Floor 01 (Building #10) Main entrance Zone 09 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

15 Floor 01 (Building #01) Main entrance Zone 02 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

16 Floor 01 (Building #03)

Pump house entrance Zone 08 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

17 Floor 01 (Building #10) Rear door by patio Zone 09 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

18 Floor 01 (Building #02) Rear entrance Zone 05 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

19 Floor 01 (Building #03) Rear shop Zone 08 Pull Station — Chester John

Zebrowski 01/10/2023 Failed

Reason for failure: (Visual Failure) Broken cover

20 Basement (Building #01) Receiving area Zone 01 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

21 Floor 01 (Building #10)

Side exit by Bsmt hatch Zone 09 Pull Station — Chester John

Zebrowski 01/10/2023 Passed

MISCELLANEOUS ALARM & SUPERVISORY DEVICES

# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Penthouse (Building #01) By roof- top access Zone 04 Remote Key Switch — Chester John

Zebrowski 01/10/2023 Failed

Reason for failure: (Functional Failure,Visual Failure) Switch not working and is corroded.

2 Floor 02 (Building #01) Elevator lobby Zone 03 Remote Key Switch — Chester John

Zebrowski 01/10/2023 Passed

3 Basement (Building #01)

Mechanical rm 1 (off of boiler rm) Zone 01 Remote Key Switch — Chester John

Zebrowski 01/10/2023 Passed

ANCILLARY FIRE ALARM DEVICES

# LOCATION DESCRIPTION DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Floor 01 (Building #01) Main entrance Annunciator — Chester John Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 9 of 15

Notification Devices

DEVICE TYPE INVENTORY COUNT PASSED FAILED CANNOT INSPECT

Audible Visible Device 32 32 0 0

Visible Notification Device 10 10 0 0

AUDIBLE VISIBLE DEVICES W/DB

# LOCATION DESCRIPTION DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Floor 02 (Building #03) Attic storage Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

2 Floor 02 (Building #03) Attic storage (left) Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

3 Basement (Building #01) Boiler rm Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

4 Attic (Building #02) By stairs Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

5 Penthouse (Building #01) By water tanks Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

6 Basement (Building #01)

Fish culture hall by hatchery 2 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

7 Basement (Building #01) Fish culture rm Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

8 Floor 01 (Building #02) Front entrance Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

9 Basement (Building #01) Garage Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

10 Basement (Building #01)

Gas cyclinder storage rm Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

11 Floor 02 (Building #01) Hall by elevator Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

12 Basement (Building #01) Hall by hatchery 1 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

13 Floor 02 (Building #01) Hall by rear stair Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

14 Floor 02 (Building #02) Hall by rm 15 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

15 Floor 01 (Building #01) Hall by rm 19 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

16 Floor 02 (Building #01) Hall by rm 20 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

17 Attic (Building #02) Left wall by fish tanks Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

18 Floor 01 (Building #10) Living rm / office Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

19 Basement (Building #01) Mechanical rm Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

20 Out (Building #11) Outside Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

21 Penthouse (Building #01)

Outside thru roof top access Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

22 Basement (Building #01) Receiving area Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

23 Floor 01 (Building #01) Rm 16 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

24 Floor 02 (Building #01) Rm 18 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

25 Floor 02 (Building #01) Rm 24 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

26 Floor 02 (Building #01) Rm 25 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

27 Floor 02 (Building #01) Rm 26 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 10 of 15

Notification Devices

AUDIBLE VISIBLE DEVICES W/DB

# LOCATION DESCRIPTION DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

28 Floor 02 (Building #01) Rm 28 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

29 Floor 02 (Building #01) Rm 29 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

30 Floor 02 (Building #01) Rm 31 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

31 Floor 02 (Building #01) Rm 32 Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

32 Floor 02 (Building #10) Top of stair Audible Visible Device — Chester John Zebrowski 01/10/2023 Passed

DEVICES

# LOCATION DESCRIPTION DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 Basement (Building #01) Mens bathroom Visible Notification

Device — Chester John Zebrowski 01/10/2023 Passed

2 Floor 02 (Building #01) Mens bathroom Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

3 Floor 01 (Building #02) Mens restroom by main entrance

Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

4 Floor 02 (Building #01) Rm 20 Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

5 Floor 02 (Building #01) Rm 21 Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

6 Floor 02 (Building #01) Rm 22 Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

7 Floor 02 (Building #01) Rm 23 Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

8 Floor 02 (Building #02) Room 14 Womensroom Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

9 Floor 02 (Building #02) Room 16 Mensroom Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

10 Floor 02 (Building #01) Womens bathroom Visible Notification Device — Chester John Zebrowski 01/10/2023 Passed

Inspector Signature

Inspector Name Chester Zebrowski Date 01/10/2023

Signature of the

Inspector

Printed name of the Inspector Riley Arthur Date 01/10/2023

Signature of the

Facilities Manager

Printed name of the Facilities Manager Dom Capomolla Date 01/10/2023

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 11 of 15

Terms And Conditions

1. Limitation of Liability; Limitations Of Remedy. It is understood and agreed by the Customer that Company is not an insurer and that insurance coverage, if any, shall be obtained by the Customer and that amounts payable to Company hereunder are based upon the value of the services and the scope of liability set forth in this agreement and are unrelated to the value of the Customer's property and the property of others located on the premises. Customer agrees to look exclusively to the Customer's insurer to recover for injuries or damage in the event of any loss or injury and that Customer releases and waives all right of recovery against Company arising by way of subrogation. Company makes no guaranty or Warranty, including any implied warranty of merchantability or fitness for a particular purpose that equipment or services supplied by Company will detect or avert occurrences or the consequences there from that the equipment or service was designed to detect or avert.<br />It is impractical and extremely difficult to fix the actual damages, if any, which may proximately result from failure on the part of Company to perform any of its obligations under this agreement. Accordingly, Customer agrees that, Company shall be exempt from liability for any loss, damage or injury arising directly or indirectly from occurrences, or the consequences therefrom, which the equipment or service was designed to detect or avert. Should Company be found liable for any loss, damage or injury arising from a failure of the equipment or service in any respect, Company's liability shall be limited to an amount equal to the agreement price (as increased by the price for any additional work) or where the time and material payment term is selected, Customer's time and material payments to Company. Where this agreement covers multiple sites, liability shall be limited to the amount of the payments allocable to the site where the incident occurred. Such sum shall be complete and exclusive. If Customer desires Company to assume greater liability, the parties shall amend this agreement by attaching a rider setting forth the amount of additional liability and the additional amount payable by the Customer for the assumption by Company of such greater liability, provided however that such rider shall in no way be interpreted to hold Company as an insurer. IN NO EVENT SHALL COMPANY BE LIABLE FOR ANY DAMAGE, LOSS, INJURY, OR ANY OTHER CLAIM ARISING FROM ANY SERVICING, ALTERATIONS, MODIFICATIONS, CHANGES, OR MOVEMENTS OF THE COVERED SYSTEM(S) OR ANY OF ITS COMPONENT PARTS BY THE CUSTOMER OR ANY THIRD PARTY. COMPANY SHALL NOT BE LIABLE FOR INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY KIND, INCLUDING BUT NOT LIMITED TO DAMAGES ARISING FROM THE USE, LOSS OF THE USE, PERFORMANCE, OR FAILURE OF THE COVERED SYSTEM(S) TO PERFORM. The limitations of liability set forth in this agreement shall inure to the benefit of all parents, subsidiaries and affiliates of Company, whether direct or indirect, Company's employees, agents, officers and directors.

2. Limited Warranty. COMPANY WARRANTS THAT ITS WORKMANSHIP AND MATERIAL FURNISHED UNDER THIS AGREEMENT WILL BE FREE FROM DEFECTS FOR A PERIOD OF NINETY

(90) DAYS FROM THE DATE OF FURNISHING. Where Company provides product or equipment of others, Company will warrant the product or equipment only to the extent warranted by such third party. EXCEPT AS EXPRESSLY SET FORTH HEREIN, COMPANY DISCLAIMS ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE SERVICES PERFORMED OR THE PRODUCTS, SYSTEMS OR EQUIPMENT, IF ANY, SUPPORTED HEREUNDER. COMPANY MAKES NO WARRANTY OR REPRESENTATION, AND UNDERTAKES NO OBLIGATION TO ENSURE BY THE SERVICES PERFORMED UNDER THIS AGREEMENT, THAT COMPANY'S PRODUCTS OR THE SYSTEMS OR EQUIPMENT OF THE CUSTOMER WILL CORRECTLY HANDLE THE PROCESSING OF CALENDAR DATES BEFORE OR

AFTER DECEMBER 31, 1999.

3. Indemnity. Customer agrees to indemnify, hold harmless and defend Company against any and all losses, damages, costs, including expert fees and costs, and expenses including reasonable defense costs, arising from any and all third party claims for personal injury, death, property damage or economic loss, including specifically any damages resulting from the exposure of workers to Hazardous Conditions whether or not Customer pre-notifies Company of the existence of said hazardous conditions, arising in any way from any act or omission of Customer or Company relating in any way to this agreement, including but not limited to the Services under this agreement, whether such claims are based upon contract, warranty, tort (including but not limited to active or passive negligence), strict liability or otherwise. Company reserves the right to select counsel to represent it in any such action.

4. Hazardous Materials. Customer represents that, except to the extent that Company has been given written notice of the following hazards prior to the execution of this agreement, to the best of Customer's knowledge there is no:

a. "permit confined space," as defined by OSHA, or space in which work must be performed that, because of its construction, location, contents or work activity therein, accumulation of a hazardous gas, vapour, dust or fume or the creation of a risk of infectious disease

b. need for air monitoring, respiratory protection, or other medical risk

c. asbestos, asbestos-containing material, formaldehyde or other potentially toxic or otherwise hazardous material contained in or on the surface of the floors, walls, ceilings, insulation or other structural components of the area of any building

d. All of the above are hereinafter referred to as "Hazardous Conditions". Company shall have the right to rely on the representations listed above. If hazardous conditions are encountered by Company during the course of Company's work, the discovery of such conditions shall constitute an event beyond Company's control and Company shall have no obligation to further perform in the area where the hazardous conditions exist until the area has been made safe by Customer as certified in writing by an independent testing agency, and Customer shall pay disruption expenses and re-mobilization expenses as determined by Company. This agreement does not provide for the cost of capture, containment or disposal of any hazardous waste materials, or hazardous materials, encountered in any of the Covered System(s) and/or during performance of the Services. Said materials shall at all times remain the responsibility and property of Customer. Company shall not be responsible for the testing, removal or disposal of such hazardous materials.

5. Equipment Disconnections. This represents Company's notice to you that the system(s)/device(s) listed on the face of this agreement as temporarily or permanently disconnected are no longer in service and, thus, cannot detect, perform and/or report

6. General. Unless otherwise specified, work shall be performed during company's regular business hours,, exclusive of Saturdays, Sundays and Company holidays. All work is subject to review and rebilling in accordance with the terms and conditions of Customer's agreement/contract with Company, if one is in effect. Company shall not be responsible for failure to render services due to causes beyond its control, including but not limited to material shortages, work stoppages, fires, civil disobedience or unrest, severe weather, fire or any other cause beyond the control of Company. Customer is aware that the Limitation of Liability and other provisions set forth in any existing agreement/contract, if one is in effect, or set forth above, apply to services performed and materials supplied. The terms of this agreement shall govern notwithstanding any inconsistent or additional terms and conditions in any purchase order or other document submitted by Customer.

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 12 of 15

DEFICIENCY IMAGE APPENDICES

LOCATION DESCRIPTION DEVICE BARCODE TYPE IMAGES

Attic (Building #02) Attic Pull Station — VISUAL FAILURE DEFICIENCY IMAGES APPENDIX 1.1

FAILURE REASON: Cover hinges broken

Penthouse (Building #01) By roof- top access Remote Key Switch — FUNCTIONAL FAILURE,VISUAL FAILURE DEFICIENCY IMAGES APPENDIX 1.2

FAILURE REASON: Switch not working and is corroded.

Basement (Building #01) Garage Pull Station — VISUAL FAILURE DEFICIENCY IMAGES APPENDIX 1.3

FAILURE REASON: Broken cover. Being held by tie wrap

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 13 of 15

Floor 01 (Building #03) Rear shop Pull Station — VISUAL FAILURE DEFICIENCY IMAGES APPENDIX 1.4

FAILURE REASON: Broken cover

Basement (Building #01) Telephone Rm FACP Panel Battery Battery — FUNCTIONAL FAILURE,VISUAL FAILURE DEFICIENCY IMAGES APPENDIX 1.5

FAILURE REASON: Failed load test and expiration date code of 08/2016.

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 14 of 15

DEVICE NOTE IMAGE APPENDICES

Fire Alarm v2–Annual

Customer: Northeast Fisheries Science Center Milford CT Lab Building: Northeast Fisheries Science Center Milford CT Lab

Fire Alarm v2 | 01/10/2023 Page 15 of 15