This is a Questions & Answers document for solicitation 1305M225Q0073 regarding vessel maintenance work for the NRT Patuxent (S3008). The document addresses four key technical questions about the project requirements.

The Q&A clarifies that recently painted areas from October 2024 (transom bracket and surrounding transom) do not need to be repainted and can be left undisturbed with just a final overcoat of bottom paint. It confirms that SFLC Standard Specification 8634 certification for dry docking facilities is not required. While blast cleanliness must meet NACE 2 standards, a NACE Level 2 inspector is not required - the contractor must meet paint manufacturer specifications and provide warranty coverage. The document also clarifies that the fuel tank and hull are separated, which has implications for the blasting work requirements.

View the file

Other files for this federal contract opportunity

Other files attached to NRT Patuxent vessel (S3008) ICCP & Bottom Paint, newest first.
File Type Posted
SOW_Rev1_0002.pdf PDF
Sol_1305M225Q0073_Amd_0002.pdf PDF
Sol_1305M225Q0073_Amd_0001.pdf PDF
52_212-3_(JAN_2025)(DEVIATION_FEB_2025)_0001.pdf PDF
52_212-5_(JAN_2025)(DEVIATION_FEB_2025)_0001.pdf PDF
4__SCA_WD___2015-4281.pdf PDF
1__RFQ_1305M225Q0073.pdf PDF
3__Contractor_Past_Performance_Reference_Sheet.pdf PDF
Sol_1305M225Q0073.pdf PDF
2__SOW_1305M225Q0073.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1305M225Q0073 Q&A

1. In October of 2024 under solicitation 1305M224Q0249, the transom bracket and surrounding transom was blasted, and an approved barrier coat and bottom paint system was applied. Attached photo shows the extent of the area with new coatings (in yellow). Leaving this area undisturbed, and only applying a final overcoat of bottom paint would represent a significant savings to the government while ensuring the corrosion protection and antifouling protection are still like new. Would the government accept a bid that leaves the outboards and recently recoated transom bracket untouched?

a. We agree with the assessment that the referenced areas don't necessarily need to be repainted since they have new paint. A revised SOW is provided.

2. Will this job require Dry Docking Facilities certification, SFLC Standard Specification 8634, which is the standard held for dry docking USCG small boats?

a. SFLC Standard Specification 8634 certification is not required.

3. Blast cleanliness will be in accordance with NACE 2 standards. Will a NACE level 2 inspector be needed to approve? If so will they only inspect after blasting, or will they be required to be present during all blasting? Will they be needed to inspect final paint, or will they need to be present during all painting operations?

a. A NACE Level 2 inspector is not required. The successful offeror is required to meet paint system manufacturer’s specifications for prepping and painting, and warrant the work in accordance with applicable warranty clauses in the contract.

4. Does the bottom of the boat that needs to be blasted make the bottom of the fuel tank, or are the tanks separated from the hull? If shared, are you considering the NACE 2 blasting hot work and will a marine chemist be needed to certify fume free before blasting?

a. The fuel tank and the hull are separated.