D.6PRICE,REV1.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Dry Docking and Repairs to NOAA Ship OREGON II
- Solicitation number
- 1305M221QNMAN0087
About this file
This document contains a price schedule for the solicitation to perform drydocking and repairs to NOAA Ship OREGON II. The schedule includes base line items for general requirements and work items such as temporary services, hull valve inspection, steel renewal and repairs. It also includes additional growth items estimated at 3,500 labor hours and a 12% material markup. Optional items are listed as well but two were deleted via amendment. The solicitation was issued by the Department of Commerce National Oceanic and Atmospheric Administration as number 1305M221QNMAN0087 to perform drydocking and repairs in accordance with the RFQ and associated documents. Interested parties are instructed to request access to reference documents from the named Contract Specialist and Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0006.pdf | ||
| 0005.pdf | ||
| 0004.pdf | ||
| AMEND 0003-final.pdf | ||
| AMEND 0002.pdf | ||
| AMENDMENT 0001.pdf | ||
| D.3 PP Questionnaire.doc | DOC document | |
| RFQ 1305M221QNMAN0087.pdf | ||
| D.5 SUBK PLAN.doc | DOC document | |
| D.4 U S DOL POSTER.pdf | ||
| D.6 PRICE SCHED.xlsx | XLSX spreadsheet | |
| D.1. OE2 FY22 SPEC-final.pdf | ||
| D.2 PP Info Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 2 | General Requirements | 1 | JB | |||
| 3.1 | Temporary Services | 1 | JB | |||
| 3.2 | Dry Docking and Routine Dry Dock Work | 1 | JB | |||
| 3.3 | Hull Valve Inspection and Overhaul | 1 | JB | |||
| 3.4 | AFT Peak Tank Inspection | 1 | JB | |||
| 3.5 | ABS Load Line Survey | 1 | JB | |||
| 3.6 | Steel Renewal and Repairs | 1 | JB | |||
| 3.7 | 01 Lvl Bimetallic Connection Renewal | 1 | JB | |||
| 3.8 | Galley Renewals | 1 | JB | |||
| 3.9 | Underwater Hull Maintenance Coat | 1 | JB | |||
| 3.10 | Coating System Renewals/Maintenance | 1 | JB | |||
| 3.11 | Main Deck Rubber Tile Renewal and Deck Gauging | 1 | JB | |||
| 3.12 | Annual Life Raft Survey | 1 | JB | |||
| 3.13 | Annual Fire Inspection | 1 | JB | |||
| 3.14 | Annual Lifting Equipment Load Test | 1 | JB | |||
| 3.15 | Miranda Davit Recertification and FRB Maintenance | 1 | JB | |||
| 3.16 | Electrical Repairs and Maintenance | 1 | JB | |||
| 3.17 | Hose Renewals | 1 | JB | |||
| 3.18 | Hydraulic System and Winch Overhauls | 1 | JB | |||
| 3.19 | Equipment Overhauls | 1 | JB | |||
| 3.20 | Reduction Gear Maintenance | 1 | JB | |||
| 3.21 | Piping Repair and Modifications | 1 | JB | |||
| 3.22 | Ventilation Renewals | 1 | JB | |||
| 3.23 | Insulation Repairs and Modifications | 1 | JB | |||
| 3.24 | Miscellaneous Repairs | 1 | JB | |||
| Total Base Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 30000/40000 | 4.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 3,500 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 3,500 | |
| 30000/40000 | 4.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $212,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$212,000.00 X percentage quoted]: $______________
| % | EST. $212,000.00 | ||||
| N/A | Additional Temp Services (See CAR CLAUSE 1352.271-86) | Day | EST 1 | ||
| N/A | Laydays (See CAR CLAUSE 1352.271-89 | Day | EST 1 | ||
| Total Growth | $0.00 | ||||
| OPTION ITEMS |
CLIN SPEC
WORK
| ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT |
| PRICE | EXTENDED |
PRICE
| 5.1 | WORK ITEM DELETED-AMENDMENT 0005 | 1 | JB | 0 | 0 |
| 5.2 | WORK ITEM DELETED-AMENDMENT 0005 | 1 | JB | 0 | 0 |
| 5.3 | Replace Bongo Winch with DT Winch | 1 | JB | ||
| 5.4 | Furniture Renewals | 1 | JB | ||
| 5.5 | Renew Fuel Manifold Bonnets | 1 | JB | ||
| Total Options | $0.00 |
| BASE |
| BASE + GROWTH |
| BASE+GROWTH+OPTIONS |
&KFF0000Price Schedule