ATTACHMENT A PRICING SCHEDULE.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 1305M220RNWWR0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 3.pdf | ||
| FormSF30 Amendment 2.pdf | ||
| FormSF30 Amendment 1.pdf | ||
| Questions and Answers.pdf | ||
| FormSF1442 Solicitation 1305M220RNWWR0025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| PRICING SCHEDULE | |||||||
| PRE-DETERMINED PRICING FOR ROOF REPLACEMENT OR REPAIR: | PROPOSED RATE (Year 1: date of award through 1 year) | PROPOSED RATE (Year 2: 1 year from date of award through 1 year) | PROPOSED RATE (Year 3: 2 years from date of award through 1 year) | PROPOSED RATE (Year 4: 3 years from date of award through 1 year) | PROPOSED RATE (Year 5: 4 years from date of award through 1 year) | ||
| LINE ITEM | UNIT | ||||||
| ASPHALT ROOF | |||||||
| A | MOBILIZATION/DEMOBILIZATION OF MATERIALS, EQUIPMENT, AND PERSONNEL TO PERFORM WORK, INCLUDING REMOVAL AND DISPOSAL OF ALL DEBRIS IN ACCORDANCE TO THE STATEMENT OF WORK | EA | |||||
| B | REMOVE EXISTING ASPHALT SHINGLES, EXISTING FELT, ALL ROOF NAILS AND DRIP EDGE | SF | |||||
| C | REMOVE EXISTING WATER DIVERTERS AND REINSTALL | EA | |||||
| D | REMOVE AND REPLACE ALL DAMAGED / DEFORMED / ROTTEN DECKING MATERIAL | SF | |||||
| E | SUPPLY AND INSTALL NEW 4” INCHES RIGID INSULATION (NORTHERN LOCATIONS ONLY) | SF | |||||
| F | SUPPLY AND INSTALL SELF-ADHERING LEAK BARRIER / ICE SHIELD MEMBRANE AT ALL VALLEYS, BOTTOM EDGES, AND NEXT TO AND UP PARAPHET WALL | SF | |||||
| G | SUPPLY AND INSTALL FELT PAPER | SF | |||||
| H | REMOVE EXISTING STEP FLASHING, BASE FLASHING, COUNTER FLASHING, CAP FLASHING, SAVE, PROTECT, AND REUSE. | LF | |||||
| I | SUPPLY AND INSTALL DRIP EDGE, TO MATCH ORIGINAL COLOR. | LF | |||||
| J | SUPPLY AND INSTALL NEW FASCIA METAL TRIM (ADDITIONAL METAL FACIA) (NORTHERN LOCATIONS ONLY) | LF | |||||
| K | Supply & Install New Vent system for Air Gap (NORTHERN LOCATIONS ONLY) | LF | |||||
| L | Supply & Install Lighting Arrestor Extention & Boots (NORTHERN LOCATIONS ONLY) | EA | |||||
| M | Supply & Install New Ridge Vents (NORTHERN LOCATIONS ONLY) | LF | |||||
| N | SUPPLY AND INSTALL NEW STRAPPING (NORTHERN LOCATIONS ONLY) | LF | |||||
| O | REMOVE, SAVE AND PROTECT AND THEN STORE ALL SHEET METAL COPING FOR RE-INSTALLATION (WHEN INSTALLED, USE SS FASTENDERS AND CLEAR CAULK ALL JOINTS) | LF | |||||
| P | SUPPLY AND INSTALL NEW (Step) FLASHINGS (ONLY IF OLD CANNOT BE SAVED OR BE REUSED) | LF | |||||
| Q | SUPPLY AND INSTALL CORRECT DECK FASTENERS (ONLY IF EXISTING WAS NOT INSTALLED PER MANUFACTURER SPECIFICATION) | SF | |||||
| R | SUPPLY AND INSTALL NEW 30 YEAR ARCHITECTURAL SHINGLES | SQ | |||||
| S | REMOVE AND REINSTALL LIGHTNING PROTECTION TERMINALS | EA | |||||
| T | 25 YEAR MANUFACTURERS/CONTRACTORS WATERTIGHT SYSTEM WARRANTY | EA | |||||
| METAL ROOF | |||||||
| U | MOBILIZATION/DEMOBILIZATION OF MATERIALS, EQUIPMENT, AND PERSONNEL TO PERFORM WORK, INCLUDING REMOVAL AND DISPOSAL OF ALL DEBRIS IN ACCORDANCE TO THE STATEMENT OF WORK | EA | |||||
| V | REMOVE EXISTING ROOF | SF | |||||
| W | SUPPLY AND INSTALL STEEL ROOFING PANELS | SF | |||||
| X | SUPPLY AND INSTALL RIDGE | LF | |||||
| Y | SUPPLY AND INSTALL FLASHING | LF | |||||
| Z | SUPPLY AND INSTALL DRIP EDGE, TO MATCH ORIGINAL COLOR. | LF | |||||
| AA | SUPPLY AND INSTALL RAKE EDGE, TO MATCH ORIGINAL COLOR. | LF | |||||
| BB | REMOVE AND REINSTALL LIGHTNING PROTECTION TERMINALS | EA | |||||
| CC | SUPPLY AND INSTALL INSULATION | SF | |||||
| DD | SEAL ALL PENETRATIONS WITH CORRECT CAULK | SF | |||||
| EE | 20 YEAR MANUFACTURERS/CONTRACTORS WATERTIGHT SYSTEM WARRANTY | EA | |||||
| MEMBRANE ROOF | |||||||
| FF | MOBILIZATION/DEMOBILIZATION OF MATERIALS, EQUIPMENT, AND PERSONNEL TO PERFORM WORK, INCLUDING REMOVAL AND DISPOSAL OF ALL DEBRIS IN ACCORDANCE TO THE STATEMENT OF WORK | SF | |||||
| GG | REMOVE EXISTING ROOF (MATERIALS) AND DETERIORATED INSULATION | SF | |||||
| HH | REMOVE AND REPLACE ALL SUB-STANDARD ISO INSULATION | SF | |||||
| II | REMOVE ALL EXISTING PITCH PANS | EA | |||||
| JJ | REMOVE, SAVE AND PROTECT AND THEN STORE ALL SHEET METAL COPING FOR RE-INSTALLATION | LF | |||||
| KK | FURNISH AND INSTALL ONE LAYER OF ½” HIGH DENSITY FIBERBOARD INSULATION. (R-VALUE=1.3 OR GREATER) | SF | |||||
| LL | FURNISH AND INSTALL EPDM OR TPO ROOFING MEMBRANE (MIN. 60 MIL.) OR EQUIVALENT | SF | |||||
| MM | RE-INSTALL THE EXISTING SHEET METAL COPING, FASTEN AND SEAL ALL JOINTS | LF | |||||
| NN | INSTALL WALK PADS | LF | |||||
| OO | FURNISH AND INSTALL NEW PREFABRICATED RUBBER PIPE BOOTS ON ALL PIPE PROTRUSIONS (6” OR LESS). | EA | |||||
| PP | FURNISH AND INSTALL EPDM UNCURED FLASHING (MIN. 60 MIL) | LF | |||||
| FURNISH AND INSTALL NEW PITCH PANS (CHEM. CURBS) | EA | ||||||
| RR | REMOVE AND REINSTALL LIGHTNING PROTECTION TERMINALS | EA | |||||
| SS | FURNISH AND INSTALL RETRO-FIT DRAIN INSERTS | EA | |||||
| TT | FURNISH AND INSTALL NEW PRESSURE TREATED WOOD SUPPORTS AND PROTECTION PADDING | SF | |||||
| UU | FURNISH AND INSTALL REDUNDANT UNCURED FLASHING AT ALL TRANSITION POINTS. | LF | |||||
| VV | FURNISH AND INSTALL A CLEAR BRICK SEALANT | SF | |||||
| WW | 20 YEAR MANUFACTURERS/CONTRACTORS WATERTIGHT SYSTEM WARRANTY | EA | |||||
| Total Amount |
1) The contractor's prices/rates listed above are legally binding upon award, and will be the maximum prices allowed for all task orders issued within the specified ordering period.
2) The contractor may, and is encouraged to, offer discounts from the prices listed above for each task order.
3) The appropriate Davis-Bacon Act (DBA) and/or Service Contract Act (SCA) wage determinations are applicable to this contract.
4) The contractor's fixed price/rates listed above shall be fully burdened and shall include direct, indirect costs, profit and construction labor. All DBA rates are locked for the entire term of the contract.
5) Mobilization shall include all activities and associated costs for transportation of the contractor's personnel (including related travel costs and labor), equipment and operating supplies to the site; premiums paid for performance and payment bonds as applicable. Demobilization shall include all activities and costs for transportation of personnel (and related personnel travel costs and labor), equipment and supplies not required or included in the contract from the site; including disassembly, removal, and site cleanup. This is a fixed rate that will be used in pricing proposals for roof replacement as described in the statement of work, regardless of the location where the work will be performed provided that the work to be performed is within the area/locations specified elsewhere in the contract. This rate includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or addessed.
6) The period of performance of this contract will be for a 5-year term (the date of award through 5 years).
File details come from the government source that posted it. Updated .