ATTACHMENT A PRICING SCHEDULE.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Regional Roof Replacement Single Award IDIQ-Amendment 0003
Solicitation number
1305M220RNWWR0025
Issued by

View the file

Other files

File Type Posted
SF30 Amendment 3.pdf PDF
FormSF30 Amendment 2.pdf PDF
FormSF30 Amendment 1.pdf PDF
Questions and Answers.pdf PDF
FormSF1442 Solicitation 1305M220RNWWR0025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

PRICING SCHEDULE
PRE-DETERMINED PRICING FOR ROOF REPLACEMENT OR REPAIR:PROPOSED RATE (Year 1: date of award through 1 year)PROPOSED RATE (Year 2: 1 year from date of award through 1 year)PROPOSED RATE (Year 3: 2 years from date of award through 1 year)PROPOSED RATE (Year 4: 3 years from date of award through 1 year)PROPOSED RATE (Year 5: 4 years from date of award through 1 year)
LINE ITEMUNIT
ASPHALT ROOF
AMOBILIZATION/DEMOBILIZATION OF MATERIALS, EQUIPMENT, AND PERSONNEL TO PERFORM WORK, INCLUDING REMOVAL AND DISPOSAL OF ALL DEBRIS IN ACCORDANCE TO THE STATEMENT OF WORKEA
BREMOVE EXISTING ASPHALT SHINGLES, EXISTING FELT, ALL ROOF NAILS AND DRIP EDGESF
CREMOVE EXISTING WATER DIVERTERS AND REINSTALLEA
DREMOVE AND REPLACE ALL DAMAGED / DEFORMED / ROTTEN DECKING MATERIALSF
ESUPPLY AND INSTALL NEW 4” INCHES RIGID INSULATION (NORTHERN LOCATIONS ONLY)SF
FSUPPLY AND INSTALL SELF-ADHERING LEAK BARRIER / ICE SHIELD MEMBRANE AT ALL VALLEYS, BOTTOM EDGES, AND NEXT TO AND UP PARAPHET WALLSF
GSUPPLY AND INSTALL FELT PAPERSF
HREMOVE EXISTING STEP FLASHING, BASE FLASHING, COUNTER FLASHING, CAP FLASHING, SAVE, PROTECT, AND REUSE.LF
ISUPPLY AND INSTALL DRIP EDGE, TO MATCH ORIGINAL COLOR.LF
JSUPPLY AND INSTALL NEW FASCIA METAL TRIM (ADDITIONAL METAL FACIA) (NORTHERN LOCATIONS ONLY)LF
KSupply & Install New Vent system for Air Gap (NORTHERN LOCATIONS ONLY)LF
LSupply & Install Lighting Arrestor Extention & Boots (NORTHERN LOCATIONS ONLY)EA
MSupply & Install New Ridge Vents (NORTHERN LOCATIONS ONLY)LF
NSUPPLY AND INSTALL NEW STRAPPING (NORTHERN LOCATIONS ONLY)LF
OREMOVE, SAVE AND PROTECT AND THEN STORE ALL SHEET METAL COPING FOR RE-INSTALLATION (WHEN INSTALLED, USE SS FASTENDERS AND CLEAR CAULK ALL JOINTS)LF
PSUPPLY AND INSTALL NEW (Step) FLASHINGS (ONLY IF OLD CANNOT BE SAVED OR BE REUSED)LF
QSUPPLY AND INSTALL CORRECT DECK FASTENERS (ONLY IF EXISTING WAS NOT INSTALLED PER MANUFACTURER SPECIFICATION)SF
RSUPPLY AND INSTALL NEW 30 YEAR ARCHITECTURAL SHINGLESSQ
SREMOVE AND REINSTALL LIGHTNING PROTECTION TERMINALSEA
T25 YEAR MANUFACTURERS/CONTRACTORS WATERTIGHT SYSTEM WARRANTYEA
METAL ROOF
UMOBILIZATION/DEMOBILIZATION OF MATERIALS, EQUIPMENT, AND PERSONNEL TO PERFORM WORK, INCLUDING REMOVAL AND DISPOSAL OF ALL DEBRIS IN ACCORDANCE TO THE STATEMENT OF WORKEA
VREMOVE EXISTING ROOFSF
WSUPPLY AND INSTALL STEEL ROOFING PANELSSF
XSUPPLY AND INSTALL RIDGELF
YSUPPLY AND INSTALL FLASHINGLF
ZSUPPLY AND INSTALL DRIP EDGE, TO MATCH ORIGINAL COLOR.LF
AASUPPLY AND INSTALL RAKE EDGE, TO MATCH ORIGINAL COLOR.LF
BBREMOVE AND REINSTALL LIGHTNING PROTECTION TERMINALSEA
CCSUPPLY AND INSTALL INSULATIONSF
DDSEAL ALL PENETRATIONS WITH CORRECT CAULKSF
EE20 YEAR MANUFACTURERS/CONTRACTORS WATERTIGHT SYSTEM WARRANTYEA
MEMBRANE ROOF
FFMOBILIZATION/DEMOBILIZATION OF MATERIALS, EQUIPMENT, AND PERSONNEL TO PERFORM WORK, INCLUDING REMOVAL AND DISPOSAL OF ALL DEBRIS IN ACCORDANCE TO THE STATEMENT OF WORKSF
GGREMOVE EXISTING ROOF (MATERIALS) AND DETERIORATED INSULATIONSF
HHREMOVE AND REPLACE ALL SUB-STANDARD ISO INSULATIONSF
IIREMOVE ALL EXISTING PITCH PANSEA
JJREMOVE, SAVE AND PROTECT AND THEN STORE ALL SHEET METAL COPING FOR RE-INSTALLATIONLF
KKFURNISH AND INSTALL ONE LAYER OF ½” HIGH DENSITY FIBERBOARD INSULATION. (R-VALUE=1.3 OR GREATER)SF
LLFURNISH AND INSTALL EPDM OR TPO ROOFING MEMBRANE (MIN. 60 MIL.) OR EQUIVALENTSF
MMRE-INSTALL THE EXISTING SHEET METAL COPING, FASTEN AND SEAL ALL JOINTSLF
NNINSTALL WALK PADSLF
OOFURNISH AND INSTALL NEW PREFABRICATED RUBBER PIPE BOOTS ON ALL PIPE PROTRUSIONS (6” OR LESS).EA
PPFURNISH AND INSTALL EPDM UNCURED FLASHING (MIN. 60 MIL)LF
QQFURNISH AND INSTALL NEW PITCH PANS (CHEM. CURBS)EA
RRREMOVE AND REINSTALL LIGHTNING PROTECTION TERMINALSEA
SSFURNISH AND INSTALL RETRO-FIT DRAIN INSERTSEA
TTFURNISH AND INSTALL NEW PRESSURE TREATED WOOD SUPPORTS AND PROTECTION PADDINGSF
UUFURNISH AND INSTALL REDUNDANT UNCURED FLASHING AT ALL TRANSITION POINTS.LF
VVFURNISH AND INSTALL A CLEAR BRICK SEALANTSF
WW20 YEAR MANUFACTURERS/CONTRACTORS WATERTIGHT SYSTEM WARRANTYEA
Total Amount

1) The contractor's prices/rates listed above are legally binding upon award, and will be the maximum prices allowed for all task orders issued within the specified ordering period.

2) The contractor may, and is encouraged to, offer discounts from the prices listed above for each task order.

3) The appropriate Davis-Bacon Act (DBA) and/or Service Contract Act (SCA) wage determinations are applicable to this contract.

4) The contractor's fixed price/rates listed above shall be fully burdened and shall include direct, indirect costs, profit and construction labor. All DBA rates are locked for the entire term of the contract.

5) Mobilization shall include all activities and associated costs for transportation of the contractor's personnel (including related travel costs and labor), equipment and operating supplies to the site; premiums paid for performance and payment bonds as applicable. Demobilization shall include all activities and costs for transportation of personnel (and related personnel travel costs and labor), equipment and supplies not required or included in the contract from the site; including disassembly, removal, and site cleanup. This is a fixed rate that will be used in pricing proposals for roof replacement as described in the statement of work, regardless of the location where the work will be performed provided that the work to be performed is within the area/locations specified elsewhere in the contract. This rate includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or addessed.

6) The period of performance of this contract will be for a 5-year term (the date of award through 5 years).

File details come from the government source that posted it. Updated .