(133)Aft_A-frame.pdf

PDF 4 MB Posted

Attached to
FY 2020 DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
1305M219RNMAN0049
Issued by

View the file

Other files

File Type Posted
PISCES_FY20_DS_Specification_Rev_2_Sept19.pdf PDF
PISCES_FY20_DS_Specification_Rev_1_Sept19.pdf PDF
(128)_Steering_Gear.pdf PDF
000-1H_General-Requirements-Ship-Ship-Repair-Contracts.pdf PDF
MIL-D-3134J_(Navy).pdf PDF
3010-502,_R0-Hose_Booklet_Piping_Assy_3010.pdf PDF
dwg524-_FP18_Scientific_SW_System_Diagram_(2_sheets).pdf PDF
FP09-001-04AB-Hydraulic_Diagram.dwg DWG drawing
300-2.pdf PDF
(106-010)Switchboard_Manual_Vol_1.pdf PDF
SH-529-FP01-Bilge___Ballast_System_Diagram.pdf PDF
(134)Knuckle_Boom_Crane.pdf PDF
(089)controlledenviroment-refsys.pdf PDF
(115)watertightdoorsNEW.pdf PDF
Lifting_Appliances_Guide_e-May17.pdf PDF
HB-631_FF04_Paint_Schedule.pdf PDF
505-1B.pdf PDF
PC-529-FP01_Bilge_and_Ballast_System_Diagram_(2_sheets).pdf PDF
HB-512-_FV02_HVAC_Diagram.pdf PDF
(012)Centerboard_AmClyde_Model_CB-32.pdf PDF
SH-512-FV04-001-01-HVAC_Fan_List.pdf PDF
4030-502,_R0-Hose_Booklet_Piping_Assy_4030.pdf PDF
(105)StoreHandlingCrane.pdf PDF
FE43-001-03ab-Bonding_and_Grounding_Details.dwg DWG drawing
63421-006H_PPI_for_Polymetric_Deck_Coverings.pdf PDF
(070)Pumps_manual.pdf PDF
HB-085-_FA02_General_Arrangements_(6_sheets).pdf PDF
SH-081-FM10-Equipment_Removal_Routes.pdf PDF
SH-073-FP22-Generator_Intermediate_Mass_Raft_Details.pdf PDF
631-4.pdf PDF
(106-030)Switchboard_Manual_Vol_3.pdf PDF
FP16_Chilled_Water_System_Diagram.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
MSC_CIRC_1114_for_Survival_Suit_testing.pdf PDF
100-1A.pdf PDF
SH-521-FP20-Firemain_System_Diagram.pdf PDF
634-1B_DECK_COVERINGS.pdf PDF
631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
AMC-583-1B_General_Requirements_for_Liferaft_Inspections.pdf PDF
997-1B_Drydocking-Routine_Drydock-Work.pdf PDF
1308001-GD-01.pdf PDF
FE41-001-029-03ab-Penetration_Details.dwg DWG drawing
SH-593-FP11-04_Oily_Waste___Waste_Oil_System_Diagram.pdf PDF
(015)chillwaterplant.pdf PDF
FF03-001-00ab-Color_Coordination_Manual.pdf PDF
SH-072-FR05-Resiliently_Mounted_Equipment.pdf PDF
(106-020)Switchboard_Manual_Vol_2.pdf PDF
SH-512-FV03-HVAC_FCU___Cooling_Coil_List.pdf PDF
dwg300-_FE01_Power_One-_Line_(39_sheets).pdf PDF
FE45-001-029-03ab-Electrical_Installation_Details.dwg DWG drawing
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRV40-226-133-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Aft A-Frame Model: HI-1118

Halter Marine, Inc.

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

50-SPNA-1-00031

PUBLISHED BY DIRECTION OF NOAA

FRV40-226-133-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Model: HI-1118

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

PUBLISHED BY DIRECTION OF NOAA

15 OCT 2007

RECORD OF CHANGES

Change No.

Date Title and/or Brief Description Signature of Validating Officer

APPROVAL AND PROCUREMENT RECORD PAGE

APPROVAL DATA FOR: FRV40-226-133-010

TITLE OF MANUAL: Aft A-Frame

APPROVAL AUTHORITY: NOAA

Contract Number

Ship Applicability

Qty Of Manuals

Building Yard

50-SPNA-1-00031 FRV40-226 2 EA Halter Marine Inc.

REMARKS:

CERTIFICATION: It is hereby certified that FRV40-226 to be provided under contract 50-SPNA-1-00031 has been approved by the approval data shown above.

Date:________________ Chand, LLC Mathews, LA 70375

CAGE CODE: 0D5X4

VALIDATION PERFORMANCE

Title of Publication

Contractor Sub-Contractor (If

Performing Validation)

Contract No.(s) and Purchase Orders, If Applicable

Chapter

Section Paragraph Date Validation Completed

Check here if Not Validated

Contents of this manual have been validated and certified to be applicable to the equipment furnished under the above procurement as specified for Validation.

Name & Authority of Validating Officer: Signature of Validating Officer:

FOREWORD

This manual is intended to clearly and accurately reflect the actual configuration of the installed equipment described for the FRV40-226 Aft A-Frame. Users are urged to report instances noted wherein the manual does not achieve this objective.

This technical manual provides the instructions necessary to operate, to perform maintenance on and troubleshooting of the Aft A-Frame. The text is broken down as follows:

Section 1- General Information and Safety Precautions

Section 2- Operation

Section 3- Functional Description

Section 4- Scheduled Maintenance

Section 5- Troubleshooting

Section 6- Corrective Maintenance

Section 7- Drawings and Parts Listing

Section 8- Installation

(133)Aft A-frame.pdf
FRV40-224-133-010
RECORD OF CHANGES
APPROVAL AND PROCUREMENT RECORD PAGE
VALIDATION PERFORMANCE
FOREWORD
INSTALLATION, OPERATION & SERVICE MANUAL FOR AFT A-FRAME
SECTION 1 - GENERAL INFORMATION & SAFETY PRECAUTIONS
SECTION 2 - OPERATION
SECTION 3 - FUNCTIONAL DESCRIPTION
SECTION 4 - SCHEDULED MAINTENANCE
SECTION 5 - TROUBLESHOOTING
SECTION 6 - CORRECTIVE MAINTENANCE
SECTION 7 - DRAWINGS AND PARTS LISTS
SECTION 8 - INSTALLATION

METRIC SYSTEM AND EQUIVALENTS

(133)Aft A-frame.pdf
FRV40-224-133-010
RECORD OF CHANGES
APPROVAL AND PROCUREMENT RECORD PAGE
VALIDATION PERFORMANCE
FOREWORD
INSTALLATION, OPERATION & SERVICE MANUAL FOR AFT A-FRAME
SECTION 1 - GENERAL INFORMATION & SAFETY PRECAUTIONS
SECTION 2 - OPERATION
SECTION 3 - FUNCTIONAL DESCRIPTION
SECTION 4 - SCHEDULED MAINTENANCE
SECTION 5 - TROUBLESHOOTING
SECTION 6 - CORRECTIVE MAINTENANCE
SECTION 7 - DRAWINGS AND PARTS LISTS
SECTION 8 - INSTALLATION

METRIC SYSTEM AND EQUIVALENTS

File details come from the government source that posted it.