This document is a Work Clearance Triggers document outlining environmental and regulatory compliance requirements for construction and operational activities. The first section details Air Quality requirements for Clark County, including dust permit triggers such as land disturbance over 0.25 acres, mechanized trenching over 100 linear feet, and mechanical demolition of structures larger than 1,000 square feet. Storm Water Pollution Prevention Permit requirements mandate a site-specific SWPPP for construction activities disturbing one or more acres, with specific exemptions for routine maintenance.

Additional sections cover Water Quality permitting for main water line tapping, Cultural Resources archaeological site assessments, and Natural Resources checks for endangered species protection. The second page focuses on Air Quality Title V Permit Revisions, requiring detailed reporting for any new or removed emissions equipment, with a 120-day processing timeline. A POL (Petroleum, Oils, Lubricants) section mandates reporting new, replacement, or relocated storage tanks to the Nellis AFB POL Program Manager, including comprehensive tank details such as location, serial number, model number, usage, and capacity.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Clearance Triggers Air Quality- Clark County Dust Permit:

• 0.25 acre (10,890 square feet) disturbance in overall area

• Mechanized trenching more than one hundred (100) linear feet

• Mechanical demolition of any structure larger than one thousand (1,000) square feet

• Disturbance includes driving, laydown areas, earth moving activities, etc.

Storm Water Pollution Prevention Permit:

• Construction activities disturbing one (1) or more acres (more than 43,560 square feet) in aggregate require a site specific SWPPP and the timely submission of a Notice of Intent (NOI) to NDEP

• Per NDEP Permit NVR100000, part 1.4.6.2, Routine maintenance that disturbs less than 5 acres that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of a facility or structure is exempt.

• Disturbance does not include driving, laydown areas, and paving repairs as long as soil is not exposed

Water Quality

• Any tapping activity to the main water lines will require specific permits through NDEP.

Cultural Resources:

• Check to see if disturbance will affect any archaeological sites.

Natural Resources:

• Check to see if disturbance will affect any endangered species sites, such as

Desert Tortoise, burrowing owls, and Desert Poppy.

Air Quality- Title V Permit Revisions:

• Any new emissions equipment (Storage Tank, Fuel Dispenser, Boiler, Generator, Fire Pump, Hush House, Paint Booth, Media Blaster, Cooling

Tower, Incinerator, Woodworking Equipment, Degreaser, Etc.) being added or replaced.

o It takes about 120 days to add a new item to the next permit revision, and equipment cannot be used until on the permit.

o Air Quality needs: list of equipment, manufacturer, model number, designed rated capacities/heat ratings, production/throughput, etc.

• Any old emissions equipment (see above list) being removed.

POL

• New or replacement POL storage tanks must be reported to the Nellis

AFB POL Program Manager. The program manager will need detailed information from the tank (location, serial number, model number, usage, capacity, etc.).

• Tank custodians must also report when a tank is taken out of service or moved.

File details come from the government source that posted it. Updated .