This document is a Work Clearance Triggers document outlining environmental and regulatory compliance requirements for construction and operational activities. The first section details Air Quality requirements for Clark County, including dust permit triggers such as land disturbance over 0.25 acres, mechanized trenching over 100 linear feet, and mechanical demolition of structures larger than 1,000 square feet. Storm Water Pollution Prevention Permit requirements mandate a site-specific SWPPP for construction activities disturbing one or more acres, with specific exemptions for routine maintenance.
Additional sections cover Water Quality permitting for main water line tapping, Cultural Resources archaeological site assessments, and Natural Resources checks for endangered species protection. The second page focuses on Air Quality Title V Permit Revisions, requiring detailed reporting for any new or removed emissions equipment, with a 120-day processing timeline. A POL (Petroleum, Oils, Lubricants) section mandates reporting new, replacement, or relocated storage tanks to the Nellis AFB POL Program Manager, including comprehensive tank details such as location, serial number, model number, usage, and capacity.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Clearance Triggers Air Quality- Clark County Dust Permit:
• 0.25 acre (10,890 square feet) disturbance in overall area
• Mechanized trenching more than one hundred (100) linear feet
• Mechanical demolition of any structure larger than one thousand (1,000) square feet
• Disturbance includes driving, laydown areas, earth moving activities, etc.
Storm Water Pollution Prevention Permit:
• Construction activities disturbing one (1) or more acres (more than 43,560 square feet) in aggregate require a site specific SWPPP and the timely submission of a Notice of Intent (NOI) to NDEP
• Per NDEP Permit NVR100000, part 1.4.6.2, Routine maintenance that disturbs less than 5 acres that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of a facility or structure is exempt.
• Disturbance does not include driving, laydown areas, and paving repairs as long as soil is not exposed
Water Quality
• Any tapping activity to the main water lines will require specific permits through NDEP.
Cultural Resources:
• Check to see if disturbance will affect any archaeological sites.
Natural Resources:
• Check to see if disturbance will affect any endangered species sites, such as
Desert Tortoise, burrowing owls, and Desert Poppy.
Air Quality- Title V Permit Revisions:
• Any new emissions equipment (Storage Tank, Fuel Dispenser, Boiler, Generator, Fire Pump, Hush House, Paint Booth, Media Blaster, Cooling
Tower, Incinerator, Woodworking Equipment, Degreaser, Etc.) being added or replaced.
o It takes about 120 days to add a new item to the next permit revision, and equipment cannot be used until on the permit.
o Air Quality needs: list of equipment, manufacturer, model number, designed rated capacities/heat ratings, production/throughput, etc.
• Any old emissions equipment (see above list) being removed.
POL
• New or replacement POL storage tanks must be reported to the Nellis
AFB POL Program Manager. The program manager will need detailed information from the tank (location, serial number, model number, usage, capacity, etc.).
• Tank custodians must also report when a tank is taken out of service or moved.