28 - Nuclear Gauge Form 1.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a Nuclear Gauge Authorization Form for bringing radioactive materials (RAM) onto Nellis Air Force Base, Creech AFB, or the Nevada Test & Training Range (NTTR). The form requires comprehensive documentation for radiation safety, including details about the contract, authorized users, radiation devices, and licensing information. Contractors must submit a complete package at least 30 days prior to using nuclear density gauges, which includes a request letter, contract copy, current NRC or state license, training certificates for authorized users, and current leak test certificates.

The form mandates that contractors fill out a detailed log tracking RAM usage, including operator information, device details, and entry/exit times on the base. The authorization is typically granted for 3-6 months and can be extended, with the Installation Radiation Safety Officer reserving the right to conduct periodic assessments to ensure compliance with radiation safety practices. Failure to provide complete documentation will result in automatic denial of the request, and the authorization letter does not guarantee base entry clearance.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Authorization Form

Requesting Authorization to Bring Radioactive Materials (RAM) onto Nellis AFB, Creech AFB, or The Nevada Test & Training Range (NTTR)
Submit to: usaf.nellis.99-mdg.list.99-omrs-sgpb-all-personnel@mail.mil Phone: 702-653-3316
1What base you will be working on? Nellis/Creech/NTTR/?
Name of the Licensee (person or firm proposing to conduct the activities described below):
The final approval letter will be sent to: Attention to (Name & Cell #):
The Email address the approval letter will be sent to:
Full Physical Address/Phone # of Licensee:
Email address of the licensee:

Author: Author:

2ContractEnsure you submit a copy of the contract.
Contract Project #:
Project Name:
Projected Starting Date:
Projected Ending Date:
Type of scope of activities to be performed:
Project Location:

Author: Provide: the closest major cross street & Bld#(if any).

Map Link:

Author: Place a MAP Link (google/other) indicate where exactly the equipment will be used (with an arrow). Or place a map on the bottom of this sheet showing the exact location where the equipment will be used, major cross street needs to be shown. If there are more than one location, please ensure you paste more than one map under each others.

Author: Author:

3Radiation Safety Officer(RSO)
RSO on site Name and Cell #:
Alternate RSO Name /email/Cell #:
Safety Monitor Name/email/Cell #:
Onsite Project Mgr Name/email/Cell #:
4Is a copy of the following A or B attached with your request?Please make sure you submit this required document.
A) State of Nevada Dept Of Health Human Sevices health deivision, Bureau of Health care quality and compliance (Nevada License and Authorized Rad Material).(YES) _______ (NO)____________
B) NRC Approval (required only for NTTR/TTR operation) not required for Creech or Nellis.(YES) _______ (NO)____________
5Authorized Users
Author: Please make sure you submit all their certificates in the same order as in this sheetPlease make sure you submit all their certificates in the pdf file in the same order as in this sheet
a- Authorized User Name:
User's Certification date:
b-Authorized User Name:
User's Certification date:
c-Authorized User Name:
User's Certification date:
d-Authorized User Name:
User's Certification date:
e-Authorized User Name:
User's Certification date:
f-Authorized User Name:
User's Certification date:
g-Authorized User Name:
User's Certification date:
h-Authorized User Name:
User's Certification date:
6Authorization devicesPlease make sure you submit all the leak certificates in the pdf file in the same order as in this sheet. Certificates in this sheet should match the one in pdf.
a-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
b-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
c-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
d-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
e-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
f-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
7License
Company's RAM License #:
Name of the license under:
Expiration Date:
Please ensure you send the following documents in one pdf file in the same order 1-6 as follows:
1- A request letter from the company (what/where/when/who?)
2- Copy of this spread sheet.
3- Copy of the contract
4*- Copy of the current NRC or Agreement State License. (Working in NTTR ranges requires an approval from the Nuclear Regulatory Commission (NRC)- A signed form 241 is required. OR a copy of the license from an approved state only if your work area is only within Nellis/Creech)
5- Copy of training Certificates for all authorized users listed on this document. Training should be commensurate with the hazard material being used.
6- Copy of a current leak test certificate that meets the requirements of the RAM license.
7- Another copy of this sheet in Excel Format (* need to be sent separately*).
8- The contractor MUST use the "LOG sheet" (see next tab in this Excel Sheet). All yellow marking needs to be completed before emailing the log sheet. Please make sure you follow the proper procedure within the authorization letter that you will be receiving within 30 days or less from the date that this sheet is received. This 30 days may exceed if the required information is not completed.
9- Once you receive your authorization letter, make sure you carry it at all time while you are on base.
10 - Keep in mind your Authorization may take 30 days to be approved by Bioenvironmental Engineering
11- The authorization letter does not mean you have a clearence to enter USAF base
12- The above items along with this excel sheet must be submitted 30 days prior using nuclear density gauge on base.
12- Ensure all the yellow boxes are filled out accordingly. All information will be re-verified.
13- You will receive the approval for 3 or 6 months or up to the swipe sample date whichever is less, the approval can be extended.
Failure to submit a complete package containing the aforementioned documents will result in automatic denial of the request.
By signing this agreement you acknowledge the Installation RSO may conduct a periodic assessment of your work to ensure contractor personnel are complying with radiation safety practices to prevent exposures to USAF personnel and the general public, as well as, avoiding contamination of government property.
Name, Signature &Date:
Place your map here below (resize it to fit this frame)

Log

1- This log is required to be kept onsite at all-time PROJECT/Contract #:_______________________________________
2- Fill out #1-5 (and email this sheet no less than 24 hours before entering the installation). Make sure you place the Project # in the subject line windows. #1-4 can be empty if unknown, but then it will be filled out accordingly.Email: usaf.nellis.99-mdg.mbx.99-amds-bio-eng@mail.mil
3- Fill out # 6-9 before leaving the installation. No need to email it when completed. However, this sheet can be requested at any time by the Installation Radiation Safety Officer (IRSO).During Duty Hours: 702-653-3316

After Duty Hours: 702-289-3486

4- Name your file in the following format before emailing it to IRSO: Date-ProjName-ProjNumber with attention in the subject line: IRSO Project/contract#
Nellis AFB/Creech AFB/NTTR (Circle one) RAM UTILIZATION LOG
RAM Use Location:Company:Project:
Event123456789
Operator (Full Name)ModelSerial NumberCalibration DateProjected Date &Time Entering BaseActual Date & Time Entering BaseActual Date & Time Exiting BaseTime Source Removed from ShieldingTime Source Returned to Shielding
1|||
2|||
3|||
4|||
5|||
6|||
7|||
8|||
9|||
10|||
11|||
12|||
13|||
14|||
15|||
16|||
17|||
18|||
19|||
20|||
21|||
22|||
23|||
24|||
25|||
26|||
27|||
28|||
29|||
30|||

File details come from the government source that posted it. Updated .