This is a preliminary bid results document for the Coblentz Corner Phase 1 Project, a general construction contract managed by Community Strategies Group in Pennsylvania. The project involves structural repairs and replacement, non-structural framing, roofing, insulation, and exterior finishes at 100 West Front Street, Berwick, PA. Sealed bids were accepted through the PennBid website until September 15, 2026 at 1:00 PM, with results posted online following the bid opening. A non-mandatory pre-bid conference was held on August 26, 2026 at 10:30 AM at the project site. Questions from bidders were required to be submitted through PennBid by September 8, 2026 at 5:00 PM, with no phone or email inquiries accepted. Bid documents were available at no cost through the PennBid website.

Three bids were received as of the preliminary results dated September 15, 2026: JB Gibbons Construction submitted the lowest bid at $1,465,000.00, followed by H&P Construction, Inc at $1,503,237.00, and Gray Builders LLC at $1,544,866.16. A bid bond equal to ten percent of the proposed contract sum and performance and payment bonds each equal to one hundred percent of the contract sum are required. The project is subject to Pennsylvania Prevailing Wage Rate requirements, the Build America Buy America Act, RACP funding requirements, the Pennsylvania Office of the Budget Domestic Steel Products Procurement Act, and federal MBE/WBE/Section 3 requirements under 24 CFR Part 75. Results are noted as being under review for documentation of responsiveness, with the owner reserving the right to accept or reject any or all bids.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coblentz Corner Phase 1

PRELIMINARY BID RESULTS

9/15/26

Note: Results are under review for documentation of responsiveness.

$ 1,544,866.16

Gray Builders LLC $ 1,465,000.0

JB Gibbons Construction $ 1,503,237.0

H&P Construction, Inc