13-Attachment B.8 Washington Avenue.pdf
PDF 108 KB Posted
- Solicitation number
- 250257
- Issued by
- Sedgwick County, Kansas
About this file
This document is a location map for the 2025 OP3 Localized Repair project, displaying the geographic boundaries and street layout of the work area. The map shows the project area bounded by E Central Ave to the north, E 3rd St N to the south, N Kinsley Ave to the west, and N 6th Ave to the east, with N Washington Ave running north-south through the middle of the designated zone highlighted in red.
The map includes a north arrow indicator and appears to be part of contract documentation for localized infrastructure repair work scheduled for 2025. No additional details regarding pricing, contract terms, bidding requirements, or specific repair specifications are provided in this location reference document, as it serves primarily as a geographic reference tool for contractors and project stakeholders to identify the precise boundaries of the work zone.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .