10-Attachment B.6 Kellogg Drive.pdf
PDF 120 KB Posted
- Solicitation number
- 250257
- Issued by
- Sedgwick County, Kansas
About this file
This document is a localized repair locations map for the 2025 OP3 project, showing a street-level view of the designated work area. The map displays a specific section highlighted in red along W Kellogg Dr, with the repair location situated between several intersecting streets including S Maize Rd, W Key Lago Dr, and W Herby St, with W Ringer St visible to the north and W Merton St to the south. The map includes directional orientation with a north arrow and shows the S Sherwood Dr reference point.
The document appears to be a supporting exhibit or project location map that would typically accompany contract documentation for localized infrastructure repair work, though specific details regarding pricing, contract terms, funding sources, or procurement requirements are not provided in this visual reference material.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .