1-Attachment A Street List Quantaties.pdf
PDF 141 KB Posted
- Solicitation number
- 250257
- Issued by
- Sedgwick County, Kansas
About this file
This is a project specification document for the 2025 CIP Outsourced Pavement Preservation Program and 2025 CIP OP3 Localized Repair, involving a municipal jurisdiction with projects distributed across Districts 1-6. The program encompasses two distinct pavement preservation initiatives: one focused on asphalt mat and composite surface treatments including partial depth repairs (127 tons), full depth repairs (1,032 tons), and thermal crack repairs (2,879 feet), and another focused on concrete pavement repairs including 8-inch reinforced concrete pavement repairs (2,970 square yards), 12-inch reinforced concrete pavement repairs (624 square yards), and 6-inch reinforced concrete base repairs (1,144 square yards). The projects span multiple street segments across residential, collector, and arterial classifications, with locations including NE of 143rd & 13th, Sand Pointe, Exchange/Savannah, Emerson, Ross Parkway, Mount Vernon, Kellogg, and Washington streets.
The scope includes ancillary work such as curb and gutter installation (totaling 1,144 linear feet), sidewalk construction (172 square feet), driveway work (22 square yards), valley gutter installation (16 square yards), and utility connections (1 inlet hookup). The projects are organized by map references (Maps 1-8) and cover various pavement surface types including asphalt mat, composite, and concrete surfaces across different street classifications from residential to arterial roads. The document does not specify contract terms, pricing information, submission deadlines, or funding sources, suggesting this may be a preliminary scope document or technical specification for the pavement preservation program.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2025 CIP Outsourced Pavement Preservation Program 2025 CIP OP3 Localized Repair
NE of 143rd & 13th N 143RD ST E N SPORT OF KINGS CT District 2 Residential Asphalt Mat 65 1020 1930
MAP 1
SAND POINTE EOP SAND POINTE District 3 Residential Asphalt Mat 10 12 949
Map 2
EXCHANGE SAVANNAH 25TH District 3 Residential Composite 42 180
MAP 5
EMERSON 11TH PONDEROSA District 5 Residential Composite 10 112
MAP 7 Total = 127 1032 2879 292
ROSS PKY RUTAN ROSS PKY District 3 Collector Concrete 1030 230
MAP 3
MOUNT VERNON BLUFF CRESTWAY District 3 Arterial Concrete 1550 265
MAP 4
KELLOGG KELLOGG KELLOGG District 4 Residential Concrete 624 342
MAP 6
EMERSON 11TH PONDEROSA District 5 Residential Composite 10 27
MAP 7
WASHINGTON 3RD CENTRAL District 1/6 Arterial Concrete 380 280
MAP 8 Total = 2970 624 1144
6" Reinf.
Concr. Base
Repair (sy)
NotesStreet From To District Class Surface Partial Depth
(tons)
Full Depth
(tons)
Thermal
Crack (ft)
Surface
8" Reinf.
Concr. Pvmt.
Repair (sy)
12" Reinf.
Concr. Pvmt.
Repair (sy)
Curb &
Gutter NotesStreet From To District Class
1 inlet hookup
16 sq yd valley gutter
172 sq ft Sidewalk; 22 sq yd 6" Driveway
File details come from the government source that posted it. Updated .