Amendment 01 Site Visit Notes Wetland Restoration Princes Point WI 12FPC324B0006.pdf
PDF 90 KB Posted
- Attached to
- Prince's Point WRE, Jefferson County, WI Federal contract opportunity
- Solicitation number
- 12FPC324B0006
About this file
This document is Amendment 01 to the solicitation for the Prince's Point Wetland Restoration Construction project in Jefferson County, Wisconsin under Solicitation Number 12FPC324B0006.
The amendment incorporates the site visit sign-in sheet, site visit notes, and various attachments, including construction and material specifications, geology and geotechnical reports, river stage information, and well construction data. It also confirms that CAD drawings and geotechnical investigation data are available to bidders. The amendment provides responses to questions regarding the availability of CAD files and geotechnical data, as well as information on the required permits for the project. The period of performance is August 12, 2024 to February 18, 2026.
The wetland restoration project will be conducted by the USDA Farm Production and Conservation (FPAC) Operations Branch, Acquisition Division on behalf of the USDA Natural Resources Conservation Service (NRCS). The project includes the construction of four wetland management basins, shallow scrapes and islands, water control structures, and access road and bridge improvements.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12FPC324B0006
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FPAC-HQ-12FPC3
FPAC-HQ-12FPC3@usda.gov Western Section USDA FPAC Business Center
07/17/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/03/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 01 - Site Visit Notes and Attachments - Prince's Point Wetland Restoration
Construction - Jefferson County, WI
The purpose of this amendment is to:
a) Incorporate the Sign-in Sheet from Site Visit
b) Incorporate the Site Visit Notes and Site Visit Showing
c) Incorporate the following Attachments:
- Attachment 1 Construction and Material Specifications Revised
- Attachment 5 Geology Report Backhoe Pit Logs
- Attachment 6 Grid Soils Investigation Maps
- Attachment 7 Geotechnical Drilling Report Map Lab Tests
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LAUREEN M. EIPP
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC324B0006/0001
- Attachment 8 River Stages 2 - 100 Year Storm
Series
- Attachment 9 Locally Collected River Stage
Elevations
- Attachment 10 Well Construction Report
d) Attach links to CAD drawings
The following are questions and answers received thus far:
Q: Is the CAD available for our use for bidding purposes?
A: Yes, Computer-Aided Drafting (CAD) files are necessary to confirm existing ground surfaces and lines and grades for bidding. The files have been shared via link on the SAM solicitation.
Q: Geo-Tech investigation data available for our viewing?
A: Yes, the geotechnical information (drill logs, blow counts, and soil lab tests) should be made available to all bidders because it characterizes site soils and the level of effort needed to drive steel sheet piling in Bid Item 12, and install water control structures in Bid Items 10 and 21 - 23.
Q: Can we get a copy of the WDNR Stormwater permit, WDNR Chapter 30 permit and the Jefferson
Co. Flood Plan Permit?
A: All permits, permit provisions, and permit contingencies will be made available to the selected firm. They are not necessary for bidding. The permits include:
a. WPDES General Permit No. WI-S067834-06 from
DNR;
b. Nationwide Permit 27 from USACE;
c. 401 Water Quality certification or waiver from
DNR;
d. Land Use (floodplain) permit from Jefferson
County, WI
Period of Performance: 08/12/2024 to 02/18/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)