Frenchman_IRSC_Map_1_of_3.pdf

PDF 2 MB Posted

Attached to
Frenchman Stewardship
Solicitation number
129JGP18R0069
Issued by

About this file

Frenchman IRSC Map 1 of 3

View the file

Other files

File Type Posted
Frenchmen_Final_Cruise.pdf PDF
129JGP18R0069_-_Amendment_0001.pdf PDF
129JGP18R0069_-_Frenchman_IRSC.pdf PDF
APPENDIX_C.pdf PDF
APPENDIX_A.pdf PDF
APPENDIX_B.pdf PDF
Experience_Questionnaire.docx DOCX document
Frenchman_IRSC_Map_2_of_3.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ê

56005600

5800 5800

F r e n c h m a n L a k e

24N46X

N9

N0

1G

N4

6X

24N01D

24N91

24N

01C

N0

1F

24N 01B

24N9124N91

24N01E

25N11G

24N

X

24N52

28N01

24N76

25N11F

24N78 24N78

24N91

24N88

25N11E

25N11

N7

N4

6X

24N01

24N00

24N01

24N44A

25N11

·}þ2 8 4

3 3 3 2

2 9

2 7

3 4

2 0

2 8

Frenchman Campground

Spring Creek Campground

Crystal Vista

Big Cove Campground

Frenchman Forest Service

Cottonwood Spring Campground

Crystal

Frenchman 1-043 Dam

Frenchman Dam

!(20!(19

!(5

!(6

!(18

!(17

!(16

!(7

!(8

T 24N R 16E

T 23N R 16E

Map Created At:

Kasandra Meyer, Timber Sale Preparation, Beckwourth Ranger District, Plumas National Forest Date: 05/08/2018

Data Location:

T\FS\NFS\Plumas\BKRD\FrenchmanLakeFHP2016\GIS\Implementation\Frenchman\Maps

Land Lines are approximate Erosion Prevention and Control - K-G.6#;

Tillage - 0.10 Acres Erosion Prevention and Control - K-G.6#;

SEP - 0 Acres Project Activity Level (PAL) K-H.2.2#

Project Activity Level-Eastside Weather Station-Boulder Creek, K-H.2#, K-H.2.2# Ph. # 1(800) 847-7766

0 0.1 0.2 0.3 0.4 Milesµ

F re n c h m a n IR S C S te w a rd s h ip C o n tra c t A re a M a p 1 o f 3 P lu m a s N a t io n a l F o re s t , B e c k w o u r th R a n g e r D is tr ic t

S u b d iv is io n R e q u ire m e n ts

7,16,17,18 ITM, NO LOP, DF, TS, WHOLE, MIN,

TRAC, SUSP, SPACE, ENDL, MH,

MAX

BACKBLADING, REMOVE

5,6,8,19,20 ITM, DxSpa, NO LOP, DF, TS, WHOLE, MIN, TRAC, SUSP, SPACE, ENDL, MH, MAX, BACKBLADING, REMOVE

Contract Area SOS1

Subdivisions 7 and 8

SOS2

D is p o s a l S ite R e q u ire m e n ts

ALL MACH,COVER

R o a d R e q u ire m e n ts

24N01,24N46X, 24N78,24N76, 25N11,24N91

KO, T

Mandatory Service Items 1-Cut, Skid and Chip, All Subdivisions, 184 Acres 2- Haul Biomass, All Subdivisions , 184 Acres

3-Road Maintenance, 4 miles 4-Cleanup and Haul Material to Designated Disposal Site, All subdivision landings

25N11

25' Equipment Exclusion Zone

82' Equipment Exclusion Zone 82' Equipment Exclusion Zone

L e g e n d Contract Area Boundary (B.0)

Subdivision, Mechanical Thin, ITM, Green Paint, (B.0, K-C.3.5#) Protection of Improvements (B.0, K-G.2.2#) ê Protect Cattleguard (B.0, K-G.2.2#) x x x Protect Fence (B.0, K-G.2.2#) P r o te c t S tre a m c o u r s e (H .1 2 , H .1 9 , K -G .5 )

Ephemeral Intermittent

! ! ! Perennial Controlled Area, Botany (H.12) NHD Waterbody

" " " " " " " " " Streams Beyond Contract Area Road Number (B.0) Highway (B.0) Gravel Road (B.0) Dirt Road (B.0) High Clearance Road (B.0) Paved Road (B.0) Un Classified Road (B.0)

> > Haul Route (B.0)

> Disposal site (B.0)

O W N E R C L A S S IF IC AT IO N

Other Ownership Forest Boundary B.0) Ranger District Boundary (B.0)

!(18

Requirements

ITM

Legend

Individual Tree Selection, B.0, C.3.5, K-C.3.5#

DxSpa

Designation By Prescription, B.0, C.3.5, K- C.3.5#, K-C.3.5.1#

SOP1

Sale Operations Schedule, Recreation Season, Week after Labor Day Holiday thru March 31st, K-G.3.1.5#

SOP2 Sale Operations Schedule, Seasonal Spawning, K-G.3.1.5#

NO LOP No Lop, G.4.1, K-G.4.1#

WHOLE Whole Tree Yarding, G.4.1, K-G.4.1#

DF Directional Falling, , G.4.1, K-G.4.1#

TS Treatment Of Stumps, G.4.1, K-G.4.1#

MIN Minimum stump height, G.4.1, K-G.4.1#

TRAC Ground Based Skidding, Skid Trail Layout G.4.2, K-G.4.2#

SUSP Ground Based Skidding, One End Suspension, SPACE Ground Based Skidding, Skid Trail Spacing, ENDL Ground Based Skidding, Endlining, MH Ground Based Skidding, Mechanical Harvest, BackBlading Back blading in place of tillage in Recreation

Areas, K-G.6#

TILL Tillage, K-G.6# REMOVE Remove Logging Slash to designated Disposal

Site, G.7, K-G.7# MACH Slash Treatment, Machine Pile Disposal Site, G.7, K-G.7#

COVER Slash Treatment, Cover Disposal Site Piles, G.7, K-G.7#

File details come from the government source that posted it.