129JGP18R0069_-_Amendment_0001.pdf
PDF 147 KB Posted
- Attached to
- Frenchman Stewardship Federal contract opportunity
- Solicitation number
- 129JGP18R0069
About this file
129JGP18R0069 - Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Frenchmen_Final_Cruise.pdf | ||
| Experience_Questionnaire.docx | DOCX document | |
| Wage_Determination.pdf | ||
| 129JGP18R0069_-_Frenchman_IRSC.pdf | ||
| Frenchman_IRSC_Map_1_of_3.pdf | ||
| APPENDIX_C.pdf | ||
| APPENDIX_A.pdf | ||
| APPENDIX_B.pdf | ||
| Frenchman_IRSC_Map_2_of_3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
9JGP
Craig A. Ericson
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this solicitation amendment 0001 is to extend the solicitation due date to 7/13/2018, and remove the surface replacement deposits from Appendix C. This project will not have Surface Replacement Deposits.
Also included in this amendment is a list of questions with answers that were submitted.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
USDA FOREST SERVICE
R5 CENT-CAL ACQ SERV AREA CCASA
631 COYOTE STREET
NEVADA CITY, CA 9595
4. REQUISITION/PURCHASE REQUISITION NUMBER
917571
9A. AMENDMENT OF SOLICITATION NUMBER
129JGP18R0069
01 03
07/05/2018
9B. DATED (SEE ITEM 11)
06/13/2018
SOLICITATION NO. 129JGP18R0069
FRENCHMAN IRSC
PLUMAS NATIONAL FOREST
Submitted Questions with Answers
1. Where is the designated water source?
Frenchman Boat launch
2. Could we get a bf volume per unit breakdown?
I attached the cruise reports with this info. Look for the U1 reports.
3. Would it be possible to complete the removal of debris in landing at the end of project instead of within 15 days of the last load of forest products?
This could be negotiated, depending on the location of the landing and timeframe. This stipulation was put in place to make sure landing piles were not left in campgrounds for too long.
Especially Subdivision 16, which the landing will be the boat launch parking lot. This will mean a Forest Order closure. So we want the material removed from the parking lot as soon as possible.
4. Typically Road Maintenance / Slash Treatment / Surface Replacement are not included in service contracts. The contract has Surface deposits being required, is this contract meant to have surface deposits?
This is correct, my mistake, surface replacement can be removed from the contract
5. In Appendix B page 2 the contract states that maximum stump height shall not exceed 6'' for saw timber and 3'' for biomass. On page 19 of Appendix B it states that stumps shall not exceed 1'' in height for visual quality within recreation sites. My interpretation of this is that within camp grounds the stump height should not exceed 1'' in height and outside of camp grounds the stumps shouldn't exceed 6'' or 3''. Is this correct?
This is correct
6. Would it be possible to extend the termination date?
As long as it does not interrupt the recreational season of the campgrounds. I would feel comfortable giving an extension if needed.
SOLICITATION NO. 129JGP18R0069
FRENCHMAN IRSC
PLUMAS NATIONAL FOREST
7. In the Specifications, Appendix B, section K-G.6 - EROSION PREVENTION AND CONTROL it states “Contractor shall use the type of native seed mixtures, mulch, and fertilizer as listed below:”
Seed Mix
US Forest Service Botanist will supply a species list upon request
Pounds/Acre
10-15 lbs
Type of Mulch
N/A
Fertilizer
N/A
N/A 20 bales straw (hay) per acre
State of California Certified weed free straw (hay)
N/A
Can you provide the seed mix for this project?
This will be upon award of contract. Most likely this will not be needed.
| 129JGP18R0069 - Amendment 0001 |
| 129JGP18R0023 Amendment 0004 |
| 129JGP18R0030 Amendment 0002 |
| 129JGP18R0013 Amendment 0002 |
Questions
File details come from the government source that posted it.