APPENDIX C
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 129JGP18R0069_-_Amendment_0001.pdf | ||
| Frenchmen_Final_Cruise.pdf | ||
| Experience_Questionnaire.docx | DOCX document | |
| 129JGP18R0069_-_Frenchman_IRSC.pdf | ||
| Frenchman_IRSC_Map_1_of_3.pdf | ||
| Wage_Determination.pdf | ||
| APPENDIX_A.pdf | ||
| APPENDIX_B.pdf | ||
| Frenchman_IRSC_Map_2_of_3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX C
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 1 of 27
Road Maintenance Requirements
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary attached specifications, and drawings:
K-F 3.1# – ROAD MAINTENANCE REQUIREMENTS. (9/04)
Table A – Requirements Summary
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary
Seg
Road
Termini Mile
Applicable Pre-haul Road Maintenance From To T801 T802 T803 T804 T805 T806 T807 T808 T809 T810
1 25N11 CA284 24N52 1.5
2 24N01 CA284 24N46X 2.4
3 24N76 24N01 MP 0.6 0.6
4 24N78 24N01 MP 0.6 0.6
5 24N46X 24N01 MP 0.9 0.6
6 24N91 25N11 MP 0.4 0.4
7 24N52 25N11 MP 0.2 0.2
C = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Termini
Mile Applicable During Haul Road Maintenance
From To T801 T802 T803 T804 T805 T806 T807 T808 T809 T810
1 25N11 CA284 24N52 1.5 P 1
2 24N01 CA284 24N46X 2.4 P 2
3 24N76 24N01 MP 0.6 0.6 P
4 24N78 24N01 MP 0.6 0.6 P
5 24N46X 24N01 MP 0.9 0.6 P
6 24N91 25N11 MP 0.4 0.4 P
7 24N52 25N11 MP 0.2 0.2 P P P
C = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to
Termini Mile
Applicable Post Haul Road Maintenance From To T801 T802 T803 T804 T805 T806 T807 T808 T809 T810
1 25N11 CA284 24N52 1.5 P
2 24N01 CA284 24N46X 2.4 P
3 24N76 24N01 MP 0.6 0.6 P
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 2 of 27
4 24N78 24N01 MP 0.6 0.6 P
5 24N46X 24N01 MP 0.9 0.6 P
6 24N91 25N11 MP 0.4 0.4 P
7 24N52 25N11 MP 0.2 0.2 P
P = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to
K-F(T)3.1# - ROAD MAINTENANCE REQUIREMENTS. (7/01)
TABLE B – DUST ABATEMENT PLAN
Timber Sale Name:
FRENCHMAN IRSC
MATERIAL TYPE WATE
R
MAGNESIUM
CHLORIDE
ROAD SEGMENTS
All
Same as water
INITIAL APPLICATION
RATE
During Purchaser's operations other than hauling, complete dust abatement after 40 accumulated T.U.
During hauling operations, complete dust abatement once a day before hauling.
complete dust abatement before hauling at 0.5 Gal./S.Y.
SUBSEQUENT
APPLICATION RATE AND
FREQUENCY
During Purchaser's operations other than hauling, complete dust abatement after 40 accumulated T.U.
complete dust abatement every 350 tons hauled or as required to maintain complete dust abatement.
complete dust abatement with water as required.
Every 35,000 tons hauled complete dust abatement at
0.5 Gal./S.Y.
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 3 of 27
PREPARATION METHOD
N/A
Method 1
WEIGHT VOLUME
CONVERSION
FACTOR
182 Gal./S.Y.
Notes: T.U. = Traffic Units as referenced in commensurate share calculations.
Pickup or automobile (1 way) = 1 T.U. Semi Truck (2way)=15 T.U.
Complete Dust Abatement=Surface is firm, compacted and free of dust.
Other dust palliatives may be used when agreed to by the USFS.
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 4 of 27
K-F.3.1# – ROAD MAINTENANCE REQUIREMENTS. (7/01)
TABLE C – MAINTENANCE T-800 SPECIFICATIONS
Specification No. Specification Title
Definitions
Slide and Slump Repair
Ditch Cleaning
Surface Blading
Surfacing Repair
Drainage Structures
Dust Abatement
Roadway Vegetation
Miscellaneous Structures
Waterbars
Barriers
Surface Treatment
(5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 5 of 27
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used in Specifications T-801 through T-809, the intent and meaning shall be interpreted as follows:
800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "agreement", "agreed", or "approval" such agreement or approval shall be promptly confirmed in writing.
800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 - Base Course. Material used to reinforce subgrade or, as shown on drawings, placed on subgrade to distribute wheel loads.
800-1.4 - Berm. Curb or dike constructed to prevent roadway run-off water from discharging onto embankment slope.
800-1.5 - Borrow. Select material taken from designated borrow sites.
800-1.6 - Crown, Inslope and Outslope. The cross slope of the traveled way to aid in drainage and traffic maneuverability.
800-1.7 - Culverts. A conduit or passageway under a road, trail or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the traveled way.
800-1.8 - Drainage Dip. A dip in the traveled way which intercepts surface runoff and diverts the water off the traveled way. A drainage dip does not block the movement of traffic.
800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the roadway including culverts, overside drains, aprons, flumes, downdrains, downpipes, and the like.
800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates and estimated number of subsequent applications
800-1.11 - Lead-off Ditches. A ditch used to transmit water from a drainage structure or drainage dip outlet to the natural drainage area.
800-1.12 - Material. Any substances specified for use in the performance of the work.
T-800-1 5/83
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 6 of 27
800-1.13 - Prehaul Maintenance. Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under BT6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in CT5.31#.
Prehaul maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T-Specifications.
800-1.14 - Roadbed. The portion of a road between the intersection of subgrade and sideslopes, excluding that portion of the ditch below subgrade.
800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.
800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the roadway.
800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.
800-1.18 - Shoulder. That portion of roadway contiguous with traveled way for accommodation of stopped vehicles, for emergency use, and lateral support of base and surface course, if any.
800-1.19 - Slide. A concentrated deposit of materials from above or on backslope extending onto the traveled way or shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the traveled way so as to block passage of traffic.
800-1.21 - Slump. A localized portion of the roadbed which has slipped or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.
800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23 - Subgrade. Top surface of roadbed upon which base course or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
800-1.24 - Surface Course. The material placed on base course or subgrade primarily to resist abrasion and the effects of climate.
Surface course may be referred to as surfacing.
800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.
800-1.26 - Traveled Way. That portion of roadway, excluding shoulders, used for the movement of vehicles.
800-1.27 - Turnouts. That portion of the traveled way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.28 - Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.29 - Waterbar. A dip in the roadbed which intercepts surface runoff and diverts the water off the roadway. A waterbar is not designed to be traversable by logging trucks.
T-800-2 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 7 of 27
FIGURE 800-2 ILLUSTRATION OF ROAD STRUCTURE TERMS
NOTE: X & Y Denote Clearing Limits Outside of Roadway
T-800-3 (5/83)
LIMIT
LIMITCLEARING WIDTH
TRAVELED WAY
SURFACE COURSE
BASE COURSE
DRAINAGE DITCH
GROUND LINE
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 8 of 27
SPECIFICATION T-801 SLIDE AND SLUMP REPAIR
DESCRIPTION
1.1 Slide removal is the removal from Roadway and disposal of any material, such as soil, rock, and vegetation that cannot be routinely handled by a motor grader during Ditch Cleaning, T-802, and Surface Blading, T-803 Operations.
Slump repair is the filling of depressions or washouts in Roadway which cannot be routinely filled by a motor grader during Surface Blading, T-803 Operations.
Slide removal and slump repair includes excavation, loading, hauling, placing, and compacting of waste or replacement material and the development of disposal or borrow areas.
REQUIREMENTS
3.1 Slide material, including soil, rock and vegetative matter which encroaches into the Roadway, shall be removed. The slope which generated the slide material shall be reshaped during the removal of the slide material with the excavation and loading equipment.
Slide material deposited on the fill slope and below the Traveled Way will not be removed unless needed for slope stability or to protect adjacent resources.
Surface and Base Courses shall not be excavated during slide removal operations.
Slide material which cannot be used for other beneficial purposes shall be disposed of at disposal sites SHOWN ON THE SALE AREA MAP. Material placed in disposal sites will not require compaction unless compaction is SHOWN ON THE ROAD
MAINTENANCE PLAN.
3.2 When filling slumps or washouts, material shall be moved from agreed locations or borrow sites SHOWN ON SALE AREA MAP, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer.
Existing aggregate surfacing shall be salvaged when practical and relaid after depressions have been filled.
Damaged aggregate base, aggregate surfacing, and bituminous pavement shall be repaired under Specification T-804 Surfacing Repair.
The repaired areas of the slump shall conform to the cross section which existed prior to the slump and shall blend with the adjacent undisturbed Traveled Way.
3.3 The maximum volume of Purchaser responsibility for slide and slump repair is SHOWN ON ROAD MAINTENANCE PLAN.
Greater volumes of slide and slump repair not qualifying as Catastrophic Damage are Forest Service responsibility.
T-801-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 9 of 27
SPECIFICATION T-802 DITCH CLEANING
1.1 Ditch cleaning is removing and disposing of all slough material from roadway ditches to provide a free-draining waterway.
3.1 Ditch cleaning shall be repeated during the year as often as necessary to facilitate proper drainage.
3.2 All slough material or other debris which might obstruct water flow in the roadway ditch shall be removed. Material removed from the ditch, if suitable, may be blended into existing native road surface or Shoulder or placed in designated Berms in conjunction with Surface Blading T-803 operations.
Material removed from ditches that is not by agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site SHOWN ON THE SALE AREA MAP.
3.3 Roadway backslope or Berm shall not be undercut.
T-802-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 10 of 27
SPECIFICATION T-803 SURFACE BLADING
1.1 Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the crown, inslope or outslope of the Traveled Way, Turnouts, and Shoulder; repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.
3.1 Surface blading shall be performed before, during, and after Purchaser's use as often as necessary to facilitate traffic and proper drainage.
3.2 The surface blading shall preserve the existing cross section. Surface irregularities shall be eliminated and the surface left in a free draining state and to a smoothness needed to facilitate traffic. Surface material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface material and to provide for a thorough mixing of the material being worked.
3.3 Water, taken from Water Sources DESIGNATED ON THE SALE AREA MAP, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface material.
3.4 On native surfaced roads, Material generated from backslope sloughing and ditch cleaning may be blended with the surface material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course material unless agreed otherwise.
3.5 Roadway backslopes or Berms shall not be undercut nor shall new Berms be established unless agreed otherwise. Berms shall be repaired by placing Material as needed to restore the Berm to reasonably blend with existing line, grade, and cross section.
3.6 Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross section.
3.7 Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8 Rocks or other material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. The oversized material shall be disposed of by sidecasting unless SHOWN OTHERWISE ON THE SALE AREA MAP. Sidecasting into streams, lakes or water courses will not be permitted.
3.9 Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10 Material resulting from work under this specification plus any accumulated debris shall be removed from bridge decks and the deck drains opened.
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 11 of 27
SPECIFICATION T-804 SURFACING REPAIR
1.1 Surfacing repair is repairing potholes or small, soft areas in the Traveled Way. It includes area preparation and furnishing and placing all necessary materials, and other work necessary to repair the surface.
MATERIAL
2.1 Material used in the repair of soft areas on aggregate or native surfaced roads may be acquired from approved commercial sources, Forest Service borrow areas SHOWN ON SALE AREA MAP or borrow sources agreed to. The quality and quantity of the imported Material used in the repair will be limited to that needed to provide a stable Traveled Way for hauling and to minimize damage to the road and adjacent resources. The quantity of imported surface repair material used in the appraisal estimate will be SHOWN ON THE ROAD MAINTENANCE PLAN. However, the magnitude of the work may vary depending on Purchaser's hauling schedule and ground conditions.
2.2 Material used in the repair of bituminous pavements may be acquired from local commercial sources. If a mixing table is required, the location shall be approved by the Forest Service. The bituminous mixture to be used by the Purchaser shall be approved by the Forest Service. The Purchaser's share of the quantity of bituminous mixture used in the appraisal estimate will be SHOWN ON THE ROAD MAINTENANCE PLAN. However, Purchaser's share of the work may vary depending on Purchaser's hauling schedule, ground conditions, other traffic, etc.
3.1 Work under this specification shall be performed in a timely manner to reduce further deterioration of the Traveled Way.
3.2 Soft spots on aggregate or native surfaces shall be repaired by placing the imported surface course on top of the soft spot. Layers of imported material shall be placed until a firm surface is produced.
3.3 Bituminous Pavement Repairs
The areas to receive bituminous pavement repairs will be marked on the road surface by the Forest Service just prior to Purchaser performing the work.
3.4 Potholes (deep patch)
Surface course and base course materials shall be excavated to a depth necessary to reach firm, suitable material. The minimum depth of excavation shall be two inches and the maximum depth of excavation shall be to the top of the Subgrade.
The edges of the prepared hole shall be extended to form a vertical face in unfractured asphalt surfacing. The prepared hole shall generally be circular or rectangular in shape, dry, and cleaned of all loose material.
Prepared potholes shall be patched or barricaded immediately.
The faces of the prepared hole shall be tacked with a slow-setting emulsified asphalt.
The bituminous mixture shall be placed in layers not exceeding a compacted depth of two inches. Each layer shall be compacted thoroughly with hand or mechanical tampers or rollers. Compaction shall not be done with equipment wheels.
Upon completion, the compacted patch in the pothole shall be flush, with a tolerance or approximately one-fourth inch to one-half inch above the level of the adjacent pavement.
3.5 Skin Patches
Prior to skin patching, potholes shall be patched, and the surface shall be cleaned of loose and deleterious material. Apply a tack coat with a slow-setting emulsified asphalt at the rate of 0.1 gallons per square yard.
T-804-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 12 of 27
SPECIFICATION T-804 SURFACING REPAIR
Bituminous mixture shall be distributed uniformly with feathered edges in layers not to exceed two inches compacted depth. When multiple layers are ordered, joints shall be offset at least six inches between layers.
Each layer shall be compacted by two passes with a 7-10 ton steel roller or comparable vibratory roller.
3.6 Asphalt Berm
Damaged segments of Berm shall be removed and the exposed ends beveled at approximately forty-five degrees from vertical. The Berm foundation shall be cleaned and patched as necessary. The foundation and joining surfaces shall be coated with a slow-setting emulsified asphalt. Asphalt mix shall be placed and compacted to conform with the shape and alignment of the undamaged segment.
3.7 Disposal
All materials removed from potholes, patches, and Berms shall be disposed of at disposal sites SHOWN ON THE SALE AREA MAP.
T-804-2 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 13 of 27
SPECIFICATION T-805 DRAINAGE STRUCTURES
1.1 This work consists of maintaining Drainage Structures and related items such as inlet and outlet channels, existing riprap, trash racks and drop inlets.
MATERIALS
2.1 All materials used in the maintenance of Drainage Structures shall conform by type and specification to the material in the structure being maintained.
3.1 Drainage Structures and related items shall be cleared of all foreign material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into maintenance work shall be hauled to a disposal site SHOWN ON THE SALE AREA MAP.
3.2 If outlet or inlet riprap was installed by Purchaser as a construction item or existed prior to Purchaser's haul, it shall be maintained in good condition including the replacement of riprap if necessary to previous line, grade, and cross section.
3.3 Perform maintenance to insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks, and other facilities related to the Drainage Structure.
T-805-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 14 of 27
SPECIFICATION T-806 DUST ABATEMENT
1.1 This work shall consist of preparing Traveled Way and furnishing and applying materials to abate dust.
2.1 The roads requiring dust abatement, type of dust abatement material to be used, the rates of application, and frequency of applications will be SHOWN ON THE DUST ABATEMENT PLAN. The Dust Abatement Plan may be changed by written agreement.
2.2 Water
Water sources: approved locations are SHOWN ON SALE AREA MAP.
2.3 Dust abatement materials shall meet the requirements of the following Subsections of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects or ATTACHED SPECIAL PROJECT SPECIFICATIONS.
Bituminous Materials
Liquid Asphalts. . . . . . . . . . . . . . . 702.02 Bituminous Dust Palliatives. . . . . 725.02 Application Temperatures . . . . . . 702.04
Blotter Material. . . . . . . . . . . . . . .. . . . . . . 703.13
Lignin Sulfonate. . . . . . . . . . . . . . . . . . . . . 725.20
Application Temperature. . . . . . . Water, for diluting
306.04(b) 306.04(b)
Magnesium Chloride. . . . . . . . . . . . . . . . . 725.02
Application Temperature. . . . . . . 725.01
2.4 Testing of Materials
Certification and sampling of bituminous materials lignin sulfonate, and magnesium chloride shall be in accordance with Subsection 105.04, 5-725.03, and 5-730.03, respectively, of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
3.1 General
Dust abatement materials shall be applied to the road surface as necessary to control road surface loss, provide for road user safety, and minimize damage to adjacent resources.
3.2 Compaction
When the methods listed below specify compaction, Traveled Way shall be compacted by an 8 to 10 ton pneumatic, steel-wheeled or equivalent vibrating roller making 2 passes over the full Traveled Way and Shoulder width, unless compaction is not required on the
DUST ABATEMENT PLAN.
T-806-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 15 of 27
3.3 Preparation to Dust Abatement Materials Other Than Water.
The following applies to all methods of preparation:
Bituminous residue shall be scarified and pulverized to produce loosened material not exceeding 4 inches in greatest dimension.
Traveled Way shall be bladed in accordance with T-803.
Prior to applying DO-6BA, DO-6PA, or DO-8 the top 2 inches of Traveled Way shall contain not less than 80 percent nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C. Prior to applying other bituminous material Traveled Way shall have a moisture content between 1 and 3 percent. If surface dusting prevents the bituminous material from penetrating, a light application of water shall be applied just prior to applying the bituminous material.
Lignin Sulfonate and magnesium chloride shall be applied when the top 1 inch of Traveled Way contains not less than 3 percent moisture nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C.
Moisture content will be determined in accordance with AASHTO T-217 OR T-239.
One or more of the following methods shall be used as specified in the DUST ABATEMENT PLAN.
Method 1. Compact Traveled Way and apply the dust abatement material.
Method 2. Develop a layer of loose material approximately one inch in depth for the full width of Traveled Way. Apply the dust abatement material to this loose material and compact after penetration. If traffic makes maintenance of the loose material difficult, one inch of the material may be bladed into a windrow along the shoulder. The specified moisture content shall be maintained in the windrow and the top one inch of Traveled Way. The windrow shall be bladed to a uniform depth across Traveled Way just prior to applying the dust abatement material. When the dust abatement material has penetrated, Traveled Way shall be compacted.
Method 3. Blade one inch of material from Traveled Way into a windrow along the Shoulder. Maintain the specified moisture content in the windrow and the top inch of Traveled Way. Apply half the dust abatement material. When the dust abatement material has penetrated, the windrow shall be bladed to a uniform depth across dust abatement Traveled Way, and the remaining dust abatement material shall be applied. Traveled Way shall be compacted.
Method 4. Develop a layer of loose material approximately 2 inches in depth for the full width of Traveled Way. Apply half the dust abatement material to the loose material. Blade the top 2 inches into a windrow along the Shoulder. Apply the remaining dust abatement material to Traveled Way and the Berm. Spread the Berm evenly across Traveled Way and compact.
3.4 Preparation for Dust Abatement with Water
Traveled Way shall be prepared in accordance with Specification T-803 Surface Blading when required.
3.5 Application Tolerance
Dust abatement materials other than water shall be applied within 0.05 gallons per square yard of the rate specified.
3.6 Mixing Requirements
DO-6BA, DO-6PA, and DO-8 shall be thoroughly circulated in the distributor within one hour of application.
806-2 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 16 of 27
3.7 Weather Limitations
Dust abatement materials shall not be applied when it is raining.
Bituminous material shall be applied when the surface temperature of Traveled Way is 50 degrees Fahrenheit or higher.
Lignin sulfonate and magnesium chloride shall be applied when the atmospheric temperature is 40 degrees Fahrenheit or higher.
3.8 Blotter Material
Blotter material shall be spread in a sufficient quantity to prevent tire pickup.
T-806-3 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 17 of 27
SPECIFICATION T-807 ROADWAY VEGETATION
1.1 This work includes removal of brush and trees from within the Roadway limits.
3.1 Vegetative matter within the Roadway which impedes vehicular travel or interferes with road maintenance operations, such as surface blading, ditch and culvert cleaning, shall be removed. Downed timber meeting utilization standards shall be cut in appropriate lengths and decked along the Roadside in locations where the Traveled Way or sight distances will not be impaired.
3.2 Vegetative matter removed from the Roadway shall be treated by the specified method SHOWN ON THE SALE AREA MAP and as required by contract provisions.
T-807-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 18 of 27
SPECIFICATION T-808 MISCELLANEOUS STRUCTURES
1.1 Maintenance of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.
2.1 Any materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the material in the structure being maintained.
3.1 Cattleguards. Loose rails shall be welded or bolted back in place.
Excess material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.
3.2 Gates. Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.
Brush and debris shall be removed from within the swinging radius.
T-808-1 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 19 of 27
SPECIFICATION T-809 WATERBARS
1.1 This work consists of installing or removing Waterbars in the Roadbed.
3.1 Waterbars shall be installed on roads SHOWN ON THE ROAD MAINTENANCE PLAN in accordance with the ATTACHED DRAWING AND AT LOCATIONS DESIGNATED or STAKED ON THE GROUND.
All material excavated shall be used in the installation of the Waterbar. Bermed material shall be compacted by operating heavy equipment over the length and width of the Berm.
3.2 Waterbars shall be removed on roads SHOWN ON ROAD MAINTENANCE PLAN by blading the Berm into the adjacent depression to form a smooth transition along the Traveled Way. The length and width of the fill material shall be compacted by the equipment performing the work.
3.3 Waterbars may be required to be installed between seasons of use and then removed when haul is resumed. Waterbar installation may also be required when use of a road has been completed.
T-809-1 5/83
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 20 of 27
SPECIFICATION T-810 BARRIERS
1.1 This work shall consist of furnishing, installing, or removing barriers. Gates are not included.
MATERIALS
2.1 Materials for Barriers shall meet the requirements AS SHOWN ON THE ATTACHED DRAWINGS.
REQUIREMENTS
3.1 Barriers shall be installed in accordance with the ATTACHED DRAWINGS.
The location of Barriers to be removed or installed is SHOWN ON THE SALE AREA MAP. Installation or removal may occur as often as road use is terminated and resumed.
T-810-1 5/83
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 21 of 27
SPECIFICATION T-811 SURFACE TREATMENT
1.1 This work shall consist of applying a chip seal, sand seal, or fog seal to the Traveled Way.
Chip seals may consist of single or double applications of bituminous material and cover aggregate.
MATERIALS
2.1 The roads requiring Surface Treatment, the type of seal coat to be applied, he rate of application, and type and grade of bituminous material, and the rate of application and grading of cover aggregate will be SHOWN ON THE SURFACE TREATMENT PLAN (C5.4).
2.2 Emulsions used for fog seals shall be diluted with an equal amount of water and shall be applied at the diluted application rate
SHOWN ON THE SURFACE TREATMENT PLAN (C5.4).
2.3 Seal coat materials shall meet the requirements of the following Sub-sections of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects or ATTACHED SPECIAL PROJECT SPECIFICATIONS:
Bituminous Materials
Asphalt Cement
702.01
Liquid Asphalts....................... 702.02 Emulisfied Asphalt.................... 702.03 Application Temperatures.......... 702.05
Cover Aggregate........................... 703.12 Blotter Material........................... 703.13 Water for Diluting......................... 712.01
2.4 The cover aggregate shall be surface damp at the time of application when using emulisfied asphalt and dry when using an asphalt cement or liquid asphalt. Excess water on the aggregate surface will not be permitted.
3.1 Traffic
Traffic shall be maintained in accordance with C6.33.
3.2 Weather Limitations
Fog seal and chip seal shall not be applied when the weather is foggy or rainy.
Seal coats requiring cover aggregate shall not be applied when the temperature of the surface being treated is below 70 degrees Fahrenheit in the shade.
Fog seal coats shall not be applied when the surface temperature is below 40 degrees Fahrenheit in the shade.
3.3 Equipment
The following equipment or its equivalent shall be used:
A distributor truck equipped to spread the material uniformly at the designated rate, within the temperature range specified and within
0.04 gallons per square yard of the rate specified. The distributor shall be equipped with a thermometer and a hand hose with spray
A rotary power broom and/or blower.
When cover aggregates are applied: a pneumatic tire roller, 8 ton minimum weight with all tires equally inflated to a pressure of at least 90 pounds per square inch. Rollers shall be equipped with devices for applying water to the tires.
T-811-1 5/83
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 22 of 27
SPECIFICATION T-811 SURFACE TREATMENT
Self-propelled aggregate spreader supported by at least four wheels equipped with pneumatic tires on two axles, situated so that at no time will the tires contact the uncovered bituminous materials. The aggregate spreader shall be equipped with positive controls so that the required amount of materials will be deposited uniformly over the full width.
Trucks with spreading attachments shall not be used.
3.4 Preparation of surface
Immediately before applying the bituminous material, the surface to be sealed shall be cleaned of all forgien and loose material.
3.5 Application of bituminous material
Bituminous material shall be applied in an uniform, continous spread. The distributor shall be moving forward at proper application speed, at the time the spray bar is opened. Skipped areas or deficiences shall be corrected prior to the application of cover aggregate.
The spread of bituminous material shall not be more than 6 inches wider than the width to be covered by the cover aggregate.
Operations shall not proceed if the bituminous material is allowed to cool, set up, dry, or otherwise impair retention of cover aggregate.
Fog seal shall be allowed to penetrate and dry before traffic is permitted on the sealed portion.
The surfaces of structures and trees adjacent to the area being treated shall be protected to prevent their being spattered or marred.
3.6 Application of Cover Aggregate and Blotter
Immediately following the application of the bituminous material, cover aggregate shall be spread at the specified rate. Joints between adjacent applications of cover aggregate shall be approximately in the center of two-lane roads.
The aggregate spreader shall not be operated at speeds which cause the aggregate to roll over after striking the bituminous material.
The cut-off of aggregate shall be complete, and any excess aggregate shall be removed from the surface prior to resuming operations.
Immediately after the cover aggregate has been spread, any piles, ridges, and uneven distribution shall be corrected.
Cover aggregates may be applied by hand in areas inaccessible to spreading equipment.
Rolling shall begin immediately after spreading the cover aggregate and shall consist of a minimum of two complete coverages.
The second treatment of a double chip seal shall not be applied until at least 24 hours after completion of a first treatment, when an emulsion or asphalt cement is used. If a medium cure liquid asphalt is used, 48 hours shall be allowed between applications. Prior to the second treatment, any loose cover aggregate remaining on the surface after the first treatment shall be removed in such a manner that the cover aggregate set in the bituminous material will not be displaced.
After rolling, traffic shall be controled to a maximum speed of 15 miles per hour for a period of 4 hours.
The day following the final application of cover aggregate, any concentrations of loose cover aggregate shall be redistributed without disturbing the embedded aggregate. Four days after the final application of cover aggregate, all excess cover aggregate shall be removed. During this period, any bituminous material that comes to the surface shall be covered with additional cover aggregate or approved blotter material.
3.7 Blotter material for fog seals shall be spread in sufficient quantity to prevent tire pickup.
T-811-2 (5/83)
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 23 of 27
SPECIAL PROJECT SPECIFICATION
SECTION 725 LIGNIN SULFONATE
725.1 LIGNIN SULFONATE. Lignin Sulfonate shall be the residue produced by the acid-sulfite pulping of wood. The base cation shall be ammonium, calcium or sodium. The lignin sulfonate shall be supplied as a water solution.
The lignin sulfonate shall be miscible with an equal volume of water. The undiluted material shall meet the following requirements:
pH (AASHTO T 200) 4.5 minimum Viscosity at 77 degrees F (AASHTO T 202) 20.0 poise maximum Total Solids (TAPPI T 629-M53) 48 percent minimum
The solids shall meet the following requirements:
Lignin Sulfonate 50 percent minimum Reducing Sugars 25 percent maximum
725.2 TEMPERATURE. The temperature of the material from the time it is loaded until it is applied on the road shall not exceed 140 degrees Fahrenheit. The temperature of the material at application shall be between 40 and 140 degrees Fahrenheit.
725.3 CERTIFICATION. When each load of Lignin Sulfonate is delivered, the Contractor shall furnish the Engineer with a completed
Certificate of Compliance conforming to the format below (see Figure 725-1). A separate Certificate of Compliance will not be required if the Bill of Lading contains the required information.
FIGURE 725-1 (sample) CERTIFICATE OF COMPLIANCE
Consignee Destination
Date Net Weight
Identification (Truck No., Car No., Etc.)
Based Cation Brand Name
This shipment of Lignin Sulfonate identifed above and covered by this Certificate of Compliance, complies with Forest Service Standard Specifications as modified by Special Project Specifications applicable to this project.
Producer
Signed
Producers Representative
R5 725-1 September 1982
Frenchman Stewardship Solicitation No.: 129JGP18R0069 Page 24 of 27
SPECIAL PROJECT SPECIFICATION
SECTION 730 MAGNESIUM CHLORIDE
730.1 MAGNESIUM CHLORIDE. Magnesium Chloride shall be a brine consisting of water and Magnesium Chloride. The chemical analysis* shall meet the following requirements:
Chemical Percent by Weight of Brine
Magnesium 7.0 Minimum
Chloride 20.0 Minimum
Sulfate 4.3 Maximum
Nitrate 5.0 Maximum
The pH shall be between 4.5 and 10.0. The solids shall be at least 30 percent by weight of the brine.
730.2 TEMPERATURE. The temperature of the material shall be 40 degrees Fahrenheit or above when it is applied.
730.3 CERTIFICATION. When each load of Magnesium Chloride is delivered, the Contractor shall furnish the Engineer with a completed Certificate of Compliance conforming to the format as shown in Figure 730-1. a separate copy of test procedures* are available upon request from USDA Forest Service, Pleasant Hill Engineering Center, 2245 Morello Avenue, Pleasant Hill, CA 94523.
FIGURE 30-1 (sample) CERTIFICATE OF COMPLIANCE
Consignee Destination
Date Net Weight
Identification (Truck No., Car No., Etc.)
Based Cation Brand Name
This shipment of Magnesium Chloride identified above and covered by this Certificate of Compliance, complies with Forest Service Standard Specifications as modified by Special Project Specifications applicable to this project.
Producer _
Signed Producers Representative
R5 March 1984
K-F 3.5# – ROAD AND WATER SUPPLY USE. (5/2008) National Forest water supply locations, access, method of filling trucks, period of water availability and procedures designed to maintain water quality at each location shall be agreed in advance of use. Such use shall at no time reduce water supplies to the level that further use may be detrimental to aquatic resources or other established use. Waterholes and other improvements relating to said water supplies shall be put into condition, prior to expected seasonal periods of precipitation or runoff, to avoid resource damage.
Damage to resources at such locations caused by Purchaser's Operations, other than fire suppression activities, shall be repaired by Purchaser in a timely and agreed manner to the extent practicable to restore and prevent further resource damage.
Unless otherwise agreed, Purchaser’s use of roads and other water supply requirements shall conform to the following table.
SPECIFICATIONS PURSUANT TO K-F 3.5# - REQUIREMENTS OF ROAD AND WATER SUPPLY USE
Load Limitations
Purchaser shall notify Forest Service in writing of the planned size and load distribution for equipment which exceeds the State of California Vehicle Code legal size and weight, and the National Forest System roads to be used. Such notice may be part of plan of operation under BT6.311. Within l5 days after receipt of the written notice Forest Service shall notify Purchaser in writing of any regulations or restrictions that may be needed to protect National Forest Transportation Facilities.
A written permit shall be required for moving any vehicle which is in excess of the established legal size and weight which is not listed in the above plan, except as may be authorized in prior written agreements.
Existing Non-National Forest System Roads
Roads not shown on Sale Area Map may be used as Temporary Roads if there is agreement before use is started.
Snow Removal
If Purchaser removes snow from roads, such work shall be done with Forest Service approval and in a manner that will protect roads and adjacent resources.
Snow berms shall be removed or placed to avoid accumulation of melt water on the road and prevent water concentration on erosive slopes or soils.
Snow must not be removed to the road surface. A minimum < 6 > inch snow depth must be left to protect the roadway. If the road surface is damaged, Purchaser shall replace lost surface material and repair structures damaged in blading operations prior to hauling, unless climatic conditions prevent necessary work from being accomplished or as otherwise agreed in writing.
Single lane roads shall be plowed full width including turnouts.
In event double lane roads are not plowed to full width, warning signs shall be required and plowing shall be no less than single lane (12 feet) with intervisible turnouts.
Water Supply Deposits
If Purchaser utilizes the water site located < N/A >, for any listed activity, Purchaser shall make deposit with Forest Service for that activity at the time and in the amount shown in the Water Supply Deposit Schedule table below.
WATER SUPPLY DEPOSIT SCHEDULE
Activity Unit of Payment
Unit Cost Total Cost Time of Payment
Surface Replacement Deposits
Purchaser shall make Required Deposits for deferred surface replacement (16 U.S.C. 537) for use of existing surfaced roads.
If applicable, such deposits shall be based upon the volume and distance hauled on the roads and at the applicable rates listed in the table below titled Surface Replacement Deposit Schedule.
If Purchaser uses surfaced roads under jurisdiction of Forest Service other than those listed, Forest Service may establish applicable rates for such surfaced roads.
SURFACE REPLACEMENT DEPOSIT SCHEDULE
Road No. From To Miles Rate
25N11 CA284 24N52 1.5 $0.55/GT
24N01 CA284 24N46X 2.4 $0.55/GT
24N76 24N01 MP 0.6 0.6 $0.55/GT
24N78 24N01 MP 0.6 0.6 $0.55/GT
24N46X 24N01 MP 0.9 0.9 $0.55/GT
24N91 25N11 MP 0.4 0.4 $0.55/GT
24N52 25N11 MP 0.2 0.2 $0.55/GT
Sale Area Average Rate: $ 0.55/GT