2. Road Log 2.pdf
PDF 79 KB Posted
- Attached to
- 15N01 Pavement Repair Project Federal contract opportunity
- Solicitation number
- 129AC719R0001
About this file
Road Log
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15N01_Pavement_Repair_Questions_and_Answers_2-1-19.pdf | ||
| 15N01_Pavement_Repair_Questions_and_Answers_1-30-19.pdf | ||
| Amendment_002_129AC719R0001.pdf | ||
| A1_129AC719R0001_final.pdf | ||
| 4. PAL Fire Plan.pdf | ||
| 15N01_Solcitation_129AC719R0001.pdf | ||
| 5. CA4, mod 15, 11022018.pdf | ||
| 3. Drawings 2.pdf | ||
| 1. FSSS.pdf | ||
| 6.SF24 Bid Bond.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15N01 Road Repair
Road Log - GO Road - Orleans Side
MP 0.0: Intersection with Highway 96 near Orleans
MP 3.39: Reinforced dig out 3‘deep, 140’ x 24’ asphalt and 4’ shoulder OPTION 4
MP 4.29: Reinforced Dig out 3’ deep, 80’ x 24’ asphalt and 2” shoulder OPTION 2
MP 4.35: Reinforced dig out 4’ deep, 75’ x 7’ asphalt and 2’ shoulder OPTION 3
MP 4.36: Reinforced dig out 4’ deep, 62’ x 24’ asphalt and 2’ shoulder OPTION 1
MP 5.31: Reinforced dig out 5’ deep, 175’ x 24’ asphalt and 5’ shoulder. Will need borrow to bring shoulder back up to grade.
MP 5.50: Reinforced dig out 3’ deep, 75’ x 8’ asphalt and 2’ shoulder.
MP 5.54: Reinforced dig out 3’ deep, 50’ x 6’ asphalt and 4’ shoulder.
MP 5.79: Reinforced dig out 3’ deep, 300’ x 24’ and 2’ shoulder. Culvert and underdrain in area.
MP 5.92: Reinforced dig out 3’ deep, 80’x 27’ and 2’ shoulder.
MP 6.38: 12N20 intersection left
MP 6.89: Reinforced dig out 3’ deep, 100’ x 24’ and 2’ shoulder.
MP 10.00: 12N16 intersection
MP 10.92: Reinforced dig out 3’ deep, 65’ x 8’ asphalt and 8’ shoulder. X-out excavation and replace with select borrow.
MP 11.18: Reinforced dig out 4’ deep, 100’ x 24’ and 2’ shoulder. X-out excavation and replace with select borrow.
MP 11.67: Reinforced dig out 3’ deep, 110’ x 24’ and 3’ shoulder.
MP 11.73: Reinforced dig out 3’ deep, 40’ x 24’ and 2’ shoulder. (Bummer Cheeto)
MP 13.74: Reinforced dig out 3’ deep, 10’ x 24’ and 3’ shoulder.
MP 14.09: 12N23 intersection
MP 14.4: Reinforced dig out 4’ deep, 113’ x 15’ and 2’ shoulder. - End of project work.
Misc. Work Items considered incidental to accomplishing the items of work: Brushing, slide and sluff removal, and hazard tree removal.