15N01_Solcitation_129AC719R0001.pdf

PDF 651 KB Posted

Attached to
15N01 Pavement Repair Project Federal contract opportunity
Solicitation number
129AC719R0001
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to 15N01 Pavement Repair Project, newest first.
File Type Posted
15N01_Pavement_Repair_Questions_and_Answers_2-1-19.pdf PDF
15N01_Pavement_Repair_Questions_and_Answers_1-30-19.pdf PDF
Amendment_002_129AC719R0001.pdf PDF
A1_129AC719R0001_final.pdf PDF
4. PAL Fire Plan.pdf PDF
5. CA4, mod 15, 11022018.pdf PDF
2. Road Log 2.pdf PDF
3. Drawings 2.pdf PDF
1. FSSS.pdf PDF
6.SF24 Bid Bond.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

941339

USDA FOREST SERVICE

R5 NO-CAL ACQ SERVICE AREA NCASA

3644 AVTECH PARKWAY SUITE 180

REDDING CA 96002

9AC7

PAUL WOOD

Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002

PAUL WOOD 530-226-2445

1x 12/03/2018

129AC719R0001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

15N01 PAVEMENT REPAIR PROJECT

SIX RIVERS NATIONAL FOREST

NAICS: 237310

Size Standard: $36.5 Million

Set Aside: 100% Total Small Business

Government estimate between $250,000 - $500,000

DUNS: _______________________________

Email: ______________________________

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 0 calendar days and complete it within ________________ ________________ calendar days after receiving

See F.2

01/02/2019

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

R5 NO-CAL ACQ SERVICE AREA NCASA

3644 AVTECH PARKWAY SUITE 180

REDDING CA 96002

9AC7

PAUL M. WOOD

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

129AC719R0001

Delivery: 11/15/2019

Delivery Location Code: 9A47

SIX RIVERS NATIONAL FOREST

1330 BAYSHORE WAY

EUREKA CA 95501 US

FOB: Destination

001 15N01 Pavement Repair Project

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

15N01 Road Repair Page 4 of 37

129AC719R0001

TABLE OF CONTENTS

PART I - SCHEDULE OF ITEMS

SECTION B - SCHEDULE OF ITEMS

B.1 Option for Increased Quantity—Separately Priced Line Item (FAR 52.217-7) (Mar 1989)

B.2 Note Regarding Bond Premiums

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.6 MATERIAL CERTIFICATIONS AND TESTING REPORTS

C.7 Project Specifications ........................................................................................... Error! Bookmark not defined.

C.9 Attachments to Statement of Work/Specifications, AGAR 452.211-73 (FEB 1988)

C.10 Special Project Specification List

SECTION D – GOVERNMENT FURNISHED PROPERTY

SECTION E - INSPECTION AND ACCEPTANCE

E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)

E.2 Inspection of Construction FAR 52.246-12 (AUG 1996)

SECTION F - DELIVERIES OR PERFORMANCE

F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)

F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)

F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)

H.2 Invoice Processing Platform (IPP)

PART II – CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)

I.2 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR 52.223-2 (SEP 2013)

I.3 Buy American—Construction Materials, FAR 52.225-9 (MAY 2014)

I.4 Bid Guarantee, FAR 52.228-1 (SEP 1996)

PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

J.1 Attachments to Statements of Work/Specifications, AGAR 452.211-73 (FEB 1988)

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

15N01 Road Repair Page 5 of 37

K.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)

K.2 Annual Representations and Certifications, FAR 52.204-8 (JAN 2018)

K.3 Certification Regarding Responsibility Matters, FAR 52.209-5 (OCT 2015)

K.4 Information Regarding Responsibility Matters, FAR 52.209-7 (JUL 2013)

K.5 Preparation of Proposals—Construction, FAR 52.236-28 (OCT 1997)

K.6 Size Standard and NAICS Code Information, AGAR 452.219-70 (SEP 2001)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L.1 Inquiries AGAR 452.204-70 (FEB 1988)

L.2 System for Award Management, FAR 52.204-7 (OCT 2016)

L.3 Instructions to Offerors—Competitive Acquisition, FAR 52.215-1 (JAN 2017)

L.4 Type of Contract, FAR 52.216-1 (APR 1984)

L.5 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction, FAR

52.222-23 (FEB 1999)

L.6 Notice of Buy American Act Requirement - Construction Materials, FAR 52.225-10 (MAY 2014)

L.7 Service of Protest, FAR 52.233-2 (SEP 2006)

L.8 Preparation of Proposals – Construction, FAR 52.236-28 (OCT 1997)

L.9 Instructions for the Preparation of Technical and Business Proposals

L.10 Site Visit (Construction) FAR 52.236-27 (FEB 1995)

SECTION M - EVALUATION FACTORS FOR AWARD

15N01 Road Repair Page 6 of 37

PART I - SCHEDULE OF ITEMS

SECTION B - Schedule of Items

15N01 Road Repair

Six Rivers National Forest

BASE

Line Item Item Unit Est.

Qty. Unit Rate Total Price 15101 Mobilization LS 1 $_________ $_________ 41301 Asphalt Milling - Full Depth AC SY 2,889 $_________ $_________ 20403 Subexcavation CY 3,793 $_________ $_________ 20407 Select Borrow Excavation CY 541 $_________ $_________ 20411 Embankment Construction CY 3,793 $_________ $_________ 20701 Earthwork Geotextile, Type Geogrid Biaxle SY 11,379 $_________ $_________ 30802 Roadway Aggregagte, Compaction Method 2 TON 987 $_________ $_________ 40401 Minor Hot Asphalt Concrete TON 488 $_________ $_________ 62502 Seeding, Dry Method SY 598 $_________ $_________ 62901 Erosion Control Mat, Type 4 SY 598 $_________ $_________

TOTAL: $________________

OPTION 1- MP 4.36

Item Item Unit Est.

Qty. Unit Rate Total Price

41301 Asphalt Milling - Full Depth AC SY 166 $_________ $_________ 20403 Subexcavation CY 239 $_________ $_________ 20411 Embankment Construction CY 239 $_________ $_________ 20701 Earthwork Geotextile, Type Geogrid Biaxle SY 717 $_________ $_________ 30802 Roadway Aggregagte, Compaction Method 2 TON 53 $_________ $_________ 40401 Minor Hot Asphalt Concrete TON 28 $_________ $_________ 62502 Seeding, Dry Method SY 35 $_________ $_________ 62901 Erosion Control Mat, Type 4 SY 35 $_________ $_________

TOTAL: $________________

OPTION 2- MP 4.29

Line Item Item Unit Est.

Qty. Unit Rate Total Price

41301 Asphalt Milling - Full Depth AC SY 214 $_________ $_________ 20403 Subexcavation CY 232 $_________ $_________ 20411 Embankment Construction CY 232 $_________ $_________ 20701 Earthwork Geotextile, Type Geogrid Biaxle SY 694 $_________ $_________ 30802 Roadway Aggregagte, Compaction Method 2 TON 68 $_________ $_________ 40401 Minor Hot Asphalt Concrete TON 36 $_________ $_________ 62502 Seeding, Dry Method SY 36 $_________ $_________ 62901 Erosion Control Mat, Type 4 SY 36 $_________ $_________

15N01 Road Repair Page 7 of 37

OPTION 3- MP 4.35

Item Item Unit Est.

Qty. Unit Rate Total Price

41301 Asphalt Milling - Full Depth AC SY 59 20403 Subexcavation CY 100 $_________ $_________ 20411 Embankment Construction CY 100 $_________ $_________ 20701 Earthwork Geotextile, Type Geogrid Biaxle SY 300 $_________ $_________ 30802 Roadway Aggregagte, Compaction Method 2 TON 28 $_________ $_________ 40401 Minor Hot Asphalt Concrete TON 10 $_________ $_________ 62502 Seeding, Dry Method SY 42 $_________ $_________ 62901 Erosion Control Mat, Type 4 SY 42 $_________ $_________

OPTION4- MP 5.64

Line Item Item Unit Est.

Qty. Unit Rate Total Price

41301 Asphalt Milling - Full Depth AC SY 134 20403 Subexcavation CY 145 $_________ $_________ 20411 Embankment Construction CY 145 $_________ $_________ 20701 Earthwork Geotextile, Type Geogrid Biaxle SY 434 $_________ $_________ 30802 Roadway Aggregagte, Compaction Method 2 TON 43 $_________ $_________ 40401 Minor Hot Asphalt Concrete TON 23 $_________ $_________ 62502 Seeding, Dry Method SY 23 $_________ $_________ 62901 Erosion Control Mat, Type 4 SY 23 $_________ $_________

OPTION 5- MP 3.39

Item Item Unit Est.

Qty. Unit Rate Total Price

41301 Asphalt Milling - Full Depth AC SY 374 $_________ $_________ 20403 Subexcavation CY 436 $_________ $_________ 20411 Embankment Construction CY 436 $_________ $_________ 20701 Earthwork Geotextile, Type Geogrid Biaxle SY 1,307 $_________ $_________ 30802 Roadway Aggregagte, Compaction Method 2 TON 137 $_________ $_________ 40401 Minor Hot Asphalt Concrete TON 63 $_________ $_________ 62502 Seeding, Dry Method SY 63 $_________ $_________ 62901 Erosion Control Mat, Type 4 SY 63 $_________ $_________

15N01 Road Repair Page 8 of 37

NOTE: Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.

B.1 Option for Increased Quantity—Separately Priced Line Item (FAR 52.217-7) (Mar 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor by October 1, 2019. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

B.2 Note Regarding Bond Premiums

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted

15N01 Road Repair Page 9 of 37

SECTION C - Description/Specifications/Statement of Work

C.1 SCOPE OF WORK

The purpose of this project is to repair National Forest System Road 15N01 (Forest Route 15, also known as the GO Road). The primary work includes repairing failed pavement sections by removing the pavement and subgrade and rebuilding with a reinforced embankment (reinforced deep patches). The primary work items include removal of asphalt pavement, excavation of the subgrade, embankment construction, select borrow excavation, placement of geogrid for embankment reinforcement, placement of roadway aggregate, placement of hot asphalt concrete, and erosion control. The Schedule of Items and the Plan sheets contain the full listing of included work.

C.2 LOCATION OF PROJECT

The project area is located on the Orleans District of the Six Rivers National Forest, beginning in Township11 North, Range 5 East, Section 36, and ending in T14N, R4E, and Section 26 along the Humboldt Meridian. The project lies within Humboldt and Siskiyou Counties near the town of Orleans, California.

C.3 SPECIFICATIONS APPLICABLE TO THIS INDIVIDUAL PROJECT

[ ] FHWA Standard Specification 2014 applies [X] FHWA Standard Specification 2003 US Customary applies

The attached “List of Specifications” and “Supplemental Specifications” apply. All specifications not included in the specification listing, but referenced by listed specifications, are applicable.

C.4 PRODUCTS SAMPLES AND/OR SUBMITTALS

The following submittals are required for this project:

Title Referenced by Specification No Time of Government Approval After Submittal

Erosion control plan 157.03a, Landscape Preservation 14 days Hazardous spill plan 107.10 14 days Fire Plan Fire protection and suppression 14 days Construction Schedule FAR 52.236-15 14 days Safety Plan FAR 52.236-13 14 days Traffic control Plan 156.00 14 days

C.5 MATERIAL CERTIFICATIONS AND TESTING REPORT

The following material certifications and/or testing reports shall be submitted on this project:

Title Referenced by Specification No

Time of Government Approval After Submittal

Aggregate Surface

703.05 14 days Geotextile 714.01(b) 14 days

15N01 Road Repair Page 10 of 37

C.6 ERRATA

The words ". . . or equal", ". . .or approved equal" and ". . .equivalent to" when referring to brand name items are hereby deleted in their entirety from this solicitation.

C.7 Attachments to Statement of Work/Specifications, AGAR 452.211-73 (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made a part of this solicitation and any resultant contract.

C.8 Special Project Specification List

The special project specifications applicable to this solicitation are in Section J. as a separate attachment.

See Table of Contents at front of special project specifications for list of included special project specifications.

15N01 Road Repair Page 11 of 37

SECTION D – Government Furnished Property

There are no specifications in this section.

SECTION E - Inspection and Acceptance

E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the

15N01 Road Repair Page 12 of 37 examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

E.2 Inspection of Construction

Government inspections are for the purpose of satisfying the Government that the supplies and/or services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contractor (or designated representative) is encouraged to be present to observe inspections

SECTION F - Deliveries or Performance

F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html

Variation in Estimated Quantity, FAR 52.211-18 (APR 1984) Suspension of Work, FAR 52.242-14 (APR 1984)

F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 11/15/2019.

Estimated start date is August 5th, 2019.

F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

http://www.acquisition.gov/far/ http://www.usda.gov/procurement/policy/agar.html

15N01 Road Repair Page 13 of 37

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

SECTION G - Contract Administration Data

G.1 Post Award Conference, AGAR 452.215-73 (NOV 1996)

A post award conference with the successful offeror may be required. The conference will be held at a mutually agreeable time and location.

SECTION H - Special Contract Requirements

H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)

(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.

(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

H.2 Invoice Processing Platform (IPP)

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must register and submit invoices via IPP. All invoices shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website https://www.ipp.gov/index.htm.

Vendors register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

15N01 Road Repair Page 14 of 37

PART II – CONTRACT CLAUSES

SECTION I - Contract Clauses

I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATIONS (FAR)

52.202-1 Definitions. (NOV 2013) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant against Contingent Fees. (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (May 2011) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.219-6 Total Small Business Set-Aside (NOV 2011) 52.219-14 Limitations on Subcontracting. (JAN 2017) 52.219-28 Post-Award Small Business Program Representations (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation (MAR 2018) 52.222-5 Construction Wage Rate - Secondary Site of the Work. (MAY 2014) 52.222-6 Construction Wage Rate Requirements. (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Wage Rate Requirements and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html

15N01 Road Repair Page 15 of 37

52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-18 Encouraging Contractor Policies to Ban Text (AUG 2011)

Messaging While Driving.

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets. (AUG 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.228-15 Performance and Payment Bonds - Construction. (OCT 2010) 52.229-3 Federal, State, and Local Taxes. (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-17 Interest. (MAY 2014) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management. (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes. (MAY 2014) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR

1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.244-6 Subcontracts for Commercial Items. (OCY 2018) 52.246-21 Warranty of Construction. (MAR 1994) 52.248-3 Value Engineering - Construction. (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991)

15N01 Road Repair Page 16 of 37

AGRICULTURE ACQUISITION REGULATION

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 452.236-71 Prohibition against the Use of Lead-Based Paint. (NOV 1996) 452.236-72 Use of Premises. (NOV 1996) 452.236-73 Archaeological or Historic Sites. (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) 452.236-76 Samples and Certificates. (FEB 1988)

I.2 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR

52.223-2 (SEP 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

I.3 Buy American—Construction Materials, FAR 52.225-9 (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of http://www.biopreferred.gov/ http://www.sam.gov/ http://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

15N01 Road Repair Page 17 of 37 those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE

[Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123

15N01 Road Repair Page 18 of 37

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

I.4 Bid Guarantee, FAR 52.228-1 (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds -

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any

15N01 Road Repair Page 19 of 37 necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.5 Order of Precedence—Uniform Contract Format, FAR 52.215-8 (1997) Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

I.6 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997), FAR 52.228-5

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective—

(1) For such period as the laws of the State in which this contract is to be performed prescribe; or

(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

(d) The Contractor shall continuously insure the Project Area with the minimum following insurance coverage:

Bodily Injury or Death $1,000,000 each person $1,000,000 each occurrence Property and Product Damage $1,000,000 each occurrence $1,000,000 aggregate Fire Insurance 90% of the full insurable value of all insurable components

15N01 Road Repair Page 20 of 37

PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - List of Documents, Exhibits, and Other Attachments

J.1 Attachments to Statements of Work/Specifications, AGAR 452.211-73 (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

Attachment No. Description 1 Special Project Specifications

2 Maps & Drawings

3 Fire Plan

4 General Decision Wage Determination

5 SF-24, Bid Bond Form

15N01 Road Repair Page 21 of 37

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K - Representations, Certifications, and Other Statements of Offerors

K.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/ www.usda.gov/procurement/policy/agar.html

FAR 52.223-1 Biobased Product Certification (MAY 2012) FAR 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications (AUG 2018)

K.2 Annual Representations and Certifications, FAR 52.204-8 (JAN 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.

(2) The small business size standard is $36.5 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

□ (i) Paragraph (d) applies.

□ (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;

or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137583 https://www.acquisition.gov/sites/default/files/current/far/html/FARTOCP13.html#wp271421 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137684 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1150648 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137777 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1149919

15N01 Road Repair Page 22 of 37

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(vii) 52.209-5, Certification Regarding Responsibility Matters.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.