A11_QAmemo12970224R0007_3Jul2024.pdf

PDF 302 KB Posted

Attached to
Shasta-Trinity National Forest Salt Fire Road Repair
Solicitation number
12970224R0007
Issued by

About this file

This document is a Question & Answer (Q&A) Memorandum related to Request for Proposal (RFP) 12970224R0007 for the Shasta-Trinity National Forest Salt Fire Road Repair project. The project involves approximately 24 miles of road repair work including asphalt pulverizing and paving, double chip seal, and road reconditioning. The project is set aside 100% for Small Business entities, with an estimated project magnitude between $1,000,000 and $5,000,000. The Q&A addresses questions about the closure of Gregory Creek Campground during construction, the need for a Quality Control Manager, hauling requirements, and the need for a test strip during chip sealing. It also provides information on the location of water drafting sites. The contract is being procured by the United States Forest Service (USFS) in the Southwest Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES FOREST SERVICE

PROCUREMENT & PROPERTY SERVICES

SPECIALIZED PROJECT OPERATIONS CENTER – SOUTHWEST REGION

3 July 2024

MEMORANDUM FOR RFP 12970224R0007

FROM USFS PPS SPOC SW

SUBJECT: RFP 12970224R0007 Questions & Answers

1. Question: “Is Gregory Creek Campground going to be closed during construction?”

Answer: “Yes. This campground is closed most of the time and is only open when a large group reserves it.”

2. Question: “Is a Quality Control Manager (QCM) required on site at all times?”

Answer: “No. A QCM will only need to be on site during critical phases of the contract such as during subgrade compaction, paving, etc.”

3. Question: “Are buggy transfer trucks needed for hauling over 1000 tons?”

Answer: “No. Due to the nature of the work, multiple trucks such as truck-n-transfers are usually used to haul materials.”

4. Question: “Is a test strip going to be required during the chip sealing portion of the project?”

Answer: “Yes. This is where we will agree to the spread rates of oil and chips for the whole chip seal project. Good test strips can remain in place.”

5. Question: “Where are all the water drafting sites located?”

Answer: “Please refer to the Salt Fire Water Sources Map (Attachment 4: A10_1-12970224R0007- Att4-WaterDraftingSites) in the solicitation package.”