SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
950578
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DR
VALLEJO CA 94592-1110
91S8
DANIEL LARA 707-562-9165
1x 04/16/2019
1291U419R0002
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 453 calendar days and complete it within ________________ ________________ calendar days after receiving
05/17/2019
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DR
VALLEJO CA 94592-1110
91S8
DINDO L. LAXAMANA
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 55
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1291U419R0002
CNF 2019 Laguna Campground Improvements;
Demolition and site clearing. New vault toilet buildings, water system, concrete, accessibility, wood barriers, fencing, signs, asphalt pavement and other roadway improvements.
Delivery: 07/01/2019
Delivery Location Code: 91U4
CLEVELAND NATIONAL FOREST
10845 RANCHO BERNADO RD STE 200
SAN DIEGO CA 92127 US
FOB: Destination
001 CNF 2019 Laguna Campground Improvements;
Demolition and site clearing. Install new vault toilet buildings, water system, concrete, accessibility, wood barriers, fencing, signs, asphalt pavement and other roadway improvements.
Site Visit is scheduled for April 24, 2019 @ 1:00
PM.
Please submit all questions by May 9, 2019 @ 3:30
PM.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
PART I – THE SCHEDULE
SECTION B – PRICES AND COST SCHEDULE OF ITEMS
Laguna Campground Improvements Cleveland National Forest
San Diego County, California
The Offeror must submit a price on all items.
NOTE: If Offeror does not intend to charge for a bid Item, a price of "0" or "NO COST" should be shown.
SCHEDULE OF ITEMS
Type Specification Description Msrmt Unit Qty Unit Price Total Price
English Quantities
BASE BID
01 71 13 Mobilization Of All Work JOB LSQ 1 $ $
01 32 23 Survey and Layout Data JOB LSQ 1 $ $
02 41 00 Demolition
A. Removal and Disposal of Wood Barrier Posts (~2000) JOB LSQ 1 $ $ B. Removal of Hose Bibs and concrete bases (~12) JOB LSQ 1 $ $ C. Removal and Disposal - 4 Unit Vault AQ EA 4 $ $ D. Removal and Disposal - 2 Unit Vault AQ EA 2 $ $ E. Removal and Disposal - 2 Unit Vault/Flush AQ EA 1 $ $ F. Removal and Disposal Vault and Tables at Choke Cherry
AQ EA 1 $ $
JOB LSQ 1 $ $G. Demo Misc; fencing, concrete, aspahlt, demo sites 3, 83, 91, 92, Signs
03 30 00 Cast In Place Concrete DQ CY 115 $ $
10 14 53 Traffic Signs
A. Laguna & El Prado Campground Sign, RS-3 AQ EA 1 $ $
B. El Prado Group Campground Sign RS-1 AQ EA 1 $ $ C. Accessible Sign and metal breakaway post AQ EA 2 $ $ D. Speed Hump Sign w/ wood post AQ EA 12 $ $
31 20 00 Earth Moving
A. Exvacation and placement DQ CY 950 $ $ B. Furnish and Install Fiber Rolls JOB LSQ 1 $ $ C. Furnish and Install Caltrans Class II Aggregate Base 3" Compacted Thickness DQ CY 2,725 $ $
D. Rip Rap - Class 2 JOB LSQ 1 $ $ E. Erosion Control Blanket JOB LSQ 1 $ $ F. Geotextile JOB LSQ 1 $ $ G. Excess Haul Material JOB LSQ 1 $ $ H. Culverts JOB LSQ 1 $ $
I. Recondition Existing Roadbed and Spurs. Pulverize, DQ SF 220,000 $ $ Crush & Mix with Subgrade
31 10 00 Site Clearing, including brsuh, trees, stumps and log removal JOB LSQ 1 $ $
(trees ~24, stumps ~17, logs ~75)
31 20 01 Archaeological Monitor
JOB LSQ 1 $ $
32 10 00 Bases, Ballasts, and Paving
A. Pavement Markings, Color: Blue JOB LSQ 1 $ $ B. Pavement Markings, Color: White JOB LSQ 1 $ $ C. Furnish and Install Speed Humps JOB LSQ 1 $ $ D. Furnish and Install Asphalt Concrete Pavement, Caltrans 1/2 inch Max, Medium, Type B 64-16, 2" compacted thickness
DQ TON 3,700 $ $
32 30 00 Site Improvements
A. Installation of RomTec Vault Toilet Building 4-unit, 1 each JOB LSQ 1 $ $
B. Installation of RomTec Vault Toilet Building 2-unit w/storage 1 each JOB LSQ 1
C. Installation of RomTec Vault Toilet Building 2-unit, 5 each JOB LSQ 1 $ $
D. Furnish and Install Wood Barriers JOB LSQ 1 $ $
E. Furish and Install Wood Fencing DQ LF 3800 $ $ F. Furnish and Install Fee Station ( laguna & burnt rancheria) AQ EA 2 $ $
G. Carsonite Markers AQ EA 48 $ $
H. Bulletin Board- 4 panels with posts AQ EA 1 $ $
I. Gate Signs and Reflectors JOB LSQ 1 $ $
32 38 13 Metal Bollards AQ EA 6 $ $
33 11 00 A. Water Utility Distribution System, Furnish and Install Schedule 40 Waterline DQ LF 5,100 $ $
B. Valve & Valve Boxes JOB LSQ 1 $ $ C. Hose Bibbs, Hydrants splash gurads and p-drains JOB LSQ 1 $ $ D. Relocate El Prado Campground Shut-off and replace valve box. Install new schedule 40 waterline to match existing.
JOB LSQ 1 $ $
E. Connection at Pumphouse Repairs JOB LSQ 1 $ $
33 36 00 Septic System - Tank Replacement Existing Host Sites #1 JOB LSQ 1 $ $
Base Bid Total $
OPTION ITEMS
Additive 1 - Host Site
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
01 32 23 Construction Staking
JOB LSQ 1 $ $
03 30 00 Cast In Place Concrete
DQ CY 19 $ $
26 00 00 General Electrical Service and Distribution
JOB LSQ 1 $ $
31 20 00 Earth Moving
A. Excavation & Placement
DQ CY 190 $ $
B. Aggregate Base
DQ CY 31 $ $
C. Pressure Treated Timber Board
JOB LSQ 1 $ $
31 10 00 Site Clearing (~1 stump, ~2 trees, ~4 logs) JOB LSQ 1 $ $
33 11 00 A. Valve & Valve Boxes
AQ EA 1 $ $
B. Hose Bib
AQ EA 1 $ $
C. Water Distribution System, Furnish and Install 1" Sch
JOB LSQ 1 $ $
Waterline 33 36 00 New Septic System
JOB LSQ 1 $ $
Additive 1 Total $
Additive 2 - South End Toilet Bldg and Site Work
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
02 41 00 Demo Existing Vault Building JOB LSQ 1 $ $
03 30 00 Concrete Walkway DQ CY 8 $ $
32 30 00 A. Furnish Romtec Vault 2-unit Building JOB LSQ 1 $ $
B. Installation of RomTec Vault 2-unit Building JOB LSQ 1 $ $ C. Retaining Wall with Stone Veneer JOB LSQ 1 $ $
Additive 2 Total $
Additive 3 - Concrete Dumpster Pads
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
32 20 00 Construct Dumpster DQ EA 5 $ $
Additive 3 Total $
Additive 4 - Roadway Gates
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
02 41 00 Removal and Disposal of Existing Gates AQ EA 2 $ $
32 30 00 Furish and Install Roadway Gates AQ EA 4 $ $
Additive 4 Total $
Additive 5 - Tent Pads
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
32 30 00 Tent Pads AQ EA 8 $ $
Additive 5 Total $
Additive 6 - Recycle and Trash Containers
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
32 30 00 A. Furnish and Install Recyle Containers AQ EA 5 $ $
B. Furnish and Install Trash Containers AQ EA 3 $ $
Additive 6 Total $
Additive 7 - Picnic Tables Sites 4 - 50
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
02 41 00 Demo and Remove Existing Picnic Tables AQ EA 45 $ $
32 30 00 A. Furnish and Install T-shape Table Legs AQ EA 46 $ $ B. Furnish and Install New Wood Tops and Wood Benches AQ EA 230 $ $
Additive 7 Total $
Additive 8 - Picnic Tables Sites 51- 104
07 71 13 Mobilization Of All Work JOB LSQ 1 $ $
02 41 00 Demo and Remove Existing Picnic Tables AQ EA 55 $ $
32 30 00 A. Furnish and Install T-shape Table Legs AQ EA 55 $ $ B. Furnish and Install New Wood Tops and Wood Benches AQ EA 275 $ $
Additive 8 Total $
Grand Total w/Option Items $
(END OF SECTION)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF WORK
This project includes, but is not limited to the following items:
Laguna Campground:
Demolition of seven existing vault toilet buildings and once vault/flush toilet building. Demolition of existing wood barrier posts, campground signage, fencing, asphalt walkways, concrete walkways, picnic tables, hose bibbs and bases, septic tank, and clearing and grubbing.
Construction improvements include site preparation, installation of new vault toilet buildings, accessible concrete walkways, accessible camp units, concrete pad, fee tube, septic tanks, new water system, valves boxes, hose bibbs, upgrades to existing water system and repairs.
Roadways improvements include cleaning-out existing culverts, pulverize existing asphalt roadway and camp unit spurs, widen campground spurs, roadway and parking areas. Install new aggregate subbase, new asphalt pavement, speed humps, wood barrier posts, bollards, wood fencing, wheel stops, traffic signs, rip rap, geotextile material, carsonite delineator markers and pavement striping.
El Prado Group Campground:
Demolition and removal of one vault toilet building and picnic tables at Choke Cherry.
Burnt Rancheria Campground:
Demolition and removal of fee tube. Furnish and install new fee tube.
Construction elements include site work, surveying, demolition, clearing and grubbing, excavation and placement, compaction, striping, best management practices (BMP’s), aggregate base, asphalt pavement, portland cement concrete, concrete reinforcement and sampling and testing.
Additive 1:
New Host Site related items include construction staking, clearing and grubbing, excavation, compaction, finish grading, concrete slab, water, septic and electrical. Contractor is responsible for the design of the septic system and shall obtain all necessary permits from the County of San Diego.
Additive 2: Includes but is not limited to the following items of work:
Contractor shall order, purchase and install a Romtec 2-unit vault toilet building, Model #1016, Aspen Double Waterless Restroom. Related items include, demolition of existing vault toilet building, new construction staking, grading, excavation and placement, compaction, accessible concrete walkway and masonry retaining wall.
Additive 3: Includes but is not limited to the following items of work:
Construct dumpster pads AS SHOWN ON THE DRAWINGS and in accordance with specification 03 30 00 Cast-In-Place Concrete. Related Items include, construction staking, excavation and placement and compaction. Dumpster pad shall have 3” curb around 3 sides.
Additive 4: Includes but is not limited to the following items of work:
Roadway Gates shall be installed AS SHOWN ON THE DRAWINGS. Final gate posts locations shall be approved by the Contracting Officer. Related items also include demolition of existing.
Additive 5: Includes but is not limited to the following items of work:
Construct a total of 6 tent pads AS SHOWN ON THE DRAWINGS. Final tent pad locations shall be approved by the Contracting Officer.
Additive 6: Includes but is not limited to the following items of work:
Order, purchase and install recycle and trash containers AS SHOWN ON THE DRAWINGS and on the schedule of items.
Additive 7: Includes but is not limited to the following items of work:
Demo existing picnic tables at sites 4 – 50. Order, purchase and install new picnic tables for sites 4 -50.
Additive 8: Includes but is not limited to the following items of work:
Demo existing picnic tables at sites 51-104. Order, purchase and install new picnic tables for sites 51- 104.
****The Notice to Proceed is estimated to be issued on July 1, 2019.
****Total work time is 453 calendar days from the issuance of the “Notice to Proceed”.
C.2 PROJECT LOCATION
This project is located in Cleveland National Forest, San Diego County, CA.
Laguna Campground: 32° 53’35.02”N, 116° 26’ 52.31”W From San Diego travel on I-8 East for approximately 40 miles, Exit Sunrise Highway. Turn left onto Sunrise Highway (San Diego County S-1) travel for approximately 12 miles. Campground will be on the left.
Burnt Rancheria Campground: 32° 51’40.93”N, 116° 25’13.69”W From San Diego travel on I-8 East for approximately 40 miles, Exit Sunrise Highway. Turn left onto Sunrise Highway (San Diego County S-1) travel for approximately 10 miles. Campground will be on the right.
El Prado Group Campground: 32° 53’24.59”N, 116° 26’56.69”W From San Diego travel on I-8 East for approximately 40 miles, Exit Sunrise Highway. Turn left onto Sunrise Highway (San Diego County S-1) travel for approximately 12 miles. Campground will be on the left.
C.3 FOREST CONTACT
For information regarding site conditions, contact Whitney Hosseini at (858) 674-2925 between the hours of 8:00 am and 4:00 pm, Monday through Friday, except legal holidays.
C.4 PROJECT MANAGEMENT
4. 1 Contractor Management
The contractor shall appoint a Project Manager and/or engineer to coordinate all contractor activities during construction and to liaise with the Contracting Officer Representative (COR) and/or Contracting Officer (CO) and Project Engineer for the USDA Forest Service. Engineer, Electrician, Plumber, Geotechnical Engineer and Surveyor shall be licensed in the State of California. Contractor shall designate in writing an on-site superintendent to be on-site at all times that any construction activities take place and to coordinate all site work.
4.2 Quality Control
See Laguna Campground Rehab 2019 Specification Section 01 40 00, Quality Requirements, for performance and design criteria; qualifications data; report formats; permits, licenses, and certificate requirements, and testing requirements.
4.3 Environmental Protection Measures
Prepare and submit a Storm Water Pollution Prevention Plan (SWPPP) and obtain permits and approvals in accordance with Laguna Campground Rehab 2019 Specifications Section 01 57 24, Stormwater Pollution Control. Contractor shall be responsible for all fees associated with this work.
Sensitive areas are indicated on the drawings. It is the Contractor’s responsibility to be aware of these areas and avoid these areas entirely. If work shall take place in a sensitive area, the contractor shall make the least amount of disturbance in the least amount of time with equipment, tools, personnel and materials while performing work.
C.5 GENERAL INFORMATION
C.5-1 Government Furnished Property
Romtec Vault Toilet Building Materials:
One – Model #1015 Aspen Quattro Waterless Restroom w/storage (4 Unit Vault) Five – Model #1016 Aspen Double Waterless Restroom (2 Unit Vault) One – Model # 1017 Aspen Double Waterless Restroom w/storage (2 Unit)
C.5-2 Parking and Storage
The Contractor shall coordinate parking of their vehicles and temporary storage of equipment and materials with the Contracting Officer. Contractor shall have all heavy equipment washed prior to entering the project area to remove soil, seeds and plant material from noxious weeds to prevent the introduction and spread of weeds not already present on Descanso Ranger District or the Cleveland National Forest. Inspections shall be coordinated and scheduled with the Contracting Officer’s Representative.
C.6 DELIVERABLES
C.7-1 Fire Plan
See the Fire Plan for fire restrictions and requirements, emergency contact information, and fire activity levels.
C.7-2 Work Plan
The Contractor(s) shall provide the Government with two (2) copies of the Work Plan for the project prior to mobilization. This Work Plan shall include, but is not limited to, the following:
A description of how the work will be performed.
Specific exclusions/ assumptions regarding the specific work to be performed.
A listing of personnel, including subcontractor(s), working on the project.
Qualifications and experience of personnel and subcontractors.
Project specific Health & Safety Plan.
Project specific Emergency Response Plan.
Project specific Sampling and Analysis Plan.
Project specific Quality Assurance Plan.
A list of equipment proposed for use on the project.
A Project Work Schedule.
Detailed cost estimate/ cost breakdown of work to be performed that can be used for partial payments as work is completed and accepted.
C.7-3 Storm Management Plan
Contractor shall develop a Storm Water Pollution Prevention Pan (SWPPP) and include permit.
C.7-4 Construction Waste Management Plan
Contractor shall develop a proposal on how to collect, segregate, and dispose of all construction wastes and debris produced by the work of this contract. Include description of on-site reprocessing and re-use opportunities.
C.3 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED
IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.210-
3) (APR 1984)
Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:
Specification Address
ASTM Standards American Society for Testing and Materials P.O. Box C700 100 Bar Harbor Drive West Conshohocken, PA 19428-2959
(610) 832-9585 http://www.astm.org
AASHTO Standards American Association of State Highway and Transportation Officials 444 North Capitol Street, NW Suite 249 Washington, D.C., 20001
(206) 624- 5800 http://www.aashto.org
C.4 APPLICABLE SPECIFICATIONS AND MATERIAL CERTIFICATIONS
(a) Applicable Specifications:
References to CSI Specifications in the Standard Specifications refer to these specifications.
References to Specifications or CSI Specifications in these CSI Specifications refer to other CSI Specifications attached to the contract.
NOTE: Some CSI specifications and associated drawings use English system units to accommodate available commercial products.
The following codes and standards shall apply to the work in this contract:
1. The following are the Codes to be used for the project. The Contractor shall use the latest adopted building code. In the case of conflicting codes the most stringent Code shall apply.
a. National Electric Safety Code.
b. International Fire Code with County of Los Angeles amendments.
c. International Building Code.
d. Uniform Mechanical Code.
e. ASHRAE/IESNA Standard 90.1, Energy Standard For Buildings
Except Low Rise Residential Buildings.
f. Uniform Plumbing Code.
g. NFPA 101.
h. NFPA 13: Standard for the Installation of Sprinkler Systems.
i. Cal/OSHA Construction and Electrical Safety Orders including updates.
j. Stormwater Management for Federal Facilities under Section 438 of the Energy Independence and Security Act to obtain a 2009- 0009-DWQ Construction general permit, Effective start July 1, 2010.
k. American with Disabilities Act and Architectural Barriers Act Accessibility Guidelines, July 3, 2004.
http://www.astm.org/ http://www.aashto.org/
l. State of California Codes:
1) California Building Code‚ Title 24‚ Part 2 (First Printing) includes Supplements thru Jan 09.
2) California Existing Building Code‚ Title 24‚ Part
10 (First Printing).
3) California Energy Code‚ Title 24‚ Part 6 (First Printing)‚ includes Supplements thru January 10.
4) California Administrative Code‚ Title 24‚ Part 1
(First Printing)‚ includes Supplements thru January 10.
5) California Referenced Standards Code‚ Title 24‚ Part 12 (First Printing).
6) California Administrative Code, Title 24, (First Printing) including Supplements thru January 10.
7) Construction General Permit, State Water Quality Board.
2. Other Federal Requirements:
a. National Environmental Policy Act (NEPA).
b. The Forest Service prepared and submitted Environmental
Assessment documentation. Through compliance with section 106 in prior undertakings, the agency has evaluated the structures within the complex. In consultation with the California Office of Historic Preservation, it has been determined, by consensus, that no historic properties are located in the APE for the current undertaking. The Environmental Assessment Document was issued and a Decision Notice Decision Notice and Finding of No Significant Impact was filed.
c. EPA's Final Guidance on Environmentally Preferable Purchasing.
d. EPA's Comprehensive Procurement Guidelines for recovered content.
e. USDA's BioPreferred Program.
f. ENERGY STAR® & DOE Federal Energy Management
Program (FEMP)
g. Product Efficiency Recommendations.
h. Energy Policy Act of 2005 and the Energy Independence and
Security Act of 2007, Section 483, Storm water Requirements.
Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in effect on the date of the invitation to bid.
(b) DEFINITIONS
i. Administrative Authority as used in the Uniform Mechanical Code, the Uniform Plumbing Code and the National Electrical Code will be the Contracting Officer.
ii. Building Official as used in the Uniform Fire Code, International Building Code Standards will be the Contracting Officer.
(c) Product Substitution:
Any modification of other items, designs, materials, products or equipment (including
Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
(d) General Guidelines for Submittals:
Submittals are required by their corresponding specifications (basic reference & detailed requirement).
Work requiring submittals shall not begin until submittals have been approved.
Submittals shall include the following:
Date and Revision Dates.
Project Name and Contract Number.
Names of Contractor, Subcontractor, Supplier, and Manufacturers.
Field Dimensions and Relation to Adjacent Structures.
Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.
Samples:
A. Submit Samples for review of size, kind, color, pattern, and texture, and to illustrate functional and aesthetic characteristics of Product.
B. Where variation in color, pattern, or texture, or other characteristic is inherent in material or product represented, submit at least three (3) multiple units that show approximate limits of variations, or number of units indicated in individual specification Sections.
C. Field Samples: Full-size examples erected on-site to illustrate finishes, coatings, or finish materials and to establish Project standard.
Manufacturer's requirements:
Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.
Approval or Rejection Time Allowance:
Submittals will be reviewed and either approved or rejected within 10 Federal work days of their receipt by the Contracting Officer or COR.
C.5 Attachments to Statement of Work/Specifications (AGAR 452.211-73) (FEB 1988)
The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.
C.6 BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases Dust suppressant 2-cycle engine oil Absorbents
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product.
This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts.
http://www.biopreferred.gov/
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996)
E.2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
E.3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.
E.4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground.
"Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
https://www.acquisition.gov/?q=browsefar
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the project within 453 calendar days. The time stated for completion shall include final cleanup of the premises.
(END OF SECTION)
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of Notice to Proceed.
G.2 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.3 CONTRACT RELEASE
When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $
Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.
Reservations: "
G.4 Invoice Processing Platform (IPP)
Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. The one-time enrollment in IPP means a series of emails will be sent to the point of contact (POC) established in your System for Award Management (SAM) account at www.sam.gov. So, please verify that the POC’s email address is up to date in your company’s SAM account prior to starting the IPP enrollment process. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
(END OF SECTION)
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 Emergency Control (USDA 452.236-77) (JUL 1985)
Maintenance of Existing Facilities – The Contractor shall conduct his operations to minimize disruptions to the Government employees and public using the existing facilities. Operations are permissible Monday – Friday.
H.2 Use of Premises
General: During the construction period the Contractor will have full access to all construction areas. The existing Buildings and compound will continue to be used by USFS personnel and shall remain accessible to USFS staff throughout the course of construction.
Contractor storage areas are to be approved by the CO prior to the start of construction.
Provide access to and from site as required by law and by the Government:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
Sanitation: Sanitation facilities are available to use at two existing shower buildings.
Utilities: Water is available and may be used by the Contractor’s personnel at the campground.
If water at the campground needs to be shut off, water will be available at the Camp Ole Fire Station. A backflow device shall be connected prior to the contractor making their connection. And at any time the contractor may be bumped off the source for fire purposes or if the contractor is depleting water tank. In this case, contractor will be responsible for finding their own source of water.
(END OF SECTION)
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address (es):
https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform
Employees of Whistleblower Rights (APR 2014) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreement or
Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
(MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(OCT 2016)
52.204-13 System for Award Management Maintenance (OCT 2016) 52.204-22 Alternative Line Item Proposal (JAN 2017) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
(JULY 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (NOV 2016) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) http://www.dm.usda.gov/procurement/policy/agar.html
52.222-3 Convict Labor (JUNE 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation
(MAY 2014)
52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
(MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JULY 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-40 Notification of Employees Rights under the National Labor Relations Act
(DEC 2010)
52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015) 52.222-59 Compliance with Labor Laws (Executive Order 13673) (DEC 2016)
Note to 52.222-59: By a court order issued on October 24, 2016, this paragraph
(c) is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, GSA, DOD and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
52.222-60 Paycheck Transparency (Executive Order 13673) (OCT 2016) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Test Messaging While Driving
(AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance—Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds – Construction (OCT 2010)
52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-13 Notice of Progress Payments (APR 1984) 52.232-16 Progress Payments (APR 2012) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(JULY 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JULY 1995) 52.243-4 Changes (JUNE 2007) 52.244-6 Subcontracts for Commercial Items (JAN 2016) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) --
Alternate I (SEP 1996) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, Or
Removal of Improvements (APR 2012) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts
(NOV 1996)
452.236-71 Prohibition against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 452.236-77
Samples and Certificates (FEB 1988) Emergency Response (NOV 1996)
I.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED
LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option items, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days of the NTP and work start.
Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
I.3 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov .
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov , with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and http://www.biopreferred.gov/ http://www.sam.gov/
(2) Submit this report not later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
I.4 FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a) (2)).
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b) (2) and (b) (3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph
(b) (2) of this clause if the Government determines that
(i) The…