31_20_01__ArchaeologicalMonitoring_Final.pdf

PDF 424 KB Posted

Attached to
Laguna Campground Improvents Project Federal contract opportunity
Solicitation number
1291U4-19-R-0002
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Updated Archaelogical Monitoring Specification

View the file

Other files for this federal contract opportunity

Other files attached to Laguna Campground Improvents Project, newest first.
File Type Posted
1291U419R0002_Amd_0002.pdf PDF
Laguna_Campground_Site_Visit_Attendance.pdf PDF
1291U419R0002_Laguna_Campground_Amd_0001.pdf PDF
Laguna_Campground_Improvements_RFIs.pdf PDF
Laguna_Campground_AutoCAD.zip ZIP file
Drawings_and_Plans_ALL_24x36.pdf PDF
ATT_5_Past_and_Present_Performance_Questionnaire.doc DOC document
ATT_2_Project_Drawings_and_Plans.pdf PDF
ATT_3_FirePlan.pdf PDF
ATT_1_Specifications.pdf PDF
ATT_4_WD_CA190001_CA1.pdf PDF
1291U4-19-R-0002_Laguna_Campground.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019 LAGUNA CAMPGROUND REHAB

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 1

SECTION 31 20 01 - ARCHAEOLOGICAL MONITORING

PART 1 – GENERAL

1.01 SUMMARY: This work consists of performing Archaeological Survey Monitoring on Laguna

Campground Rehab project site during all contract demolition or other activities involving ground or natural feature disturbance. Work includes all personnel, equipment, supplies, transportation, tools, materials and other items necessary to perform Cultural Resource Monitoring as defined herein.

Prior to the commencement of any site work, the approved Archaeological Monitor (Monitor) shall conduct a Cultural Resource Survey in the areas of the site that are expected to be disturbed during the commencement of the project. See Contract Area map that denotes the allowed area of disturbance. At both sites a very narrow area of disturbance will be allowed due to the presence of pre-historic significance and existing improvements. Approved equipment routes, staging areas and storage areas will be designated on the ground by the Forest Heritage Resource Program Manager.

A detailed report shall be furnished to the government documenting any findings. The approved Monitor will be furnished with copies of relevant historical survey reports and letters for use on the field survey.

Project monitoring shall be performed to ensure that no prehistoric, ethnographic or historical (heritage) resources encountered within the project Contract Area are disturbed or destroyed.

1.02 DEFINITIONS AND DOCUMENTATION STANDARDS

A. Cultural resources are objects or definite locations of human activity, occupation, or use identifiable through field survey, historical documentation, or oral evidence. Cultural resources are prehistoric, historic, archaeological, or architectural sites, structures, places, or objects and traditional cultural properties (FSM 2360.5). Examples include,

• archaeological sites

• burial grounds

• sacred landscapes or features

• ceremonial areas

• traditional cultural places & landscapes

• plant, mineral, animal communities

• buildings & structures with significant tribal association

B. Isolated occurrences are one or a few lost or randomly discarded artifacts, or extremely low densities of artifacts dispersed over large areas at densities less than one item per five square meters. Isolates meet no criteria for listing on the National Register of Historic Places (NRHP).

C. Historic Property is any prehistoric or historic district, site, building, structure, or object included in, or eligible for inclusion in, the NRHP. This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria (36 CFR 800.16).

D. Session Reports: Interim project progress reports, observations, draft forms, and monitoring logs to be submitted to the government on an agreed upon schedule outlined in the Project

Monitoring Plan.

1.03 ARCHEOLOGICAL/CULTURAL RESOURCE MONITOR

A. The Monitor shall meet the Secretary of Interior Archeology and Historic Preservation

Professional Qualification Standards: https://www.nps.gov/history/local-law/arch_stnds_9.htm https://www.nps.gov/history/local-law/arch_stnds_9.htm

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 2

B. Contractors qualified Monitor shall provide a resume for Forest Service review to determine if the proposed Monitor meets the Federal Requirements (36 CFR 800) for demonstrating responsibility for historic and archeology resources and meet professional qualification standards.

C. When hiring personnel/subcontractors to perform this work, the Contractor shall keep in mind that the stability and continuity of the workforce is essential to the successful performance of the project. Any substitutions of personnel will require re-submission of a new resume and review and approval by the Forest Service prior to continuing work.

1.04 APPLICABLE REGULATIONS

Section 106 of the National Historic Preservation Act of 1966 (NHPA, 36 CFR Part 800) requires

Federal land managing agencies to take into account the effects of proposed undertakings on historic properties. The principal Federal Regulations concerning Section 106 are as follows:

Protection of Historic Properties (36 CFR part 800)

National Register of Historic Places (36 CFR part 60)

Protection of Archaeological Resources Uniform Regulations (36 CFR part 296)

Native American Graves Protection and Repatriation Regulations (36 CFR part 10, subpart B –

Human Remains, Funerary Objects, Sacred Objects, or Objects of Cultural Patrimony From

Federal or Tribal Lands)

Curation of Federally-owned and Administered Archaeological Collections (36 CFR part 79)

PART 2 – PRODUCTS – Not applicable.

PART 3 – EXECUTION

3.01 All site disturbance work will be done in the presence of the Archaeology Monitor.

3.02 All photos, digital recordings and other collections of data or artifacts must be protected as

Government Information/property. Appropriate access and safeguard measures are necessary to ensure integrity and the exclusivity of this information within the contractors possession.

3.03 Project Manager or Contract Manager: Responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the primary manager is absent shall be designated in writing to the Contracting Officer.

3.04 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the

Government shall be the sole property of the Government and may not be used for any other purpose.

This right does not abrogate any other Government rights.

3.05 Research: Prior to the beginning of field work, all Forest Service relevant archeological records will be provided to the Monitor.

3.06 Standard site mapping, photography, global positioning system (GPS) recording of sites, structures, features, artifacts and isolated occurrences is required. GIS data shall include spatial information for all survey areas, archaeological sites, and isolated occurrences, and, if identified, proposed historic district boundaries using the NAD83 datum. Report citations will use the NAD83 data set to meet state standards.

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 3

3.07 The contractor shall observe and report any discovered resources using the criteria in 36 CFR

60.4. Sites shall be considered individually and within the context of their function and setting, or, if appropriate, as contributors to a historic district. Contractor shall provide enough information in a report to provide location of a discovered feature so that it is retraceable.

3.08 No artifact collection is required or allowed.

3.09 Findings Survey Report: The contractor shall provide a report detailing any findings in accordance with Secretary of the Interior's Standards and Guidelines (48 FR 44716, as amended and annotated) https://www.nps.gov/history/local-law/arch_stnds_0.htm.

3.10 No non-Forest permanent site datum will be established in the field without express permission of the Forest Service Heritage Program Manager (HPM). Mapping site datums and reference points should be recorded with a GPS unit whose data can be differentially corrected to a position accuracy of 5 meters or less (i.e. Trimble Geoexplorer, GEO II, III, XM, Professional Garmin, etc.) using NAD 83, UTM Zone

10.

3.11 No shovel tests, unit excavation, or artifact collection will be conducted without express permission of the HPM or authorized delegate. Artifacts are photographed with scale and georeferenced coordinates. These photos are restricted data.

3.12 The Contractor shall record all new prehistoric, ethnographic, and historical (heritage) resources encountered within the Contract Area immediately surrounding the buildings to be removed.

3.13 The Government is the final word on any question pertaining to coverage, what is a site, and the boundaries of sites.

Existing Information: The entire Project Area has high sensitivity for prehistoric and historic resources.

Known prehistoric site types include lithic scatters and bed rock mortars. Historic site types include historic buildings.

IV. APPLICABLE DOCUMENTS:

Secretary of Interior’s “Standards and Guidelines for Archaeology and Historic Preservation: Professional

Qualifications Standards.” Available at http://ohp.parks.ca.gov/c. “Archaeology and Historic

Preservation: Secretary of the Interior’s Standards and Guidelines (amended). Click on the Qualifications

Standards link.

Secretary of Interior’s “Standards & Guidelines for Archaeology and Historic Preservation: Reporting

Identification Results, See: http://ohp.parks.ca.gov/ “Archaeology and Historic Preservation: Secretary of the Interior’s Standards and Guidelines (amended). Click on the Identification link for information on identification and reporting.

Archaeological Recordation Forms as specified in: Format approved by the California State Historic

Preservation Office (DPR-523). Available at http://ohp.parks.ca.gov/c . Click on the Publications and

Forms link for information on site record forms.

State of California Department of Parks & Recreation “Archaeological Resource Management Reports:

Recommended Contents and Format” (ARMR). Available at http://ohp.parks.ca.gov/c. Click on the

Publications and Forms link for information on site record forms.

https://www.nps.gov/history/local-law/arch_stnds_0.htm http://ohp.parks.ca.gov/c http://ohp.parks.ca.gov/

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 4

V. SPECIAL REQUIREMENTS - DEFINTIONS

ARR: Archaeological Reconnaissance Report

Artifacts: Any object made or modified by human activity.

Diagnostic - Prehistoric: Time sensitive or functionally specific artifacts associated with prehistoric era (pre-1850) human activity. These would include formed artifacts such as flake stone tools, projectile points, or groundstone artifacts (bowl mortars, pestles, metates, etc.)

Diagnostic - Historic: Time-sensitive or functionally specific artifacts associated with historic era

(generally post 1850, non- Native American) human activity. This may include embossed or otherwise labeled bottles or tins, bottles with pontil marks or other time sensitive attributes, ceramics with maker’s marks or other distinctive attributes, and/or artifacts associated with specific ethnic groups (Chinese, Basque, etc.)

Ethnographic Sites: Sites and/or resource procurement areas associated with historic era (ca. post-

1850) Native American use.

Feature: A modified component within a site that is the result of human activity (i.e. bedrock mortars, house-pits, fire hearths, mining tailings, or structural foundations).

Historic Sites: Historic-era artifacts occurring in sufficient quantity or complexity, and/or groupings of artifacts and historic features that are in excess of 50 years old shall be formally recorded as a site. If, during the course of this survey, there are questions whether to record historic debris and/or features as a site or an isolated resource (isolate), consult with the Government for direction, the Government is the final word.

Isolates – Historic: Locations that consist of a limited number of historic artifacts (e.g. less than 20 tin cans, etc.) or isolated features that are clearly not associated with any other nearby features or artifact occurrences (within a 25 square meter area), shall be recorded as isolates.

Isolates – Prehistoric: Locations that consist of less than five (5) flakes, or less than three (3) formed tools, or less than three (3) pieces of milling equipment within a 25 square meter area, shall be recorded as isolates.

Loci: A center for cultural activity typically separated from other parts of the site by space devoid of cultural materials. Loci generally contain multiple features and/or occurrences of artifacts.

Multi-Component Site: A site that contains both historic and prehistoric artifacts and/or features as defined herein. A historic site that contains a single prehistoric artifact will not be considered multi-component. A prehistoric site, with a light occurrence of a historic refuse (i.e. five or six sanitary cans) will, likewise, not be considered a multi-component site. If there are questions about how to record a site with multiple components consult with the Government.

Prehistoric Site: Prehistoric era artifacts occurring in sufficient quantity or complexity shall be formally recorded as a site. At a minimum: five (5) unmodified lithic flakes, three (3) worked artifacts (e.g. projectile points, bifaces, groundstone, etc.), or a combination of flakes and artifacts numbering at least three (3) within a 25 square meter area shall be defined as a site. All bedrock mortar(s) locations are sites.

QC: Quality Control.

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 5

QCP: Quality Control Plan.

VI. FIELD MONITORING SURVEYS

Following approval of the Survey Monitoring Plan, the Contractor shall conduct a thorough heritage resource survey within the Survey Needs polygons in the Project Area. A thorough survey includes a systematic pedestrian examination of the surface. Beyond the exposure of the ground surface for assistance in ground visibility, no subsurface excavation is authorized.

1. Record New and Previously Located Heritage Resource Sites within the anticipated areas of disturbance/Contract Area:

The Contractor shall record all newly discovered and previously located prehistoric, ethnographic, and historical heritage resources encountered within the Project Area. A Global Positioning (GPS)

System will be used to record the location of all site boundaries and datums.

Non-Linear Heritage Resources Polygons: All non-linear heritage resource sites boundaries shall be GPS’d as polygons (area feature) with a Datum (point feature) established as a primary mapping point and aid to relocation. Site boundaries shall be established to encompass all artifacts, features, and loci. Site boundaries are defined as five meters out from the nearest artifact/feature. The Contractor shall flag all site boundaries with red and black striped flagging unless otherwise agreed to by the Government. Flagging should be minimized within campgrounds and along trails.

The Contractor shall include all site artifacts, features, and/or loci within a single site boundary as appropriate (e.g. 05-11-51-000a and 05-11-51-000b is not acceptable). If artifacts, features and/or loci are separated by 50 meters or more, these should be recorded and flagged as separate sites. All site boundaries shall be recorded in meters. Historic features are recorded in English rule, except for measurement from Datum to feature and/or artifacts, which shall be recorded in meters. Site sketch maps shall be drawn to scale.

Standard: A flagged site boundary should be visible from the outside of the site, looking in toward the site boundary. Red and black striped flagging will be hung on the outside of site boundaries at a height of at least 5 feet if physically possible, whereas a minimum of 3 flags are visible from any point outside of the site boundary.

Linear Heritage Resources: All linear heritage resources shall be documented and GPS’d as line features. Site boundaries are defined as five meters out from the last artifact/feature. The

Contractor shall flag all linear site boundaries with red and black striped flagging along each side to give a corridor effect where possible.

Linear heritage resources shall have all breaches (i.e. forest roads, trails, logging skids, etc.)

GPS’d as a point feature and shall be recorded on the linear feature record.

Standard: Flagging for linear features shall be hung on the outside of site boundaries at a height of at least 5 feet if physically possible, whereas a minimum of 3 flags are visible from any point outside of the site boundary.

Forms and Maps: Heritage resources shall be documented on forms and maps.

Standard: All heritage resource site records shall be recorded using the format approved by the

California State Historic Preservation Office (DPR-523). All new heritage resource sites shall be brought to the attention of the Forest Service Heritage Resource Program Manager and require a completed Primary Record (DPR-523A) and a Location Map (DPR-523J). Additional records are required including a Site Sketch Map (DPR-523K), a Photograph

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 6

Record (DPR-523I) and photographs printed on a Continuation Sheet (DPR-523L). In most cases, for heritage resources recorded as polygons, an Archaeological Site Record (DPR-523C) shall also be required. If a heritage resource site is linear, then a complete Linear Feature Record

(DPR-523E) is required. If a site contains a standing building, then a complete Building, Structure, and Object Record (DPR-523B) is required. Bedrock milling or mortar features shall require a completed Milling Station Record (DPR-523F). If petroglyphs or any other form of rock art are present, then a complete Rock Art Record (DPR-523G) is required.

All site Location Maps shall include the actual GPS’d site polygon plotted on a USGS 7.5’

Quadrangle. Circles, abstract symbols, or lines are not acceptable. The exception is if a site polygon is too small to be accurately plotted, then a point shall be used. Location Maps shall clearly identify the site location using the assigned Forest Service site number in accordance with the Building numbers provided. The name and year (as revised) of the Quadrangle Map will be included along with the Township, Range and Section. Location maps must retain the 1:24,000 scale. Do not alter (reduce or expand) the scale of the map.

Photographs: Digital images shall be provided of the site overview, site datum, features, and diagnostic artifacts. Images shall be submitted as prints within the site forms and electronically as

.jpeg or .tiff files with the Draft Report.

Non-Linear Heritage Resource Polygons Overlapping the Survey Needs Boundary: New heritage resource sites that overlap or straddle the Project Area boundaries shall be treated as if they fall entirely within the Project Area. The exception to this will be if the heritage resource overlaps onto private property. In this case, only the portion of the site on National Forest System lands will be recorded and its continuance onto private lands will be noted on the site record.

Linear Heritage Resources Overlapping the Survey Needs Boundary: All Linear sites that overlap or straddle the Project Area polygon boundaries on to National Forest System lands shall be recorded and flagged for 50 meters outside of the Project Area.

Heritage Resources Associated with Linear Sites: Non-linear heritage resources associated with linear sites (e.g. wooden structures, historic refuse, etc.) shall be recorded as separate sites.

The linear site shall be depicted on site sketch maps of any heritage resource polygon site it falls within.

Associated features or artifacts that would ordinarily qualify as an isolated resource (see V.

SPECIAL REQUIREMENTS, 1. Definitions) shall be described and included within the site record of the linear site in question. These shall also be included within the flagged corridor of the linear site unless the isolate is more than 25 meters from the linear site. If associated isolated features or artifacts are in excess of 25 meters from a linear site, then these should be recorded as isolates. Linear sites and their immediately adjacent associated artifacts/features shall be GPSed as a “line feature” down the center of the linear site. Unassociated isolated features or artifacts will be noted or recorded as appropriate within the ARR and/or an isolate record.

Short Linear Sites Associated with Non-linear Sites: Heritage Linear sites that are less than

100 meters long and are associated with a non-linear heritage resource site (e.g. a short ditch contained within a larger placer mining site), shall be recorded as a feature within the non-linear site. These associated linear sites shall be included in the site GPS’d polygon and flagged boundary for payment.

Isolates: All isolated artifacts or features shall be described and keyed to 7.5 ‘ USGS topographic quadrangle map included within the Draft Report. In the case of diagnostic or unusual artifacts and features, these should be recorded on an Isolate Table that includes 1) an

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 7 isolate number, 2) isolate description, and 3) UTMs of isolate location. GPS data collection is required for diagnostic isolates.

Procedures: If there is any professional disagreement during the term of this contract as to the age, condition, significance, previous use, status, size, or connectivity of a site or artifacts, or appropriate forms, the Government’s determination is final.

Standard: All new heritage resource site records including site location directions, datum descriptions, site sketch maps, site location maps, and photographs, and are completed to current standards. ACT’s are posted and include the site number and boundary dimension information.

Sites are all GPS’d as points (at the datum), polygons, and lines as described above. Sites are flagged to the standards described above.

3. Mapping and GPS Requirements. A Resource Grade Global Positioning (GPS) system shall be used to record the location of site boundaries and datums. No recreational GPS is allowed. Project planning before GPSing is recommended. All GPS data shall be corrected, eliminating “bowties”, “spikes”, and sliver polygons.

Site numbers should be entered in the GPS unit as eleven digit numbers without any dashes or spaces.

For example 05115100123 or 05115501234.

All heritage resource sites that are recorded as a polygon shall have their boundaries GPS’d as an area feature with a point feature taken at the primary datum/ACT location. Linear sites shall be GPS’d as a line feature. Artifacts within a site do not have to be GPS’d. Diagnostic isolates shall be GPS’d.

Where GPS verification cannot be obtained directly for a location after three attempts, the contractor will document the situation within the following Session Report. The contractor and the government will determine how to address the situation on a case-by-case basis (e.g. taking an offset point or digitizing the data). The government’s determination is final.

The Contractor shall provide the following Resource grade GPS site location information with the

Draft Final Report. The Contractor shall submit the verification to the Government in the form of survey notes or GPS files with META data. The mapped locations shall be converted to ArcMap shape files before they are submitted to the Government. Files required include:

(a) Original uncorrected GPS data files (.ssf)

(b) Base Files used to make corrections (.txt)

(c) Corrected GPS files (.cor)

(d) GPS files exported as ARC GIS shape files (with at least these 3 components- .shp, .shx, .dbf)

Standard: All GPS locations shall be to within plus or minus 3 meters horizontal distance at 68% probability of their actual location. The mapped locations shall be recorded in meters with NAD

1983, CONUS, UTM Zone 10 north. Suggested Receiver settings include: 3D Mode, a PDOP of 8, SNR of 6, and Elevations Mask of 15 degrees. GPS data shall be provided to the Government as shape files that can be immediately used to relocate and inspect new or previously located heritage resource site locations.

VII. DELIVERABLES

1. Pre-Survey Monitoring Deliverables

a. Survey Monitoring Plan: The Contractor shall incorporate the information gathered from the

Literature Review, Pre-Survey Reconnaissance, and Survey Planning Session with the

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 8

Government, and incorporate it into the Solicitation Proposal, and rename it the Survey Plan. The

Survey Plan shall include the who, what, when, and where about the Contractor’s survey. The

Survey Plan shall be submitted for Government review at least five business days before the planned start of the survey. The Survey Plan must be approved by the Government prior to the start of the survey. During the life of the contract the Contractor shall keep all portions of the

Survey Plan up to date. The Contractor shall submit updates to the Survey Plan throughout the term of the contract along with the Session Report. Rejected Survey Plan updates shall be reworked and resubmitted.

Standard: The Contractor’s Solicitation Proposal is updated and renamed the Survey Plan. At a minimum the Survey Plan will contain the following:

(1) Schedule: Contractor’s work schedule including field session dates and the dates the session reports will be submitted, as well as other work commitments.

(2) Work Progression: The approximate order the project will be surveyed and strategy for covering the Project Area

(3) Organization: A discussion of crew organization and the introduction of new surveyors that were not in the solicitation proposal.

(4) Equipment: A discussion of the transportation and other equipment required, the GPS equipment to be used including make and model of data collection hardware.

(5) Emergency Measures: A discussion of emergency measures and communications between field crew members as well as communication between the office and field.

(6) QCP: Quality Control Plan and Forms.

(7) Survey Map: A Survey Map based on a 7.5’ USGS map.

(8) Changes of Survey Coverage to Non-Surveyable: Any approved changes of survey coverage to non-suveyable acres resulting from the pre-survey reconnaissance and survey planning discussions with the Government.

b. Quality Control Plan: The Contractor shall include the Quality Control Plan submitted as a part of the Solicitation Proposal, as a part of the Survey Plan. During the term of the contract the

Quality Control Plan shall be modified as needed to insure that the Contractor’s self-inspection finds errors and corrects them. A summation of the Quality Control activities shall be submitted with the Session Report(s) and a contract summation shall be included with (but separate from) the Draft and Final Reports.

Standard: The Contractor’s QCP makes meaningful and significant improvements to the quality of the Contactor’s tasks and subtasks, as specified in the Task Order Form. The QCP documents the strategy for the inspection of fieldwork and all deliverables, including site record forms, maps, and reports. The Contractor’s QCP specifies what field or office task is being inspected, who’s doing the inspections, how many or what percentage of the task is being inspected, how often, and to what standard they are being inspected. A form shall be developed by the Contractor and used to document the Quality Control Inspections. A discussion of the week’s Quality

Control activities, the results, the remedies, and the forms, shall be turned in with each Session

Report. The Contractor’s QCP shall be updated and improved as needed to assure all tasks and subtasks meet the standards in the Government’s Quality Assurance Plan.

2. Field Monitoring Survey Deliverables

a. Session Reports: Session Reports are required during field monitoring, covering the previous session (see V. SPECIAL REQUIREMENTS, 1.02 Definitions). Photocopies of draft forms and maps provided in the Session Reports shall be complete and legible. Session Reports shall be emailed to the Government no later than four days after the end of each session. Paper documents are due at the same time and shall be scanned and sent electronically or mailed via US Postal

Service. Photocopies of Quality Control Inspections, and maps, are required.

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 9

Standard: The session reports include, at a minimum:

(1) Updated Monitoring Plan: Updates to the Survey Monitoring Plan as necessary, submit as an updated document or an amendment. This includes updates to the schedule.

(2) QC Update: A summary of the previous week’s Quality Control Activities, include copies of forms.

(3) Draft Monitoring Logs: Indicate key personnel, project activities and observations.

(4) Draft Paper Forms: Photocopies or scans of all Draft Field Site Record Forms are due no later than two weeks after discovery with the next Session Report. A GPS point for each site is due with the draft forms.

(5) Work Completed and Planned: Discussion of work completed and that planned for the next session.

(6) Changes: Discussion of the techniques used and work completed that differ from the

Survey Plan as needed. Proposed Personnel changes and their resumes.

(7) Survey Coverage and Non-Surveyable Areas: An updated chart, keyed to a map, showing acreage estimated of surveyed areas and non-surveyable areas as compared to the Government’s Suggested Survey Coverage.

3.GPS and GIS Data Deliverables

a. GPS and GIS Data: GPS and GIS files are due with the Draft Report.

Standard: GIS data to be turned in includes the following:

(1) GPS Files:

(a) Original uncorrected GPS data files (.ssf)

(b) Base Files used to make corrections (.txt)

(c) Corrected GPS files (.cor)

(d) GPS files exported as shape files (with at least these 3 components- (.shp, .shx, .dbf)

(2) Digitized GIS Survey Coverage’s:

(a) Digitized GIS files (with at least these 3 components- .shp, .shx, .dbf )

4. Draft Report

a. Draft Report: The Contractor’s Draft Report and all heritage resource site records shall be prepared in Microsoft Word and submitted for Government review and comment.

Standard: The Draft Report includes, at a minimum, the following items:

(1) Literature Reviewed: A discussion of the Literature Reviewed and Pre-Survey.

(2) Contextual History: A brief review of the prehistory and history of the Project Area and predicted sensitivity for heritage resources resulting from these findings.

(3) Methodology and Findings: A discussion of the methodology and any findings produced during the monitoring surveys. The contractor shall discuss the survey intensity employed. The Contractor shall discuss all new and previously located sites recorded. A list and discussion of isolates shall also be provided.

(4) Draft Final Site Record Forms: DPR Primary Record and Location Map forms along with all associated site record forms, sketch maps, and photographs shall be included.

New sites and previously located sites shall be keyed to the map but bound separately.

(5) Isolate Table: A table with a list of diagnostic artifacts or features and their location.

(6) Survey Map and Project Maps: All maps shall be submitted at 1:24,000 scale with the exception of the Location Map.

(a) Location Map: Indicates the Project Area location.

(b) Survey Coverage Map: This shall include a digitation of the monitored areas and those that were non-monitored.

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 10

(c) Site Location Map: Includes all of the GPS’d site locations depicted and labeled with Forest Service site numbers. Sites will either be represented by a polygon, point, or a line and will be keyed to the ARR.

(d) Isolate Map: Isolates will be represented by points (digitized or GPS’d), labeled numerically and keyed to the ARR.

(8) Resource Grade GPS/GIS Files: Shall be submitted on a CD and will include the following:

(a) Original uncorrected GPS data files (.ssf)

(b) Base Files used to make corrections (.txt)

(c) Corrected GPS files (.cor)

(d) GPS files exported as shape files (with at least these 3 components- (.shp, .shx, .dbf )

b. QC Assessment: A Quality Control Assessment of the Contractor’s work, based on the

Contractor’s Quality Control Activities, shall be provided separate from the Draft Report discussing how well the survey met Applicable Documents and Government expectations.

5. Final Report and Final Site Records: (See 52.211-10 Commencement, Prosecution, and

Completion of Work (APR 1984) for due dates). Upon completion of the government review, the

Contractor shall incorporate all of the Government’s comments on the Draft Report, draft forms, and

GIS data into the Final Report. Two paper copies of the Final Report, signed by the Principle

Investigator (one bound and one un-bound), and a copy of the Final Site Record Forms and Quality

Control Summary, both bound separately, shall be submitted to the Government. One electronic version (CD) of the Final Report, final site record forms for new sites, and all updates and forms for previously located sites, shall be submitted. The Contractor shall submit the approved Final Report and Site Records to the Northeast Information Center of the California Historic Resource Inventory at

CSU, Chico. A copy of the transmittal letter shall be sent to the Forest Service. The Contractor shall be responsible for obtaining California State Trinomial numbers for all sites that haven’t been assigned one.

Standard: The Final Report and site record forms contain everything in the drafts plus the changes specified in the Government’s review and comments on the site records and Draft Report. The

Contractor shall return with the Final Report, all site records for previously recorded heritage resources, and any unused Government Furnished Property.

DELIVERABLES DRAFT DUE GOV. REVIEW FINAL VERSION DUE

Monitoring Plan 7 Calendar Days Before

Survey Starts

3 Work Days 1 Work Day Before

Survey Starts

Session/Interim Reports As Specified in

Monitoring Plan

5 Business Days ----

QC Assessment With Draft Report. 1 Week Accompanies Draft

Report (Separate)

Draft Report As specified 14 Calendar Days ----

Final Report As specified. ---- -----

VIII. GOVERNMENT FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with provisions of FAR Clause 52.245-2 "Government Property (Fixed-Price Contracts)" hereby incorporated by reference into the contract in accordance with FAR clause 52.252-2 “Clauses

Incorporated By Reference” found herein. The Contractor shall return with the Final Report all copies of

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 11 site records, and any unused Government furnished property. The following property will be furnished to the Contractor after award:

GOVT. FURNISHED

PROPERTY/

MATERIALS/SERVICES

QUANTITY WHEN WHERE

Electronic version of the

Project and Vicinity Map

During

Solicitation Via email through CO.

Paper copies of the GIS

Generated Work Map, 1:24,000.

Post Award

Meeting

Ranger District Listed in Schedule of Items.

One CD containing the shape files used to build the Work

Map.

Post Award

Meeting

Ranger District Listed in Schedule of Items.

USGS 7.5 min. Topographic quad maps of project area

1 set electronic or paper

Upon Request Ranger District Listed in Schedule of Items

Copies of Aerial photos 1 set Upon Request Ranger District Listed in Schedule of Items

A GIS generated paper map of the previously located sites within and adjacent to the project area, if available.

Available for

Viewing during

Solicitation.

Available at

Post Award

Meeting

Ranger District Listed in Schedule of Items.

Electronic version of the site record forms.

During

Solicitation

Ranger District Listed in Schedule of Items

Site Records for relevant

Previously Located Sites

Can be Viewed during

Solicitation.

Received at

Post Award

Meeting

Ranger District Listed in Schedule of Items

“Area Controlled” aluminum signs (ACTs), red and black striped flagging.

Sufficient

Post Award

Meeting of Items

Archaeological Resource

Report Number and Heritage

Resource Site Numbers

As needed Post Award

Meeting of Items

Site specific information is available for viewing prior to receipt of proposals (by appointment only) at the

Cleveland National Forest Supervisors Office, in San Diego, California. Prospective contractors are encouraged to contact Karin Klemic, Forest Archaeologist for additional information.

IX. CONTRACTOR FURNISHED CRITICAL ITEMS /SERVICES

The Contractor shall provide all labor, housing, supervision, transportation, tools, and materials (except

Government-Furnished Property) necessary to perform the requirements of the contract. Specifically, but not necessarily all inclusive, the Contractor shall furnish the items listed below:

ARCHAEOLOGICAL MONITORING Section 31 20 01 - 12

CONTRACTOR

FURNISHED CRITICAL

ITEMS/SERVICES

QUANTITY DESCRIPTION

Compass, clinometer, One per crew member

Azimuth compass with 2 degree resolution set to local declination

GPS unit One Resource grade GPS unit capable of collecting data that can be differential corrected, providing verified data within 3 meters at 68% probability.

Recreation type GPS units are not acceptable.

Cell Phone or two way radio One per crew For safety, one cell phone or two way radio for each survey group.

Digital Camera One Capable of providing clear images of the required subjects

END OF SECTION 31 20 01

File details come from the government source that posted it.