Palomar Ranger District Road Maintenance Contract 2019 Vicinity Map
³
PROJECT
AREA
CLEVELAND NATIONAL FOREST
q0 1 2 3 40.5 Miles
Legend Road Name/Miles
BLACK MOUNTAIN-4.71 Miles BLACK MOUNTAIN SPUR-0.78 Miles HALFWAY TT-4.08 Miles HIGHPOINT TT-8.82 Miles INDIAN FLATS- 4.32 Miles LOVE VALLEY- 1.05 Miles LUSARDI-5.92 Miles OAK GROVE- 5.20Miles OROSCO RIDGE-5.70 Miles PALOMAR DIVIDE-11.07 Miles UPPER SANTA YSABEL-5.13 Miles
Palomar Ranger District(North) Road Maintenance 2019 q0 1 2 3 40.5 Miles
Legend Road Name/Miles
BLACK MOUNTAIN-4.71 Miles BLACK MOUNTAIN SPUR-0.78 Miles HALFWAY TT-4.08 Miles HIGHPOINT TT-8.82 Miles INDIAN FLATS- 4.32 Miles LOVE VALLEY- 1.05 Miles LUSARDI-5.92 Miles OAK GROVE- 5.20Miles OROSCO RIDGE-5.70 Miles PALOMAR DIVIDE-11.07 Miles UPPER SANTA YSABEL-5.13 Miles
Palomar Ranger District(South) Road Maintenance 2019
811 BLADING (2/99)
1. DESCRIPTION
This work consists of surface blading native or aggregate roads to a condition to facilitate traffic and provide proper drainage. Blading includes shaping the crown or slope of traveled way, maintaining berms and drainage dips, and compacting the surface in accordance with this specification.
2. MAINTENANCE REQUIREMENTS
a. Timing
Surface blading shall be performed during the contract period as ordered by the Government.
b. General
1. The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise Marked on the Ground, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to a depth of no less than 2 inches or the depth of potholes or corrugations. Corrugations are washboarding and similar defects.
Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.
2. When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation.
Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.
3. Existing native, rock or aggregate surfaced drainage dips shall be cleaned and shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.
4. The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
c. Routine Blading
1. Excess roadbed width shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
d. Compaction
All roads bladed under this section shall be compacted using Method A. Compaction Method A is considered incidental to blading.
Compaction shall commence immediately following blading. Compaction methods are:
Compaction Method A: By breaking track while operating equipment on the bladed surface. Compaction shall cover the full width bladed surface.
Compaction Method B: 8-10 ton pneumatic, steel or equivalent vibrating roller, operated to cover the full width of the bladed surface two (2) times.
e. Intrusions
Where the minimum width of 12 feet is not available, the Contractor shall construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated by the Government.
f. Undercutting
Roadway backslope shall not be undercut.
g. Intersections
1. Intersections with side roads which are not closed or restricted to vehicular use shall be bladed to assure smooth transitions.
2. Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars. Also, roads listed for work under Sections 835 or 838 shall be considered restricted.
3. Side roads listed for work under this Section shall be considered as not restricted.
h. Cleaning of Structures
Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, drainage dips, aprons, or flumes.
i. Berms
Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.
j. Scarification
1. This work shall consist of destroying or breaking up old or damaged chip seal and dust oil surfaces and the loosening of native and pit run surfaces for blading and reshaping the road surface.
2. Scarification shall be accomplished by rippers spaced not more than 12 inches apart.
3. Scarification shall not penetrate the aggregate base to the subgrade. Where aggregate base is 3 inches or greater in depth, the minimum scaification depth shall be 3 inches.
3. MEASUREMENT
Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.
a. Measurement for blading will be single-lane mile measured along the centerline of the roadway (see quantity measurement terms). Two-lane roads will be measured as two (2) single-lane miles. Measurement will be to the nearest one-tenth (0.1) mile.
b. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile; however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.
c. Berm maintained or established will be measured by linear foot.
d. No measurement will be made under this Section for Compaction Method A.
Measurement for Compaction Method B will be the same as stated in 3.a for blading.
4. PAYMENT
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Pay Unit
811(1) Blading Surfaced Roads Mile 811(2) Blading Native and Pit Run Roads Mile 811(3) Berm Maintained Mile 811(4) Establishing Berms Mile 811(5) Compaction - Method B Mile 811(6) Scarification Pass Mile
881 MOBILIZATION (2/94)
1. DESCRIPTION
This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.
2. MEASUREMENT
When the contract establishes separate work periods within the contract time any additional mobilization included as a Bid Item will be retained until the actual work period.
3. PAYMENT
a. Progress payments will be made on the basis of the Bid Items contained in the Schedule of Items as follows:
1. When five (5) percent of the estimated contract amount in the work period is earned, fifty (50) percent of the amount of mobilization will be paid.
2. When twenty-five (25) percent of the estimated contract amount in the work period is earned, one hundred (100) percent of the amount for mobilization will be paid.
3. The total sum of all payments under this Section shall not exceed 10% of the total contract amount.
4. The contract amount for mobilization shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals involved in mobilization.
b. Payment will be made under:
Pay Item Pay Unit
881(1) Mobilization Each
ROAD MAINTENANCE IDIQ TO RFP
CNF PALOMAR
ATTACHMENT 3
FIRE PROTECTION REQUIREMENTS
FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS
03/30/2018
1. SCOPE:
The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area.
The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.
2. RESPONSIBILITIES:
A. Contractor
(1) Shall abide by the requirements of this Fire Plan.
(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.
(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.
(4) Shall designate in the Fire Plan and furnish on Contract Area, during operating hours, a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.
B. Forest Service
The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.
3. DEFINITIONS:
The following definitions shall apply:
Active Landing: A location the contractor may be skidding logs into, or performing other operations such as delimbing, log manufacturing, and chipping logs. Except for EV and E days, loading logs or stockpiling chips only, on a cleared landing, does not constitute an Active Landing.
Hot Saw: A harvesting system that employs a high-speed (>1100 rpm) rotating felling head, i.e., full rotation lateral tilt head.
ATTACHMENT 2
Mechanical Operations: The process of felling, skidding, chipping, shredding, masticating, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders , dozers etc.
4. TOOLS AND EQUIPMENT:
The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:
The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.
• This contract requires, does not require, a Fire Box and associated Fire Tools according to CPRC Section 4428.
A. Fire Tools and Equipment: Contractor shall meet minimum requirements of Section 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source. All required fire tools shall be maintained in suitable and serviceable condition for fire fighting purposes.
Trucks, tractors, skidders, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.
Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 25 feet of each tail and corner block.
B. Fire Extinguishers: Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).
Skidders and tractors shall be equipped with a minimum 5-BC fire extinguisher.
All Fire Extinguishers shall be mounted, readily accessible, properly maintained and fully charged.
Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent.
C. Spark Arresters and Mufflers: Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the.
National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition. Every motor vehicle subject to registration shall at all times be equipped with an adequate exhaust system meeting the requirements of the California Vehicle Code.
D. Power Saws: Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. An Underwriters Laboratories (UL) approved fire extinguisher containing a minimum 14 ounces of fire retardant shall be kept with each operating power saw. In addition, a size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.
• This contract requires, does not require, Section 4E of the Fire Plan.
E. Tank Truck or Trailer: Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor's Operations hereunder during Fire Precautionary Period.
When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing, unless otherwise excepted when Hot Saws or Masticators are being used. See Section 6 for specific contract requirements.
The tank shall contain at least 300 gallons of water available for fire suppression. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area.
Tank truck or trailer shall be equipped with the following:
(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:
T e m p
Sea
Level
Feet
10000
55 179 23 174 23 169 23 165 22 161 22 157 22 153 22 150 21 146 21 142 21 139 21 70 175 23 171 23 166 22 162 22 158 22 154 22 150 21 147 21 143 21 139 21 136 20 85 171 23 168 23 163 22 159 22 155 22 151 21 147 21 144 21 140 21 136 20 133 20
100 168 23 164 23 159 22 155 22 152 22 148 21 144 21 141 21 137 20 133 20 131 20 P
S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.
(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.
(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:
G.P.M. Horizontal Range Straight Stream 10 38 feet Fog Spray 6 - 20 N/A
(4) Sufficient fuel to run the pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.
When Contractor is using Hot Saws or Masticators, an additional 250 feet of light weight hose, approved by the Forest Service, shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above.
This equipment and accessories shall be deliverable to a fire in the area of operations and is subject to the requirements for each specific activity level identified in Section 6.
F. Compressed Air Foam System: A Compressed Air Foam System (CAFS) is a fire suppression system where compressed air is added to water and a foaming agent. By agreement, Contractor may substitute a CAFS or functional equivalent in lieu of the tank truck, trailer or fire extinguishers, provided it meets or exceeds the following specifications and requirements:
1. Variable foam expansion ratio – 10:1 to 20:1.
2. Units shall be kept fully charged with air; water and foam concentrate as recommended by the manufacturer and have the appropriate tools to service the system.
3. The unit shall contain enough energy to empty tank and clear hose prior to exhausting propellent.
4. The unit shall be capable of being completely recharged within 10 minutes.
5. When used on cable yarding landings, the unit shall be outfitted for immediate attachment to carriage and transported without damage to the unit.
Fire extinguishers required for Hot Saws, Masticators and similar equipment identified in Section 4 B.
above may be substituted with a 3 gallon CAFS.
Tank truck, trailer or equivalent may be substituted with a 30 Gallon CAFS with at least 550 feet of one inch hose and an adjustable nozzle with enough water, air and foam concentrate for at least one recharge.
This equipment and accessories shall also be deliverable to a fire in the area of operations and subject to the requirements for each specific activity level identified in Section 6.
5. GENERAL
A. State Law: In addition to the requirements in this Fire Plan, the Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.
B. Permits Required: The Contractor must secure a special written permit from the District Ranger or designated representative before burning, welding or cutting metal or starting any warming fires. If contract requires Blasting and Storing of Explosives and Detonators, an Explosives Permit may be required pursuant to the California Health and Safety Code, Section 12101.
C. Blasting: Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a Fire Patrolperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.
D. Smoking: Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter. In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see.
Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.
E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.
F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor.
Contractor's employees shall report all fires as soon as possible to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:
Name Office Address Office telephone Dispatch Center Federal Interagency
Communication Center 602 S. Tippecanoe Ave San Bernardino, CA 92408
909-383-5654
Nearest FS Station or stations
Mountaintop District Ranger Station
Front Country District Ranger Station
41374 North Shor Dr Fawnskin, CA 92333
1209 Lytle Creek Rd Lytle Creek., CA 92358
909-382-2790
909-382-2851
Inspector/COR Rebekah Dodez Same as dispatch office 909-382-2617 COR Joshua Direen Same as dispatch office 909-382-2609 District Rangers Marc Stamer
Joe Rechsteiner
Mountaintop District RS
Front Country District RS
909-486-1724
909-382-2860
When reporting a fire, provide the following information:
Your Name Call back telephone number Project Name Location: Legal description (Township, Range, Section); and Descriptive location
(Reference point) Fire Information: Including Acres, Rate of Spread and Wind Conditions.
This contract requires, does not require, Section 5G of the Fire Plan.
G. Communications: Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone.
This contract requires, does not require, Section 5H of the Fire Plan.
H. Fire Patrolperson: Contractor shall furnish a qualified fire patrolperson each operating day when Project Activity Level C or higher is in effect. When on duty, sole responsibility of patrolperson shall be to patrol the operation for prevention and detection of fires, take suppression action where necessary and notify the Forest Service as required. This Fire patrol is required on foot, unless otherwise agreed.
By agreement, one patrolperson may provide patrol on this and adjacent projects. No patrolperson shall be required on Specified Road construction jobs except during clearing operations unless otherwise specified.
The Contractor shall, prior to commencing work, furnish the following information relating to key personnel:
Title Name Telephone Number Fire Supervisor
Fire Patrolperson
I. Clearing of Fuels: Contractor shall clear away, and keep clear, fuels and logging debris as follows:
Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law:
10 feet slope radius
Tail or corner haulback blocks: All running blocks shall be located in the center of an area cleared to mineral soil at least 15 feet in diameter.
Lines near, between or above blocks: Sufficient clearing to prevent line from rubbing on snags, down logs and other dead woody material.
6. EMERGENCY PRECAUTIONS
Contractor's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Project Activity Levels applicable to this project shall be the predicted activity levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Contract Area Map Legend on Integrated Resource Service Contracts (IRSC’s), and other contracts where applicable.
Fire Danger Rating Area/Fire Weather Station for Project 642,643,660,665,692, 694, 695
The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM. Contractor shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day.
Phone Number or Website to obtain Predicted Activity Levels: 909-382-2600
Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Contractor is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below.
PROJECT ACTIVITY LEVEL
Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.
A Minimum requirements noted above in Sections 4 and 5.
B 1. Tank truck, trailer, or approved CAFS substitute shall be on or adjacent to the Active Landing.
C 1. When Hot Saws or Masticators are operating, a tank truck, trailer, or approved CAFS substitute shall be within ¼ mile of these operations. Effective communications shall exist between the operator and the Active Landing.
2. Immediately after Mechanical Operations cease, Fire patrol is required for two hours.
D 1. Immediately after Hot Saw or Masticator operations cease, Fire patrol is required for three hours.
2. No Dead Tree felling after 1:00 PM, except recently dead.
3 No burning, blasting, welding or cutting of metal after 1:00 PM, except by special permit.
ATTACHMENT 2
Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.
Ev 1. The following activities may operate all day:
a) Loading and hauling logs decked at approved landings.
b) Loading and hauling chips stockpiled at approved landings.
c) Servicing equipment at approved sites.
d) Dust abatement, road maintenance (Chainsaw use prohibited), culvert installation within cleared area, chip sealing, paving, earth moving or rock aggregate stock pile loading and installation (does not include pit or quarry development).
e) Chainsaw and log processing operations associated with loading logs or other forest products at approved landings.
2. Hot Saws or Masticators may operate until 1:00 PM; provided that:
a) A tractor or other equipment with a blade capable of constructing fireline is on or adjacent to the active landing or within ¼ mile of the operating equipment. This piece of equipment shall have effective communication with the Hot Saw or Masticator.
b) Any additional restrictions specified by the Forest.
3. All other conventional Mechanical Operations are permitted until 1:00 PM.
4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement. Activities for which a Variance may be issued are:
• Rubber Tire Skidding
• Chipping on Landings
• Helicopter Yarding
• Fire Salvage
When approved by a Line Officer, a Variance Agreement can be implemented when the criteria specified in the agreement are met and mitigation measures are in place. This approval is good for ten
(10) days unless cancelled sooner or extended by the Contracting Officer for an additional ten (10) days. Variance approval can be withdrawn at the sole discretion of the Forest Service. Variance approval is contingent on the 7-day fire weather forecast, fuel conditions, site characteristics, current fire situation, state of Contractor’s equipment for prevention and suppression readiness, type of operation and social and community considerations etc. (See attached Project Activity Level Variance Agreement).
E The following activities may operate all day:
1. Loading and hauling logs decked at approved landings.
2. Loading and hauling chips stockpiled at approved landings.
3. Servicing Equipment at approved sites.
4. Dust abatement, road maintenance (chainsaw use prohibited) or loading stock piles and rock aggregate installation (does not include pit or quarry development).
5. Chainsaw operation associated with loading at approved landings.
All other activities are prohibited.
This Project utilizes “The Project Activity Level” (PAL), an industrial operation’s fire precaution system. The following Climatology Chart indicates the Historic Activity Levels for the Project Fire Danger Rating Area or Fire Weather Station utilized on this Project. This is only a historical average of the Activity Levels for the identified Fire Danger Rating Area or Weather Station.
Project Activity Level Climatology
Fire Danger Rating Area/Weather Station
Years Analyzed
A B C D Ev E Days Month Expected Days per Month at Each PAL Value Analyzed July August September October
Region 5 Project Activity Level (PAL) Ev Variance Application/Agreement
Project Name: __________________________________________ Contract Number: _______________________________________ Contractor Name: _______________________________ Request #__, for period: __________________________________ Units/Subdivisions Affected: _______________________________
Location of operation:
Slope
Aspect
Elevation
Fuels on site
Fuels in surrounding area
7 Day PAL Outlook
Short range predictions (Red Flags)
Fuel Moistures
Response time of suppression resources
Potential for ignition
RAWS location
Current Fire Situation:
Draw down information
National Readiness Level
Contractual considerations:
Normal Operating Season
Frequency of recent contract fires in area
Type of operation Contractors past/current performance & equipment readiness
Other site specific mitigation or precaution (i.e. Contractors proposals)
Social & Community Considerations:
Proximity of high value resources
Sensitivity of location
Proposed Actions:
Description of Mitigation Measures:
Remarks:
Fire Management Officer Concurrence
Date
Line Officer Approval Date
I have considered the above request and determined the specified mitigation measures or actions must be implemented to continue operations in Project Activity Level Ev. Unless extended, the approval remains in effect for ten
(10) calendar days unless cancelled sooner or extended by the Forest Service for an additional ten (10) days. At the sole discretion of the Forest Service, this variance can be modified and/or cancelled at no cost to the government.
Contracting Officer Date
Contractor Representative Date
ATTACHMENT 4
ROAD USE RULES AND RESTRICTIONS
2019 ROAD MAINTENANCE CONTRACTS
Commercial Road Rules Objectives: The Road Rules and Regulations for commercial use of roads on the San Bernardino National Forest are:
1. Provide San Bernardino National Forest road users with a uniform and timely system concerning use requirements on roads in advance of applying for permits or bidding on contracts.
2. Provide Forest Officers with a system to display their road use requirements and to administer them uniformly with all commercial users.
3. Implement a responsive system for issuing permits or making other arrangements for authorizing road use to meet the special needs unique to any commercial user.
General Road Rules:
The roads must be treated and stabilized by reshaping, out-sloping, water-barring, immediately following project use.
1. Unless otherwise modified by a Specific Road Rule, all roads on the San Bernardino National Forest are subject to these General Road Rules by any permittee, contractor, their agents or general forest road user. Specific Road Rules may waive or further restrict use on a given road and as described within an appropriate document. Examples of roads modified by a Specific Road Rule are as follows:
A. Roads planned for obliteration in the appropriate planning document may sustain structural damage to the traveled way so long as sediment is contained and not causing environmental damage.
B. Roads planned for intermittent use (closed more than one year), in the appropriate planning document, may sustain damage to the traveled way and not cause environmental damage.
C. Roads not having structural capacity to permit haul during all weather or marginal weather conditions. For example, use may be restricted to specific time frames or to physical site conditions such as use restriction for 24 hours after a 1" rain fall in 24 hour storm event.
2. A National Forest timber purchaser is only authorized to use those roads identified in the list attached to Timber Sale Provisions C5.42 and C5.43 and SPS 104.021. The purchaser is subject to limitations and Specific Road Rules imposed on these roads in Provision C5 .12, these Road Rules, and any outstanding orders issued by the Forest Supervisor.
3. Enforcement of the Road Rules is subject to rights granted in existing contracts, permits, and easements in force.
4. The provision of the State laws relating to the operation of motor vehicles are applicable to all Forest Service roads on the San Bernardino National Forest and are enforceable by State, County, or Forest Service law officers.
ATTACHMENT 3
5. The load weight, height, length, and width limitations of vehicles on roads shall be in accordance with applicable State laws (36 CFR 261. 12(a))
6. Commercial use is not permitted on any San Bernardino National Forest road unless the user has a permit or other written authorization. Refer to special order issued under Regulation 36 CFR 261.54(c}.
7. Forest Service roads are subject to short-term traffic restrictions or closures due to seasonal or unusual weather conditions, user safety, or when necessary to permit reconstruction and maintenance.
8. Commercial use of National Forest roads by any permittee, contractor, or their agents will be suspended when such use will cause damage to resources, the roadway, structures, or when the use will result in unsafe condition to others. Such suspension shall be effective when the commercial user is notified verbally, in writing, or by road closure posted on the road (36 CFR 261.54). Verbal suspensions are to be followed by notification in writing.
9. Damaging, and leaving in a damaged condition, any road or segment thereof is prohibited. Damage is exclusive of ordinary maintenance described in the contract or permit (36 CFR 261.12(c)). The commercial user is responsible for repairing road damage and restoration of the road to its original load carrying ability, lines, and grades when damage is caused by commercial users' operations. In addition to the road damage described in Exhibit A the following are prohibited:
A. Driving crawler or lug equipment upon or leaving tractor marks upon any bridge or structure, including asphalt, concrete, wood or metal surfaces.
B. Any bending, breaking, removal, or other damage to bridge rails, bridge decks, guardrails, culverts, signs or signposts, markers, or other structures.
C. Destruction of the road prism (travel way, ditches, fill and cut slope) not correctable by normal maintenance activity.
10. Exceeding posted bridge weight limits is not authorized, except by permit (36 CFR 261.
12(a)).
11. Snow plowing without permit or other written agreement is prohibited (36 CFR 261.10(a)).
Application for a snow removal permit must be requested through the appropriate District Ranger.
12. All signing requirements on roads open for public use on the Forest will meet Manual of Uniform Traffic Control Devices (MUTCD) standards.
13. Unless otherwise provided in a contract, permit, or agreement, no road shall be blocked by placing of any vehicle or other object upon it in a manner that is an impediment or hazard to safety, or conflicts with other users (36 CRF 261.10 (f) and 36 CFR 261. 12(d)).
Application for permission to block roads or for other uses must be made to the appropriate District Ranger.
14. The following are examples of impediments or hazards:
A. Falling trees onto the roadway without permit and proper warning signs.
B. Slow moving logging, construction, or road maintenance equipment operated without posting proper warning signs.
C. Logging slash or debris deposited or left in the roadway, ditches or cut bank.
D. Parking equipment or vehicles in the roadway without proper signing.
E. Logs yarded or decked on the roadway without proper signing.
15. Any logging operation that requires cables to be suspended above or used across the roadway without proper signing and/or traffic control.
16. Waivers to Rules may be allowed when such permission is in writing. Permission may be granted and. documented using the proper format established in contracts or road use permits. Apply for permission through District Ranger.
ROAD DISTRESS AND DAMAGE DEFINITIONS
1. Road Distress: Indicates maintenance must be performed as specified in maintenance specifications. If maintenance cannot be performed, use must be reduced or stopped until signs of distress are no longer present unless otherwise agreed in writing by the Forest Service.
A. Road distress indicators on gravel surfaces are:
i. Surface course deformities (potholes, soft spots, ruts, etc.) greater than
2" deep that can be repaired with incidental loads of aggregate.
ii. Drainage not functioning as designed (surface and/or structures).
iii. Slurry affecting traction or strength of road and not causing damage as defined under Environmental Damage below.
B. Road distress indicators on pavement are:
i. Any perceptible change in the pavement cross section or surface
(cracking, visible deflection, etc.) caused by contractor's operations.
ii. Drainage structures not functioning as designed.
2. Road Damage: Is a reduction in the ability of a road or structure to carry traffic that cannot be corrected by recurring maintenance methods. Use must be stopped and the road repaired unless otherwise agreed in writing by the Forest Service citing the appropriate contract provisions. Road damage exists when:
A. Load carrying ability of the road is reduced as a result of, but not limited to:
i. Subgrade pumping and/or contamination of surfacing by subgrade.
ii. Excessive soft spots, potholes, or ruts that result in subgrade deformation.
iii. Slurry exists in the roadway but is contained within the roadway or is draining on locations which are containing the sediment by use of biological or man-made erosion control filters.
B. Maintenance methods specified in the contract cannot repair the road.
C. Failure to maintain drainage causes loss of surfacing, saturation of subgrade layers, degradation of surface course, or erosion of fill slopes.
D. Use of asphalt road results in permanent deformation of pavement cross section or degradation of asphalt surface.
3. ENVIRONMENTAL DAMAGE: Is the displacement of soil material, resulting from contract operations, into intermittent or perennial streams that results in an increase in sediment. Environmental damage exists when all of the following occur:
A. Vehicular traffic causes displacement of fines through pumping, rutting or damage to drainage features creating sediment-laden water on or from the road surface.
B. Sediment laden water resulting from pumping of fines is reaching intermittent or perennial streams.
C. Sediment is visible and there is an increase in turbidity in streams occurring at points downstream from the outfalls of culverts, ditch lines, or fords. Haul will be permitted when facility or environmental damage will not result.
4. INVASIVE PLANTS: Certain Invasive plant species are an issue on San Bernardino
Mountain roads. All equipment should be cleaned and washed prior to entry to the forest. Equipment may be required to be cleaned after certain sections of roads have been worked to prevent spreading of certain invasive species. A record of cleaning is included in the contract.
5/3/2019 https://www.wdol.gov/wdol/scafiles/std/15-5635.txt?v=10 https://www.wdol.gov/wdol/scafiles/std/15-5635.txt?v=10 1/10
WD 15-5635 (Rev.-10) was first posted on www.wdol.gov on 01/01/2019
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5635 Daniel W. Simms Division of | Revision No.: 10 Director Wage Determinations| Date Of Revision: 12/26/2018 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: California
Area: California County of San Diego **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 16.84 01012 - Accounting Clerk II 18.91 01013 - Accounting Clerk III 21.16 01020 - Administrative Assistant 29.71 01035 - Court Reporter 25.51 01041 - Customer Service Representative I 14.32 01042 - Customer Service Representative II 16.10 01043 - Customer Service Representative III 17.57 01051 - Data Entry Operator I 15.00 01052 - Data Entry Operator II 16.37 01060 - Dispatcher, Motor Vehicle 21.04 01070 - Document Preparation Clerk 17.13 01090 - Duplicating Machine Operator 17.13 01111 - General Clerk I 13.72 01112 - General Clerk II 15.34 01113 - General Clerk III 17.22 01120 - Housing Referral Assistant 21.40 01141 - Messenger Courier 15.89 01191 - Order Clerk I 17.11 01192 - Order Clerk II 18.67 01261 - Personnel Assistant (Employment) I 18.29 01262 - Personnel Assistant (Employment) II 20.67 01263 - Personnel Assistant (Employment) III 23.10 01270 - Production Control Clerk 24.21 01290 - Rental Clerk 16.09 01300 - Scheduler, Maintenance 17.28 01311 - Secretary I 17.28 01312 - Secretary II 19.20 01313 - Secretary III 21.40 01320 - Service Order Dispatcher 18.80 01410 - Supply Technician 29.71 01420 - Survey Worker 19.16 01460 - Switchboard Operator/Receptionist 15.33 https://www.wdol.gov/wdol/scafiles/std/15-5635.txt?v=10 2/10
01531 - Travel Clerk I 14.86 01532 - Travel Clerk II 16.24 01533 - Travel Clerk III 17.83 01611 - Word Processor I 16.07 01612 - Word Processor II 18.04 01613 - Word Processor III 20.18 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 22.28 05010 - Automotive Electrician 22.37 05040 - Automotive Glass Installer 21.55 05070 - Automotive Worker 21.55 05110 - Mobile Equipment Servicer 19.83 05130 - Motor Equipment Metal Mechanic 23.16 05160 - Motor Equipment Metal Worker 21.55 05190 - Motor Vehicle Mechanic 22.75 05220 - Motor Vehicle Mechanic Helper 18.60 05250 - Motor Vehicle Upholstery Worker 20.75 05280 - Motor Vehicle Wrecker 21.55 05310 - Painter, Automotive 22.79 05340 - Radiator Repair Specialist 21.55 05370 - Tire Repairer 15.52 05400 - Transmission Repair Specialist 23.16 07000 - Food Preparation And Service Occupations 07010 - Baker 12.40 07041 - Cook I 14.42 07042 - Cook II 16.40 07070 - Dishwasher 10.92 07130 - Food Service Worker 11.62 07210 - Meat Cutter 15.71 07260 - Waiter/Waitress 11.75 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 19.94 09040 - Furniture Handler 15.11 09080 - Furniture Refinisher 21.93 09090 - Furniture Refinisher Helper 17.69 09110 - Furniture Repairer, Minor 20.29 09130 - Upholsterer 19.94 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 12.96 11060 - Elevator Operator 13.91 11090 - Gardener 17.52 11122 - Housekeeping Aide 13.91 11150 - Janitor 13.91 11210 - Laborer, Grounds Maintenance 13.93 11240 - Maid or Houseman 12.56 11260 - Pruner 13.45 11270 - Tractor Operator 16.31 11330 - Trail Maintenance Worker 13.93 11360 - Window Cleaner 15.25 12000 - Health Occupations 12010 - Ambulance Driver 18.34 12011 - Breath Alcohol Technician 23.34 12012 - Certified Occupational Therapist Assistant 31.23 12015 - Certified Physical Therapist Assistant 32.56 12020 - Dental Assistant 19.60 12025 - Dental Hygienist 44.71 12030 - EKG Technician 31.67 12035 - Electroneurodiagnostic Technologist 31.67 12040 - Emergency Medical Technician 18.34 12071 - Licensed Practical Nurse I 20.96 12072 - Licensed Practical Nurse II 23.46 12073 - Licensed Practical Nurse III 26.15 12100 - Medical Assistant 17.39 12130 - Medical Laboratory Technician 23.36 12160 - Medical Record Clerk 19.30 https://www.wdol.gov/wdol/scafiles/std/15-5635.txt?v=10 3/10
12190 - Medical Record Technician 21.60 12195 - Medical Transcriptionist 22.72 12210 - Nuclear Medicine Technologist 45.12 12221 - Nursing Assistant I 12.00 12222 - Nursing Assistant II 13.49 12223 - Nursing Assistant III 14.72 12224 - Nursing Assistant IV 16.52 12235 - Optical Dispenser 21.24 12236 - Optical Technician 19.36 12250 - Pharmacy Technician 17.71 12280 - Phlebotomist 19.09 12305 - Radiologic Technologist 37.15 12311 - Registered Nurse I 29.75 12312 - Registered Nurse II 35.92 12313 - Registered Nurse II, Specialist 35.92 12314 - Registered Nurse III 42.67 12315 - Registered Nurse III, Anesthetist 42.67 12316 - Registered Nurse IV 51.14 12317 - Scheduler (Drug and Alcohol Testing) 28.90 12320 - Substance Abuse Treatment Counselor 18.90 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 20.91 13012 - Exhibits Specialist II 25.91 13013 - Exhibits Specialist III 31.68 13041 - Illustrator I 23.23 13042 - Illustrator II 28.78 13043 - Illustrator III 35.20 13047 - Librarian 32.83 13050 - Library Aide/Clerk 14.91 13054 - Library Information Technology Systems 29.65 Administrator 13058 - Library Technician 20.85 13061 - Media Specialist I 21.39 13062 - Media Specialist II 23.94 13063 - Media Specialist III 26.68 13071 - Photographer I 16.33 13072 - Photographer II 18.44 13073 - Photographer III 22.63 13074 - Photographer IV 27.68 13075 - Photographer V 33.49 13090 - Technical Order Library Clerk 18.73 13110 - Video Teleconference Technician 19.48 14000 - Information Technology Occupations 14041 - Computer Operator I 17.02 14042 - Computer Operator II 19.04 14043 - Computer Operator III 21.22 14044 - Computer Operator IV 23.58 14045 - Computer Operator V 26.11 14071 - Computer Programmer I (see 1) 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 17.02 14160 - Personal Computer Support Technician 23.58 14170 - System Support Specialist 33.91 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 31.62 15020 - Aircrew Training Devices Instructor (Rated) 38.26 15030 - Air Crew Training Devices Instructor (Pilot) 45.86 15050 - Computer Based Training Specialist / Instructor 31.62 15060 - Educational Technologist 36.14 15070 - Flight Instructor (Pilot) 45.86 https://www.wdol.gov/wdol/scafiles/std/15-5635.txt?v=10 4/10
15080 - Graphic Artist 23.93 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 45.86 15086 - Maintenance Test Pilot, Rotary Wing 45.86 15088 - Non-Maintenance Test/Co-Pilot 45.86 15090 - Technical Instructor 27.52 15095 - Technical Instructor/Course Developer 33.68 15110 - Test Proctor 22.23 15120 - Tutor 22.23 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 12.09 16030 - Counter Attendant 12.09 16040 - Dry Cleaner 14.69 16070 - Finisher, Flatwork, Machine 12.09 16090 - Presser, Hand 12.09 16110 - Presser, Machine, Drycleaning 12.09 16130 - Presser, Machine, Shirts 12.09 16160 - Presser, Machine, Wearing Apparel, Laundry 12.09 16190 - Sewing Machine Operator 15.30 16220 - Tailor 15.92 16250 - Washer, Machine 12.96 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 21.93 19040 - Tool And Die Maker 25.80 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 19.50 21030 - Material Coordinator 24.21 21040 - Material Expediter 24.21 21050 - Material Handling Laborer 13.23 21071 - Order Filler 15.33 21080 - Production Line Worker (Food Processing) 19.50 21110 - Shipping Packer 15.91 21130 - Shipping/Receiving Clerk 15.91 21140 - Store Worker I 13.59 21150 - Stock Clerk 17.85 21210 - Tools And Parts Attendant 19.50 21410 - Warehouse Specialist 19.50 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 31.08 23019 - Aircraft Logs and Records Technician 25.05 23021 - Aircraft Mechanic I 29.93 23022 - Aircraft Mechanic II 31.08 23023 - Aircraft Mechanic III 32.18 23040 - Aircraft Mechanic Helper 21.85 23050 - Aircraft, Painter 28.05 23060 - Aircraft Servicer 25.05 23070 - Aircraft Survival Flight Equipment Technician 28.05 23080 - Aircraft Worker 26.48 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 26.48 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 29.93
II
23110 - Appliance Mechanic 23.50 23120 - Bicycle Repairer 17.07 23125 - Cable Splicer 34.74 23130 - Carpenter, Maintenance 24.62 23140 - Carpet Layer 19.97 23160 - Electrician, Maintenance 28.97 23181 - Electronics Technician Maintenance I 26.81 23182 - Electronics Technician Maintenance II 28.45 23183 - Electronics Technician Maintenance III 30.07 23260 - Fabric Worker 24.32 23290 - Fire Alarm System Mechanic 23.50 23310 - Fire…