AMENDMENT 5 - RFI + Proposal due date extension

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

x

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 7

2. AMENDMENT/MODIFICATION NUMBER

A0005

3. EFFECTIVE DATE

08/23/2019

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA FOREST SERVICE

PACIFIC SOUTHWEST REGION

1323 CLUB DRIVE

VALLEJO, CA 94592-1110

SAME AS ITEM 6.

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

1291S819R0028

9B. DATED (SEE ITEM 11)

07/26/2019

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 5 (A0005) is for the following:

1. RFI no. 36 – Provides additional information (pictures). RFI no. 59 – provides response. Includes additional Specification and Detail, attached. Included as RFP attachment no. 7. Section J replacement page 27 is attached.

2. Extends the proposal due date.

Offers/proposals are due NLT Wednesday, August 28, 2019. 9am/0900 PST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jeremy Bedner, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

08/23/2019 (Signature of person authorized to sign)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT A0005 08/23/2019

RFP 1291S819R0028

BIG BEAR DISCOVERY CENTER REMODEL

REQUEST FOR INFORMATION

59. Underground fiber optic cable installation called out on E1.2. ( Approx. 1400 LF) The drawings point to the specs for details. The specs on 27 00 00-37 section G reads “See 260400 for installation of fiber optic cable. This section is missing from the spec.

ANSWER: Revision to 100% design specification section 27 00 00, subsection 5.08, G-Under Ground Inter-Building Fiber Optic Cable and drawings E1.1 and E1.2:

1. Fiber optic cable shall also be a moisture resistant outside plant type filled (OSP), listed for direct burial or installation in underground conduit. Fiber optic cable shall be 12 strand 50/125 μm multimode (OM3). Fiber optic line shall be installed per the attached trench detail, attached specification section 26 04 00, and in accordance with NEC 2017. A tracer wire shall be installed per specification 26 04 00.

BIG BEAR DISCOVERY CENTER REMODEL

36. Is it possible to have the communication building opened and have someone take pictures of the equipment? This is where the fiber optic cable will run from to the fire station and up the hill to employee.

PER AMENDMENT 3: Communications room was opened during the prebid walk-through for attendees to inspect and photograph. Please email COR if you need photos of the Fire Riser/Elec.

Room #128.

PER AMENDMENT 5: Additional information provided – Pictures of Fire Riser/Elec. Room #128.

AMENDMENT 5

REPLACEMENT PAGE 27 of 45

MOUNTAINTOP RANGER DISTRICT, SAN BERNARDINO NATIONAL FOREST

PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENT

SECTION J – LIST OF ATTACHMENTS

J-1 LIST OF ATTACHMENTS (AGAR 452.252-70) (FEB 1988)

NUMBER

TITLE PAGES

1 Drawings – 100% Construction Documents 88

2 Specifications – 100% Construction Documents 950

3 Fire Plan 9

4 DOL Construction Wage Rates General Decision Number

CA20190026 05/03/2019

San Bernardino County

5 Past Performance Questionnaire 5

6 100% CDs Drawings, Sheets S1.0-4, S2.0, S3.0-2, S4.0-1 11

7 Specification 26 04 00 Underground Control Cable and Power Distribution + Fiber Trench Detail

SF-30 A5
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
A5 CONTINUATION
REPLACEMENT PAGE AMEND 5

File details come from the government source that posted it.