AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NUMBER

A0002

3. EFFECTIVE DATE

08/15/2019

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA FOREST SERVICE

PACIFIC SOUTHWEST REGION

1323 CLUB DRIVE

VALLEJO, CA 94592-1110

SAME AS ITEM 6.

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

1291S819R0028

9B. DATED (SEE ITEM 11)

07/26/2019

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 2 (A0002) is for the following:

1. Establishes the final date of RFI receipt/cutoff as NLT Tuesday, August 20, 2019, 1159pm PST.

2. Incorporates 100% Construction Documents, Specifications and Drawings. Listed in Section J Attachments 1-2. RFP replacement page 28 of 45 attached.

3. Provides the Site Visit sign-in sheet roster. Attached.

The offer due date/time is unchanged. Offers are due NLT Monday, August 26, 2019, 3pm/1500 PST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jeremy Bedner, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

08/15/2019 (Signature of person authorized to sign)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT A0002

RFP 1291S819R0028

BIG BEAR DISCOVERY CENTER REMODEL

Request for Information [RFI] final receipt / cut-off.

The Government shall review and respond to those RFIs received NLT Tuesday, August 13, 2019. Sent by close of day, 1159pm.

RFIs should be sent via email to both of the following:

Jeremy Bedner, Contracting Officer. Jeremy.bedner@usda.gov

Joshua Direen, Contracting Officer Representative/Engineer. Joshua.direen@usda.gov

AMENDMENT 2

REPLACEMENT PAGE 28 of 45

RFP 1291S819R0028

BIG BEAR DISCOVERY CENTER REMODEL

MOUNTAINTOP RANGER DISTRICT, SAN BERNARDINO NATIONAL FOREST

PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENT

SECTION J – LIST OF ATTACHMENTS

J-1 LIST OF ATTACHMENTS (AGAR 452.252-70) (FEB 1988)

NUMBER

TITLE PAGES

1 Drawings – 100% Construction Documents 88

2 Specifications – 100% Construction Documents 950

3 Fire Plan 9

4 DOL Construction Wage Rates General Decision Number

CA20190026 05/03/2019

San Bernardino County

5 Past Performance Questionnaire 5

SF-30 A2
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
continuation pages
replacement page A2
SV SIGN IN SHEET