Attachment 12 Plans - Kimberly Transformer - New Work.pdf
PDF 2 MB Posted
- Attached to
- New Farm Storage Building (Kimberly, ID)
- Solicitation number
- 12905B25R0005
About this file
This is an Electrical Single Line Diagram for a new work project at the USDA Agricultural Research Service's Northwest Irrigation & Soils Research Laboratory in Kimberly, Idaho. The detailed technical diagram shows the electrical infrastructure for multiple buildings including an irrigation lab, vehicle storage, storage barn, and shop repair and services area. The diagram includes specific electrical connections, transformer specifications, and power distribution details, with key notes indicating requirements such as replacing transformers, installing safety switches, and confirming feeder sizes. The document is designed by Merrick and dated 27 November 2024, with revision statuses noted for construction purposes, and includes a legend explaining electrical schematic symbols and notation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 Nov, 2024
Shane.Swafford Polygonal Line bnichols Callout POINT OF CONNECTION. PROVIDED UNDER SEPARATE CONTRACT. ASSUME LOCATED IN SE CORNER OF BUILDING 5 FOR BIDDING PURPOSES.
| Sheets and Views |
| DEMOLITION SINGLE LINE DIAGRAM JA-NEW E0 |
| DEMOLITION SINGLE LINE DIAGRAM JA-NEW E5 |
| DEMOLITION SINGLE LINE DIAGRAM JA-NEW E6 |
| DEMOLITION SINGLE LINE DIAGRAM JA-NEW E7 |