Attachment 8 Revised M-Sheet Drawings.pdf
PDF 322 KB Posted
- Attached to
- Pendleton Building Repairs Project A (Pendleton, OR) Federal contract opportunity
- Solicitation number
- 12905B25R0003
About this file
The file is a set of mechanical floor plan and demolition drawings for the Pendleton Building Repairs Project A located at 48037 Tubbs Ranch Road in Adams, Oregon. The drawings, prepared by Coffman Engineers, detail mechanical system modifications for Buildings 001 and 011, including demolition of existing equipment and installation of new fume hoods, exhaust fans, ductwork, and associated mechanical systems. Key technical details include the removal of existing boilers, fume hoods, and associated ductwork, with specific instructions for preservation and reinstallation of certain components like Phoenix electronic exhaust valves.
The mechanical drawings include comprehensive schedules for fans, HVAC condensing units, oil-fired boilers, and air control valves, specifying technical parameters such as airflow rates, electrical requirements, manufacturer specifications, and installation guidelines. Notable elements include new rooftop fume exhaust fans (FX-001-01, FX-001-02, FX-011-01) with specific requirements like chemical-resistant coatings, vertical discharge stacks, and variable frequency drives. The project appears to be part of a broader building repair initiative for the USDA Agricultural Research Service, with alternates for different scopes of work and careful considerations for existing infrastructure and future connectivity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_12905B25R0003.pdf | ||
| SF30_12905B25R0003_0003.pdf | ||
| Attachment 9 Hazardous Building Materials Inspection Report.pdf | ||
| SF30_12905B25R0003_0002.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| SF30_12905B25R0003_0001.pdf | ||
| Attachment 1 SF1442 Provisions_Clauses.pdf | ||
| Attachment 2 Contract Line-Item Breakdown Form Excel .xlsx | XLSX spreadsheet | |
| Attachment 5 DOL WD OR20250089_02282025.pdf | ||
| Attachment 7 ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf | ||
| Attachment 4 - Plans Drawings.pdf | ||
| Attachment 3 - Technical Specifications.pdf | ||
| Attachment 6 ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BE9-2553
E1-1054
BE9-2553
E1-1054 BE9-2552
BE9-2553
BE9-2552
BE9-2553
B E9 - 25 53
E 1- 10 54
B E9 - 25 53
E 1- 10 54
B E9 - 25 52
B E9 - 25 53
B E9 - 25 52
B E9 - 25 53
B E9 - 25 53
E 1- 10 54
B E9 - 25 53
E 1- 10 54
B E9 - 25 52
B E9 - 25 53
B E9 - 25 52
B E9 - 25 53
(E) B-1
DEMO FH-1 AND
12" EXHAUST
DUCT TO EF-3
DEMO FH-2 AND
12" EXHAUST DUCT
TO EF-4
(E) B-2
DEMO (E) BOILER
FLUE
(E) 4000 GALLON
ABOVE GROUND FUEL
OIL TANK TO REMAIN
(E) SUMP TO REMAIN
(E) HOT WATER PUMPS
TO REMAIN
(E) BRICK CHIMNEY
TO REMAIN
(E) BOILER TO
BE REMOVED
(E) FUEL OIL TANK
TO REMAIN
(E) BOILER TO
BE REMOVED
(E) FLOOR SINK
(E) FLOOR SINK
(E) EXPANSION TANK
(E) VACUUM PUMP
SEE PLUMBING
(ALTERNATE 01)
(E) VACUUM PUMP
RECEIVER TANK
(E) COMPRESSOR
(E) CHILLED WATER
TO REMAIN
(E) CHILLED WATER
PUMPS TO REMAIN
(E) FLOOR DRAIN
(E) AHU-1
TO REMAIN
VARIOUS (E) CONTROL
PLANES, (E) ELECTRICAL
PANELS ALONG WALL
DEMO (E) WATER HEATER
AS PART OF ALTERNATE 03
(E) HEAT EXCHANGER
TO REMAIN
(E) FUEL OIL PUMP
TO REMAIN
(E) FUEL OIL SUPPLY AND
RETURN PIPES TO BOILERS
EXHAUST UP
TO (E) EF
DEMO (E) BOILER
FLUE
(E) FUEL OIL SUPPLY
AND RETURN PIPES
TO ABOVE GROUND
TANK
(E) AHU-1INTAKE LOUVER
12x12 EXHAUST UP
TO (E) EF-1
(E) GLYCOL FEEDER
TO REMAIN
(E) HEV-001-02
GENERAL NOTES
A. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS AND THROUGH FIELD
OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY
APPLY TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT
ALLOWANCE TO COVER ANY DISCREPANCY BETWEEN THE
DRAWINGS AND THE ACTUAL CONDITIONS AS THEY
CURRENTLY EXIST.
B. EXISTING WORK IS SHOWN WITH LIGHT LINES AND DEMO
WORK IS SHOWN WITH BOLD BROKEN LINES, TYP.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF
ALL EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN
FOR FUTURE USE. DO NOT ABANDON ANY ITEMS IN PLACE.
D. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF
SYSTEMS WITH OWNER.
E. WORK SHOWN ON PLANS IS BASE BID UNLESS IDENTIFIED
OTHERWISE. SEE SHEET G-001 FOR ALTERNATE SCOPE
BREAKDOWN.
F. CONTRACTOR SHALL PERFORM PRE-CONSTRUCTION
AIRFLOW MEASUREMENTS OF EXISTING GENERAL EXHAUST
FANS TO DETERMINE POST-CONSTRUCTION SETPOINTS.
G. CONTRACTOR SHALL PERFORM PRE-CONSTRUCTION
AIRFLOW MEASUREMENTS (SUPPLY AND EXHAUST) FOR
LABORATORY ROOMS WITH FUME HOOD SCOPE.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:5
P
M
04/19/2024
TAH
RKC
231290
MD-101
BUILDING 001
MECHANICAL
FLOOR PLAN
DEMOLITION
PENDLETON
BUILDING
REPAIRS
PROJECT A
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/8" = 1'-0"MD-101
1 BUILDING 001 MECHANICAL FLOOR PLAN DEMOLITION
KEY NOTES
1 (E) FH-1 IS A PERCHLORIC ACID HOOD WITH STAINLESS STEEL
DUCTWORK AND A WASHDOWN SYSTEM. CONTRACTOR SHALL
TAKE APPROPRIATE MEASURES DURING DEMOLITION TO
PROTECT PROPERTY AND PERSONNEL.
2 DISCONNECT EXISTING AIR AND VACUUM LINES FROM THE
EXISTING HOOD. TEMPORARILY CAP FOR FUTURE CONNECTION
TO NEW HOOD.
3 FUME EXHAUST SYSTEM INCLUDES PHOENIX ELECTRONIC
EXHAUST VALVE. VALVES SHALL BE SAVED FOR
REINSTALLATION IN NEW HOOD DUCTWORK.
4 BELOW-ROOF DUCTWORK TO REMAIN, IT WILL CONNECT TO NEW
EXHAUST FAN (ALTERNATE 06).
5 CONTRACTOR SHALL PROTECT EXISTING FLOOR SINKS DURING
DEMO AND CONSTRUCTION. OIL, DEBRIS, ETC. COULD
CONTAMINATE SEPTIC SYSTEM/DRAIN FIELD.
6 EXISTING CHIMNEY TO REMAIN, SEAL ABOVE FROM WEATHER
AND SEAL OLD PENETRATION INTO MECHANICAL ROOM.
CHIMNEY WILL NOT BE RE-USED FOR THIS PROJECT.
7 ALL WORK ASSOCIATED WITH DEMOLITION OF EXISTING FUME
HOOD FH-2 IS IN ALTERNATE 09.
8 ALL WORK ASSOCIATED WITH DEMOLITION OF EXISTING FUME
HOOD FH-1 IS IN ALTERNATE 10.
9 DISCONNECT CONNECTIONS TO BOILER AND DEMO UTLITIES,
ELECTRICAL AND CONTROLS AS NECESSARY TO PERFORM NEW
INSTALLATION. REMOVE FUEL OIL PIPING BACK TO DAY TANK
LOCATED INSIDE MECHANICAL ROOM.
REV DATE DESCRIPTION
1 09/18/24 RE-ISSUE FOR BID
3 04/25/25 RE-ISSUE FOR BID
(E) FUME
HOOD
1 3
GENERAL NOTES
A. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS AND THROUGH FIELD
OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY APPLY
TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT ALLOWANCE
TO COVER ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE
ACTUAL CONDITIONS AS THEY CURRENTLY EXIST.
B. EXISTING WORK IS SHOWN WITH LIGHT LINES AND DEMO WORK IS
SHOWN WITH BOLD BROKEN LINES, TYP.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN FOR FUTURE
USE. DO NOT ABANDON ANY ITEMS IN PLACE.
D. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF SYSTEMS
WITH OWNER.
E. WORK SHOWN ON PLANS IS BASE BID UNLESS IDENTIFIED
OTHERWISE. SEE SHEET G-001 FOR ALTERNATE SCOPE
BREAKDOWN.
F. CONTRACTORS SHALL PERFORM PRE-CONSTRUCTION AIRFLOW
MEASUREMENTS (SUPPLY AND EXHAUST) FOR BUILDING.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:5
P
M
04/19/2024
TAH
RKC
231290
MD-104
BUILDING 011
MECHANICAL
FLOOR PLANS
DEMOLITION
PENDLETON
BUILDING
REPAIRS
PROJECT A
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/8" = 1'-0"MD-104
1 BUILDING 011 MECHANICAL FLOOR PLAN DEMOLITION
1/8" = 1'-0"MD-104
2 BUILDING 011 MECHANICAL ROOF PLAN DEMOLITION
(E) FUME
EXHAUST
FAN
KEY NOTES
1 DEMOLISH EXISTING FUME HOOD, FAN, AND DUCTWORK
COMPLETELY. DO NOT ABANDON ANY ITEMS IN PLACE.
2 DISCONNECT EXISTING AIR AND VACUUM LINES FROM THE
EXISTING HOOD. TEMPORARILY CAP FOR FUTURE CONNECTION TO
NEW HOOD.
3 ALL WORK ASSOCIATED WITH DEMOLITION OF EXISTING FUME
HOOD IS IN ALTERNATE 11.
REV DATE DESCRIPTION
1 09/18/24 RE-ISSUE FOR BID
3 04/25/25 RE-ISSUE FOR BID
BE9-2553
E1-1054
BE9-2553
E1-1054
BE9-2552
BE9-2553
BE9-2552
BE9-2553
B E9 - 25 53
E 1- 10 54
B E9 - 25 53
E 1- 10 54 B E9 - 25 52
B E9 - 25 53
B E9 - 25 52
B E9 - 25 53
B E9 - 25 53
E 1- 10 54
B E9 - 25 53
E 1- 10 54 B E9 - 25 52
B E9 - 25 53
B E9 - 25 52
B E9 - 25 53
UP
(N) FH-001-01
(N) FH-001-02
M-401
(E) AHU-1
TO REMAIN
CONNECT EXISTING
DUCT BELOW ROOF TO
(N) EF-001-01 ABOVE
(ALTERNATE 06)
CONNECT EXISTING
DUCT BELOW ROOF TO
(N) EF-001-02 ABOVE
(ALTERNATE 06)
CONNECT EXISTING DUCT BELOW
ROOF TO (N) RTU-001-01 ABOVE
(ALTERNATE 05)
(N) HEV-001-01
12" PVC
DUCTWORK
12" 316 SS
DUCTWORK
(E) HEV-001-02
GENERAL HVAC NOTES
A. WORK SHOWN ON PLANS IS BASE BID UNLESS IDENTIFIED
OTHERWISE. SEE SHEET G-001 FOR ALTERNATE SCOPE
BREAKDOWN.
B. REPLACEMENT ROOFTOP EQUIPMENT IS SHOWN ON M-102.
CONNECTIONS TO NEW AND EXISTING DUCTWORK ARE SHOWN
ON THIS SHEET.
C. SEE ENLARGED MECHANICAL ROOM PLAN ON SHEET M-401 FOR
SCOPE OF WORK WITHIN THE MECHANICAL ROOM.
D. CONTRACTOR SHALL ADJUST AIRFLOWS IN ROOMS WITH FUME
HOODS AND BALANCE TO PRE-CONSTRUCTION MEASURED FLOW
AND PRESSURE DIFFERENTIALS.
E. CONTRACTOR SHALL ADJUST HEATING WATER FLOWS TO PRE-
CONSTRUCTION MEASURED RATES.
F. TAB AND COMMISSIONING SCOPE SHALL FOLLOW THE SAME BASE
BID/ALTERNATE BREAKDOWN AS THE EQUIPMENT.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:5
P
M
04/19/2024
TAH
RKC
231290
M-101
BUILDING 001
MECHANICAL
FLOOR PLAN
PENDLETON
BUILDING
REPAIRS
PROJECT A
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/8" = 1'-0"M-101
1 BUILDING 001 MECHANICAL FLOOR PLAN
REV DATE DESCRIPTION
1 09/18/24 RE-ISSUE FOR BID
3 04/25/25 RE-ISSUE FOR BID
KEY NOTES
1 NEW FUME HOOD IS CONTRACTOR PROVIDED, CONTRACTOR
INSTALLED. COORDINATE FUME HOOD WITH OWNER AND
INSTALL IN THE LOCATIONS IDENTIFIED ON THE PLANS. INSTALL
NEW DUCTWORK ACCORDING TO MANUFACTURER'S
INSTRUCTIONS, FOLLOWING THE DEMOLISHED DUCT ROUTING
AND REUSING PENETRATIONS WHERE POSSIBLE. INSTALL THE
PHOENIX VALVES PRESERVED FROM DEMOLISHED DUCTWORK
IN NEW DUCT AND RE-CONNECT TO BAS.
2 ALL WORK ASSOCIATED WITH NEW FUME HOOD FH-001-02 IS IN
ALTERNATE 09.
3 ALL WORK ASSOCIATED WITH DEMOLITION OF EXISTING FUME
HOOD FH-001-01 IS IN ALTERNATE 10.
4 NEW FUME HOOD IS CONTRACTOR PROVIDED, CONTRACTOR
INSTALLED. COORDINATE FUME HOOD WITH OWNER AND
INSTALL IN THE LOCATIONS IDENTIFIED ON THE PLANS. INSTALL
NEW DUCTWORK ACCORDING TO MANUFACTURER'S
INSTRUCTIONS, FOLLOWING THE DEMOLISHED DUCT ROUTING
AND REUSING PENETRATIONS WHERE POSSIBLE. INSTALL THE
NEW PHOENIX VALVE IN NEW DUCT AND CONNECT TO BAS.
(N) FH-011-01
12" 316 STAINLESS
DUCTWORK
(N) HEV-011-01
(N) FX-011-01
12" 316 STAINLESS
DUCTWORK
GENERAL HVAC NOTES
A. WORK SHOWN ON PLANS IS BASE BID UNLESS IDENTIFIED
OTHERWISE. SEE SHEET G-001 FOR ALTERNATE SCOPE
BREAKDOWN.
B. CONTRACTOR SHALL PERFORM POST-CONSTRUCTION TAB
ON BUILDING HVAC TO ACHIEVE PRE-CONSTRUCTION
AIRFLOW MEASUREMENTS (SUPPLY AND EXHAUST).
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:5
P
M
04/19/2024
TAH
RKC
231290
M-104
BUILDING 011
MECHANICAL
FLOOR PLANS
PENDLETON
BUILDING
REPAIRS
PROJECT A
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/8" = 1'-0"
BUILDING 011 MECHANICAL FLOOR PLAN
1/8" = 1'-0"
BUILDING 011 MECHANICAL ROOF PLAN
KEY NOTES
1 NEW FUME HOOD IS CONTRACTOR PROVIDED,
CONTRACTOR INSTALLED. COORDINATE FUME HOOD
WITH OWNER AND INSTALL IN THE LOCATIONS IDENTIFIED
ON THE PLANS. INSTALL NEW DUCTWORK ACCORDING TO
MANUFACTURER'S INSTRUCTIONS, FOLLOWING THE
DEMOLISHED DUCT ROUTING AND REUSING
PENETRATIONS WHERE POSSIBLE. INSTALL THE NEW
PHOENIX VALVE IN NEW DUCT AND CONNECT TO BAS.
2 NEW FUME EXHAUST FANS SHALL BE LOCATED OVER 10'
MINIMUM FROM ANY BUILDING AIR INTAKES. FUME
EXHAUST FANS WILL HAVE VERTICAL STACKS MINIMUM
10' ABOVE ROOF LEVEL. PROVIDE WITH NEW ROOF CURB
INSTALLED ACCORDING TO MANUFACTURER'S
INSTRUCTIONS AND PLAN DETAILS ON M-501.
3 ALL WORK ASSOCIATED WITH NEW FUME HOOD FH-011-01
AND NEW EXHAUST FAN FX-011-01 IS IN ALERNATE 11.
REV DATE DESCRIPTION
1 09/18/24 RE-ISSUE FOR BID
3 04/25/25 RE-ISSUE FOR BID
DUCTWORK CONSTRUCTION AND LEAKAGE TESTING
SYSTEM
ROUND/ OVAL RECTANGULAR
REMARKSPRESS. CLASS
(IN WC)
DUCT SEAL
CLASS
PRESS. CLASS
(IN WC)
DUCT SEAL
CLASS
OA INTAKE FROM LOUVER
TO AHU
4 A 4 A
SUPPLY DUCT FROM AHU
TO TU
4 A 4 A
SUPPLY DUCT
DOWNSTREAM FROM TU
2 A 2 A
GENERAL EXHAUST DUCT
UPSTREAM OF ETU
2 A 2 A
GENERAL EXHAUST DUCT
FROM ETU TO FAN
4 A 4 A
GENERAL EXHAUST DUCT
FROM FAN TO LOUVER
4 A 4 A
SPECIALTY/FUME
EXHAUST DUCT
-4 A - - 1
SPECIALTY/FUME
EXHAUST DUCT
-4 A - - 2
1. WELDED 316L STAINLESS STEEL DUCTWORK.
2. TYPE 1 UNPLASTICIZED (RIGID) PVC DUCTWORK.
FAN SCHEDULE
TAG SERVES
MANUFACTURER/
MODEL
DESCRIPTION FAN PERFORMANCE
MOTOR ELECTRICAL REQUIREMENTS VFD
YES/NO
UNIT
WT.
(LBS)
REMARKS
TYPE DRIVE
TOTAL
CFM
ESP
(" WC)
SPEED
(RPM)
BHP
HP VOLTS Ø FLA
EF-001-01
BLDG 001
ANNEX
GREENHECK/
CUE-120-VG
ROOFTOP UPBLAST DIRECT 1,500 0.13 1,400 0.18 1/4 120 1 3.5 ECM 93 1,5,6
EF-001-02
BLDG 001
RESTROOMS
GREENHECK/
CUE-100-VG
ROOFTOP UPBLAST DIRECT 750 0.50 1,285 0.12 1/4 120 1 3.5 ECM 90 1,5,6
FX-001-01 FH-001-01
GREENHECK/
VEKTOR-H-10
ROOTOP FUME
EXHAUST
DIRECT 955 0.80 3,380 0.39 3/4 208 3 4.3 YES 462 1,2,3,4,6,7,9
FX-001-02 FH-001-02
GREENHECK/
VEKTOR-H-10
ROOTOP FUME
EXHAUST
DIRECT 955 0.80 3,380 0.39 3/4 208 3 4.3 YES 462 1,2,3,4,6,7,8
FX-011-01 FH-011-01
GREENHECK/
VEKTOR-H-10
ROOTOP FUME
EXHAUST
DIRECT 955 0.80 3,380 0.39 3/4 208 3 4.3 YES 462 1,2,3,4,6,7,10
1. FUME/EXHAUST FAN PROVIDE WITH ROOF CURB, BIRDSCREEN, VIBRATION ISOLATION, AND FACTORY MOUNTED DISCONNECT.
2. FUME HOOD EXHAUST FAN REQUIRES DISCHARGE STACK AT LEAST 10FT TALL AND MINIMUM NOZZLE DISCHARGE VELOCITY OF 3,000 FPM.
3. PROVIDE WITH SIDE-INLET CONNECTION. FAN IS NOT DIRECTLY LOCATED OVER ROOF PENETRATION FOR DUCTWORK.
4. FAN SHALL BE COATED WITH CHEMICAL RESISTANT COATING, BASIS-OF-DESIGN: GREENHECK HI-PRO POLYESTER OR HI-PRO-Z "LABCOAT".
5. FAN USES EC MOTOR WITH CONTROL DIAL FOR FAN BALANCING, BASIS-OF-DESIGN: VARI-GREEN.
6. PROVIDE WITH CONTROL DAMPER AND ACTUATOR, EITHER FACTORY INSTALLED OR SHIPPED LOOSE FOR FIELD INSTALL.
7. NEMA 4X VFD PROVIDED WITH FAN FOR FIELD INSTALLATION, BASIS-OF-DESIGN: ABB ACS255.
8. THIS FAN IS PART OF ALTERNATE 09.
9. THIS FAN IS PART OF ALTERNATE 10.
10. THIS FAN IS PART OF ALTERNATE 11.
HVAC CONDENSING UNIT SCHEDULE
TAG SERVES
MANUFACTURER/
MODEL
NOMINAL
CAPACITY
(TONS)
COOLING CAPACITY
# OF
CIRCUITS
REFRIG.
COMPRESSOR
LIQUID
CONN. (IN)
SUCTION
CONN. (IN)
UNIT POWER
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKSTOTAL
MBh
SEER2/
EER2
RATED AAT
(°F)
TYPE QTY RLA
(EA) VOLTS Ø MCA MOP
CU-003-01 AHU-003-01
DAIKIN/
DX6VSS3610
3 33.6
16.0/ 8.7
95 1 R-410A VAR. 1 16.8 3/8 7/8 208 1 23.9 25 143 1,2,3
CU-003-02 AHU-003-02
DAIKIN/
DX6VSS6010
5 53.0
15.8/ 8.0
95 1 R-410A VAR. 1 26.9 3/8 7/8 208 1 36.2 40 196 1,2,3
1. PROVIDE WITH EEV COIL FOR INSTALLATION WITH AIR HANDLING UNIT.
2. SPLIT CONDENSING UNIT PROVIDED FOR DX COIL IN ASSOCIATED AIR HANDLING UNIT. CONNECTED PIPING SHALL BE FIELD-INSTALLED BY THE MECHANICAL CONTRACTOR. AHU AND CU ARE ALTERNATE 01 SCOPE.
3. CONDENSING UNIT SHALL BE INSTALLED ON A STAND, MINIMUM OF 12" ABOVE GRADE LEVEL.
OIL-FIRED BOILER SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
BURNER
INPUT
(GPH OIL)
GROSS
OUTPUT
(MBh)
BOILER PERFORMANCE CONNECTIONS (IN) UNIT POWER
REQUIREMENTS
UNIT
WT.
(LBS)
FLUID REMARKS
EFF. % EWT (F) LWT (F)
FLOW
(GPM)
MIN.
FLOW
WPD
(FT)
FUEL
HWS/
HWR
FLUE
VENT VOLTS Ø FLA
B-001-01
BLDG 001
MECH RM
HEATING
WATER SYS
BURNHAM/
V908A
9.6 1,110 87% 140 180 56 56 5 #2 OIL 4 10 115 1 - 3503 WATER
1,2,3,4, 5,6,7,8
B-001-02
BLDG 001
MECH RM
HEATING
WATER SYS
BURNHAM/
V908A
9.6 1,110 87% 140 180 56 56 5 #2 OIL 4 10 115 1 - 3503 WATER
1,2,3,4, 5,6,7,8
1. PROVIDE LOW WATER CUT-OFF WITH MANUAL RESET AND HEADER SENSOR, WELL IMMERSION. PROVIDE MANUAL-RESET HIGH LIMIT AND LOW FIRE HOLD CONTROL.
2. PROVIDE WEISHAUPT HIGH EFFICIENCY #2 OIL BURNER (WL40Z-A) WITH CONTROL CABINET, MOTOR STARTER, DIRECT SPARK IGNITION, AIR FLOW SAFETY SWITCH, INTEGRAL OIL PUMP.
3. PROVIDE OIL STRAINER, OIL PRESSURE GAUGES, AND OIL TEST COCKS SHIPPED WITH BURNER.
4. PROVIDE UNIVERSAL COMMUNICATION GATEWAY AND CONNECT BOILER TO EXISTING ALERTON CONTROL SYSTEM. MINIMUM CONTROL POINTS: REMOTE ENABLE/DISABLE, TEMPERATURE SETPOINT, STATUS, FSG LOCKOUT/ALARM.
5. PROVIDE W/ASME CSD-1 CONTROLS AND COMPLIANT BOILER SHUTOFF SWITCH FOR EACH ENTRANCE TO THE MECHANICAL ROOM (TOTAL OF 2).
6. BOILERS ARE REDUNDANT, EACH IS SIZED FOR THE MAXIMUM HYDRONIC LOAD AND SHALL BE CAPABLE OF HANDLING THE BUILDING LOAD ALONE.
7. KNOCK-DOWN CONSTRUCTION BOILER, SHALL BE FIELD-ASSEMBLED IN BUILDING MECHANICAL ROOM.
8. PROVIDE BOILER WITH SINGLE ACTING BAROMETRIC DRAFT REGULATOR, BASIS-OF-DESIGN IS ENERVEX BDR-F, AS A PART OF THE UL LISTED VENTING SYSTEM.
AIR CONTROL VALVE SCHEDULE
TAG SERVES MANUFACTURER/ MODEL MATERIAL SIZE ORIENTATION
AIRFLOW
FAIL
POSITION
REMARKSMAX
CFM
MIN
CFM
APD
(" WC)
(N) HEV-001-01 FH-001-01
ANTEC/
VV
GALVANIZED
STEEL
114 VERTICAL 1195 0 0.12 OPEN 1, 2
(E) HEV-001-02 FH-001-02 - - - - - - - - 3
(N) HEV-011-01 FH-011-01
ANTEC/
VV
GALVANIZED
STEEL
114 VERTICAL 955 0 0.12 OPEN 1, 2
1. AIR CONTROL VALVE PROVIDED WITH NECESSARY CONTROL MODULE TO MEASURE AND ADJUST TO MAINTAIN SET ROOM PRESSURIZATION.
2. VALVE SHALL BE PROVIDED WITH FAST ACTING ACTUATOR CAPABLE OF CLOSING WITHIN 2 SECONDS OF SIGNAL.
3. VALVE IS EXISTING TO REMAIN. RE-TAG EXISTING VALVE IN BMS SYSTEM TO MATCH NEW TAG.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:5
P
M
04/19/2024
TAH
RKC
231290
M-602
MECHANICAL
SCHEDULES
PENDLETON
BUILDING
REPAIRS
PROJECT A
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
REV DATE DESCRIPTION
1 09/18/24 RE-ISSUE FOR BID
3 04/25/25 RE-ISSUE FOR BID
| Sheets |
| M-101 - BUILDING 001 MECHANICAL FLOOR PLAN |
| M-104 - BUILDING 011 MECHANICAL FLOOR PLANS |
| M-602 - MECHANICAL SCHEDULES |
| MD-101 - BUILDING 001 MECHANICAL FLOOR PLAN DEMOLITION |
| MD-104 - BUILDING 011 MECHANICAL FLOOR PLANS DEMOLITION |