AMD0001 - Dubois 66 and 92 Specifications - Amended 04222024.pdf
PDF 3 MB Posted
- Attached to
- Building 92 and 66 renovation in Dubois, ID
- Solicitation number
- 12905B24R0008
About this file
This document is a solicitation for the renovation of Buildings 92 and 66 at the USDA ARS Range Sheep Production Efficiency Research Unit in Dubois, Idaho. The work includes complete demolition of existing interior functions and installation of new roofing, siding, electrical, HVAC, plumbing, and interior spaces. The solicitation has a base bid for renovating Building 92 and an alternate bid for renovating Building 66. An organized site visit is scheduled for April 17, 2024 at 10:00am Mountain Time. Interested bidders must pre-register by April 16, 2024 and provide the names of attendees. Bids are due under Solicitation Number 12905B24R0008, issued by the Department of Agriculture Agricultural Research Service. The solicitation provides detailed specifications and requirements for the renovation work.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REMODEL OF BUILDING 92 & 66
RANGE SHEEP PRODUCTION EFFICIENCY RESEARCH UNIT
DUBOIS, IDAHO
Contract Number 12905B23F0045
CD DESIGN SUBMISSION
NOVEMBER 21, 2023
REMODEL OF BUILDINGS 92 & 66
RANGE SHEEP PRODUCTION EFFICIENCY RESEARCH UNIT
DUBOIS, IDAHO
Dubois Building 92 and Building 66 Remodel USDAARSDSPWB
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01 01/20 WARRANTY OF CONSTRUCTION
01 00 11 GENERAL PARAGRAPHS
01 00 21 CONTRACTOR QUALITY CONTROL
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 50 00 PROJECT CLOSEOUT
01 57 50 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLOTION AND DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 36 13 08/20 SECTIONAL OVERHEAD DOORS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 51 00 08/20 ACOUSTICAL CEILINGS
PROJECT TABLE OF CONTENTS Page 2
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
DIVISION 12 - FURNISHINGS
12 31 00 08/16, CHG 2: 11/18 METAL CASEWORK
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 02/23 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 31 13.00 40 08/22 METAL DUCTS
23 37 13.00 40 08/22 DIFFUSERS, REGISTERS, AND GRILLES
23 41 13.00 40 02/23 PANEL FILTERS
23 74 33.00 40 05/17 PACKAGED, OUTDOOR, HEATING AND COOLING
MAKEUP AIR-CONDITIONERS
23 82 43.00 40 05/17 ELECTRIC DUCT HEATERS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26.00
16.00
08/19
08/19
GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
PANELBOARDS
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 52 00.00 40 11/17 EMERGENCY LIGHTING
26 53 00.00 40 11/15 EXIT SIGNS
DIVISION
- COMMUNICATIONS
27 10 00
08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 31 - EARTHWORK
31 23 00.00
02/11, CHG 2: 08/15
EXCAVATION AND FILL
PROJECT TABLE OF CONTENTS Page 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 26 11/21 WIRE FENCES AND GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
-- End of Project Table of Contents --
Dubois Building 92 and Building 66 USDAARSDSPWB
THIS PAGE INTENTIONALLY LEFT BLANK
Dubois Building 92 and Building 66
Remodel
USDAARSDSPWB
SECTION 01 00 01
SECTION 01 00 01 Page 1
PART 1 GENERAL
WARRANTY OF CONSTRUCTION
01/20
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The
Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the
Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the
Government, be enforced by the Contractor for the benefit of the
Government. In such case, if the Contractor's warranty under paragraph
1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturer's, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer, the
Contractor shall require any such warranties to be executed in writing to the Government.
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud.
SECTION 01 00 01 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
-- End of Section --
SECTION 01 00 11 Page 3
SECTION 01 00 11
GENERAL PARAGRAPHS
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for USDA Tree Fruit Lab Research Facility in Wenatchee in
Wenatchee, WA. Bidder shall provide Base Bid pricing and Alternate pricing as defined in the contract documents.
1.1.2 Location
The site of work is at the USDA ARS Range Sheep Production
Efficiency Research Unit, DuBois, ID
1.1.3 Principal Features of Work
BASE BID:
Building 92 – METABOLISM BARN RENOVATION will include the following items:
Building 92 is pre-engineered metal building and was constructed in 1979. Project includes renovating the Metabolism Barn to reconfigure interior spaces into accommodate the science functions contained in building 62 to a more efficient layout.
Work will include complete demolition of all existing interior functions ie: all electrical, mechanical, plumbing, and animal pens. Work will also removal and installation of new metal roofing with insulation, the removal and installation exterior metal siding with new insulation. Reconfigured interior space will include 3 new workrooms, a chem lab, new electrical service and distribution, IT, Led lighting, access control, new HVAC, new plumbing, and new septic system.
ALTERNATE#1:
Building 66 - GREENHOUSE RENOVATION will include the following items:
Building 66 is the Physiology Lab building and was constructed in 1975. The project includes complete demolition of existing functions except for the restroom and have the building converted to cold storage. There will be new LED lighting and new overhead door .
Peter.Lane Cross-Out
Peter.Lane Cross-Out
SECTION 01 00 11 Page 4
1.2 SITE VISIT
A site visit and inspection tour will be held at USDA Tree Fruit Lab
Research Facility in Wenatchee, WA. All potential bidders will be notified of the exact time and date and are strongly urged to attend the site visit. Inspection may only be made at this time, unless prior written approval is obtained to inspect at another date and time.
Contact:
USDA, ARS, U.S. Sheep Experiment Station
Attn: Jennifer Barnett
Administrative Officer
Dubois, ID 83423 jennifer.barnett@usda.gov
Tel: 208-374-5306
Fax: 208-374-5582
1.3 COORDINATION OF WORK
1. Work space and space available for storing materials shall be subject to the approval of the Contracting Officer. Do not store materials and equipment in other than assigned areas.
2. Execute work to interfere as little as possible with normal functioning of the facility, including operations of utility services and any existing equipment, and with work being done by others.
3. Minimize interference of construction activities with the flow of traffic by keeping roads, walks and entrances to grounds, to parking areas and to occupied areas of buildings clear of construction materials, debris, construction equipment and vehicles except where noted on plans or in specifications. Provide unobstructed access to areas required to remain in operation.
4. The Contractor shall complete all work within 180 consecutive calendar days after Notice to Proceed. Within 14 calendar days after
Contract Award, the Contractor shall provide the Government with a detailed schedule of dates on which the Contractor plans to accomplish the work. In addition, the Contractor shall notify the Contracting Officer 20 days in advance of starting work. A planned work schedule shall be submitted to the
Contracting Officer for approval. The schedule shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. This schedule shall be updated monthly and submitted to the
Contracting Officer for approval.
5. The Contractor shall take all measures and provide all material necessary for protecting existing equipment, property, and ongoing operations in affected areas of construction against dust, noise and debris.
6. Power sources for the Contractor's operations will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of the Government's
SECTION 01 00 11 Page 5 facilities. Water sources will be available and supplied by the
Government to the Contractor as long as its use does not interfere with the operations of any building. The Contractor is responsible for extending utility sources to his work locations. Such extensions shall be removed after work is completed, to the satisfaction of the
Contracting Officer.
7. All references in the specifications to the Contracting Officer and Contracting Officer's Representative shall constitute referrals initially to the Contracting Officer's Representative.
8. Contractor shall provide sanitary facilities for use by his employees and the employees of his subcontractors working on job site.
1.4 DRAWINGS
All dimensions shown of existing work and all dimensions required for work that is to be connected with existing work shall be verified by the
Contractor by actual field measurements. Any work at variance with that specified or shown on the drawings, shall not be performed by the
Contractor until the Contractor has received approval in writing from the
1.5 MATERIAL SAFETY DATA SHEETS (MSDS)
Material Safety Data Sheets must be submitted to the Contracting Officer prior to the commencement of any work with any substance that may be considered hazardous.
1.6 UTILITIES OR STRUCTURAL ITEMS CONFLICTING WITH PROPOSED CONSTRUCTION
In the event the Contractor finds an area where existing utilities or structural items conflict with proposed construction, the Contracting
Officer shall be notified immediately. The Contractor shall then propose a method of solving the problem. Work shall not resume in the problem area until the Contractor has received written approval from the
Contracting Officer. There shall be no additional cost to the Government.
1.7 ACCEPTANCE OF WORK
1. Final inspection will not be made until the contract work is completed. The Contractor shall notify in writing the
Contracting Officer fifteen working days prior to the date on which the work will be ready for final inspection.
2 Final inspection and acceptance of the work shown by the drawings and specifications forming a part of this contract shall not be binding or conclusive on the Government if it shall be shown that (1) the Contractor has willfully or through collusion with persons or firms engaged in the performance of the contract supplied inferior materials, equipment, or workmanship, or (2) the Contractor has otherwise departed from the terms of the contract.
SECTION 01 00 21 Page 1
1.1 GENERAL
SECTION 01 00 21
CONTRACTOR QUALITY CONTROL
This section covers the quality control inspection, sampling, and testing of all materials, services, and workmanship required to be performed by the contract drawings, specifications, and other contract requirements.
The Contractor shall perform all quality control inspection, sampling, and testing required by this contract and shall review and certify that each submittal is correct and in strict conformance with the contract drawings and specifications for all shop drawings and lists of materials, fixtures, and equipment. All work performed under this contract shall be in strict accordance with procedures and requirements detailed on the plans and specifications.
1.1.1 Certificate of Compliance
Upon completion of the contract work and prior to final acceptance, the
Contractor shall submit to the Contracting Officer a certificate of compliance which states that all materials, equipment, design, and workmanship incorporated in the work are in strict compliance with contract drawings and specifications except for approved deviations. The certificates of compliance shall be signed and dated by both the manufacturer's representative and the Contractor. Based upon this certificate of compliance and other contract requirements, the Contractor shall be responsible for correcting at his expense any defects, omissions, and deviations (other than those previously approved) which are detected during the contract period or during the one-year warranty period as defined in Section 01 00 01, WARRANTY OF CONSTRUCTION.
1.2 INSPECTION
The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
1.3 REVIEW AND APPROVAL OF SHOP DRAWINGS, SUBMITTALS, MATERIALS, FIXTURES,
AND EQUIPMENT
1. Prior to submission to the Government for approval, the Contractor shall review and certify that all shop drawings, submittals, lists of materials, fixtures, and equipment as called for under the various headings of these specifications are correct and in strict compliance with the contract drawings and specifications. These drawings, submittals and lists shall be accurate, complete, and adequately detailed. The top copy of data comprising each item listed on the transmittal form shall be identified as having received the quality control inspector's approval by being so stamped, signed and dated.
Approval of shop drawings, submittals, materials, fixtures, and equipment by the Contracting Officer will not relieve the Contractor of the responsibility for any errors which may exist, and the
Contractor shall be responsible for the satisfactory construction of all work. All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification, and upon being approved, stored at the site of the
SECTION 01 00 21 Page 2 work for jobsite use until all work has been accepted by the
Contracting Officer. The Contractor shall provide four (4) sets of all shop drawings.
2. All proposed deviations required by the Contractor shall be noted in the "Remarks" column of the Form. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the shop drawing. The Government reserves the right to rescind inadvertent approval of shop drawings containing unnoted deviations.
1.4 DAILY RECORDS
The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format. These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered;
problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action; and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer daily, legible copies of all inspection records for his permanent retention. The daily records of inspections shall cover all work placement subsequent to the previous report and shall be verified by the Contractor's designated representative.
1.5 RECURRING DEFICIENCIES
If recurring deficiencies in an item or items being inspected by the
Contractor indicate that the inspection system is not providing adequate quality control, the Contractor shall take such corrective measures as deemed necessary by the Contracting Officer.
1.6 CONFLICTS
In the event of a difference of opinion between the Contractor and the
Contracting Officer, the Contracting Officer shall govern.
SECTION 01 33 00 Page 1
1.1 SHOP DRAWINGS
SECTION 01 33 00
SUBMITTAL PROCEDURES
The Contractor shall furnish the Contracting Officer two copies with such promptness as to cause no delay in this work or the work of any other contractors, one sepia copy of the shop drawings as required for the various subheadings for the Contracting Officer's approval. Shop drawings of any other subcontractor should be reviewed and approved by each subcontractor where their contract work meets or interferes with that of another subcontractor.
The Contracting Officer's approval, however, shall not relieve the
Contractor from responsibility for errors in shop drawings. Shop drawings are the instruments of the Contractor, not the Contracting Officer; the
Drawings and Specifications shall always be final.
1.2 SAMPLES
Within and not later than thirty (30) days from the date of the General
Contract, the General Contractor shall have secured and submitted to the
Contracting Officer or his/her representative for consideration, two samples of each kind and grade of materials and finish as noted under the various headings of the specifications. These samples shall be finished completely and shall accurately represent the work as it is proposed to be installed. The Contracting Officer will give immediate consideration to such samples and shall notify the General Contractor within ten (10) days after receipt of either approval or rejection. If such samples are rejected, the General Contractor shall, without delay, submit corrected samples for approval, and shall continue to do so until such approval is given the Contracting Officer. All approvals will be given by the
Contracting Officer to the General Contractor in writing.
It shall be the Contractor's responsibility to obtain materials at such time as to cause no delay to the project. No allowance for additional time nor substitution of approved materials will be allowed for
Contractor's negligence in late ordering of materials.
1.3 PRODUCT DATA
Submit two copies of preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer's descriptive literature, catalog data, and other data to illustrate portion of work.
1.4 O & M MANUALS
O & M Manuals shall be submitted in accordance with Section 01 78 23
OPERATION AND MAINTENANCE DATA.
1.5 GOVERNMENT ACTIONS POSSIBLE
Submittals will be returned to the Contractor with one of the following notations:
SECTION 01 33 00 Page 2
a. Submittals marked "reviewed" or "approved as submitted" authorize Contractor to proceed with work covered.
b. Submittals marked "approved as noted" or "approved except as noted";
resubmission not required, authorize Contractor to proceed with work as noted provided the Contractor takes no exception to the notations.
c. Submittals marked "revise and resubmit" or "disapproved" indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
1.6 SUBMITTAL REGISTER
Contractor shall submit items as listed in each specification section.
Not Used
End of Section --rebeccabehrens Architect Submittals should be digital (pdfs) sent via email unless a physical sample(s) is requested to be reviewed for color selection or color/texture approved by government as noted in submittal register.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 31 PAGES
DuBois Building Remodels
01 11 00 SD-01 Preconstruction Submittals
1.7.1Utility Outage Requests
1.7.1Utility Connection Requests
1.7.2Borrow Permits
1.7.2Excavation Permits
1.7.2Welding Permits
1.7.2Burning Permits
1.12 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.11.1Meal Signature Record Book
(MSRB)
1.11.2Dining And Lodging
Requirements
1.11.3Housing Plan
1.11.4Medical Plan
1.8Contractor Regulations
1.12Transportation of Personnel, Materials, and Equipment
1.12.2Purchase Orders
1.5.1.1List of Contact Personnel
1.6.18.1Personnel List
1.6.20Personnel List
1.6.21.1.1Entry Approval for Employees
SD-07 Certificates
1.7.7.1Proof of IMD Ordnance Work
Authorization
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 31 PAGES
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan (APP)
1.8 GAccident Prevention Plan (APP)
1.8 GAccident Prevention Plan (APP)
1.8 GAccident Prevention Plan (APP)
1.8.1 GAPP - Construction
1.19 GDive Operations Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
1.17Gas Protection
SD-07 Certificates
1.5Contractor Safety Self-Evaluation
Checklist
1.7.1.6Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
1.8.3.3 GCritical Lift Plan
1.8.3.4 GNaval Architecture Analysis
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 31 PAGES
01 35 26 1.13.5Third Party Certification of
Floating Cranes and
Barge-Mounted Mobile Cranes
1.15License Certificates
1.15.1 GRadiography Operation Planning
Work Sheet
1.15.1 GPortable Gauge Operations
Planning Worksheet
3.8.3Machinery & Mechanized
Equipment Certification Form
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-03 Product Data
1.4 GBackflow Preventers
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 31 PAGES
01 50 00 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.2.1.1 GWaste Originator Training
Certification
1.5.2.1.2 GWaste Originator Training
Certification
1.5.2.3.4 GPSCAA Nonroad Engine
Notification Form
1.5.2.3.6 GNotice of Construction
1.5.3.1Dewatering Permit
1.5.3.1Florida Environmental Resource
Permit
1.5.3.1.2.1GExcavation Permits
1.5.3.3.1.1GExcavation Permits
1.5.5.1.2 GStorage Material Inventory
1.6.1Preconstruction Survey
1.6.2 GRegulatory Notifications
1.6.4 GEnvironmental Manager
Qualifications
1.6.5 GEmployee Training Records
1.7 GEnvironmental Protection Plan
1.7.9.2 GDirt and Dust Control Plan
1.11 GSolid Waste Management Permit
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2 GStormwater Notice of Intent
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 31 PAGES
01 57 19 3.15.2 GSpill Prevention Control And
Countermeasure (SPCC) Plan
3.21.16.1Project Report
3.21.16.1Project Report
3.21.17Contractor's Operation and
Maintenance (O & M) Plan
SD-06 Test Reports
1.11.1 GMonthly Solid Waste Disposal
Report
3.2.1.3Inspection Reports
3.7.1.1.2Laboratory Analysis
SD-07 Certificates
1.4.1.2 GECATTS Certificate Of
Completion
1.6.5 GEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector
1.6.5.1Certificate of Competency
3.21.1.4 GStorm Drain and Sanitary Sewer
Discharge Approval
3.21.4Monthly Project Waste Summary
Report
3.21.7 GLandfill Disposal Form
3.21.14.2 GDangerous Waste Profile
3.21.14.2 GDangerous Waste Manifests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 31 PAGES
01 57 19 3.21.14.6 GContractor Request for 45/90-Day
Hazardous Waste Accumulation
Certification/Recertification
3.21.14.6 GContractor Request for
Hazardous Waste Satellite
Accumulation Area (SAA)
Registration
3.21.14.6Accumulation Area Inspection
Record
3.21.14.6Hazardous Waste Accumulation
Area Registration Form
3.21.14.5 GCertificate Of Final Disposal
SD-11 Closeout Submittals
1.5.2.2 GRefrigerant Work Checklist
1.5.2.3.1 GRefuse and Recycle Quantity
Form
3.21.16.3 GProject Completion Report
3.21.17Operation and Maintenance
Records
1.5.2.3.6Notice of Completion
3.21.4Solid Waste Tracking Sheet
1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
1.11 GSolid Waste Management Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 31 PAGES
01 57 19 3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.2.1.5As-Built Topographic Survey
3.7.1 GWaste Determination
Documentation
3.21.8 GWaste Determination
Documentation
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
3.8.1 GContractor Hazardous Material
Inventory Log
3.22.1.2 GHazardous Waste Inspection
Logs
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GFacility Data Workbook
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 31 PAGES
01 78 23 3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
02 41 00 SD-01 Preconstruction Submittals
1.2.12 GDeconstruction Plan
Hazard Abatement Plan;
03 30 00 SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.3.1Cementitious Materials
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.2.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 31 PAGES
03 30 00 SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.2Aggregates
3.12.2.3 GCompressive Strength Tests
SD-08 Manufacturer’s Instructions
2.4.2.1Liquid Chemical Floor Hardeners and Sealers
2.4.1Curing Compound
05 40 00 SD-03 Product Data
2.1Studs, Joists
06 41 16.00 10 SD-02 Shop Drawings
2.8 GShop Drawings
SD-04 Samples
Plastic Laminates; G
Cabinet Hardware; G
SD-07 Certificates
1.4Quality Assurance
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
GDetail Fabrication Drawings
SD-03 Product Data
2.1.1 GSolid Polymer
SD-04 Samples
2.3.4 GCounter Tops
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 31 PAGES
06 61 16 2.1.1Indoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
SD-11 Closeout Submittals
GWarranties
07 22 00 SD-02 Shop Drawings
Installer Certification
Product Certificates
SD-03 Product Data
2.1Insulation
SD-08 Manufacturer’s Instructions
2.3Fasteners
2.1Insulation
07 27 19.01 SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
SD-06 Test Reports
1.6 GField Peel Adhesion Test
GAir Barrier Testing
SD-07 Certificates
1.4Self-adhering Air Barrier
1.7.1Qualifications Of Manufacturer
1.7.2Qualifications Of Installer
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 31 PAGES
07 27 19.01 1.4Self-adhering Air Barrier
2.2Primers, Adhesives, and Mastics
07 41 13 SD-02 Shop Drawings
1.4.4 GRoofing Panels
SD-03 Product Data
2.1 GRoof Panels
1.4.4 GFactory-Applied Color Finish
2.4Accessories
1.4.4Pressure Sensitive Tape
2.7Underlayments
2.8Gaskets and Sealing/Insulating
Compounds
SD-04 Samples
2.1 GRoof Panels
1.4.4 GFactory-applied Color Finish
SD-05 Design Data
1.4.5Engineering Calculations
1.2.1.2Wind Uplift Resistance
SD-06 Test Reports
2.2Factory Finish and Color
Performance Requirements
SD-07 Certificates
2.1Roof Panels
2.7.1Self-Adhering Modified Bitumen
Underlayment
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 31 PAGES
07 41 13 1.4.4Installation Manual
SD-11 Closeout Submittals
1.8Warranties
07 42 13 SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GWall Panels
Factory Color Finish; G
1.5.5Closure Materials
2.4.3.1Sealants and Caulking
1.5.5Accessories
2.4Accessories
SD-04 Samples
GColor chart
SD-05 Design Data
1.5.1.2Wind load design analysis
SD-08 Manufacturer’s Instructions
3.3Installation
SD-11 Closeout Submittals
1.8Warranty
1.5.6Maintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material
07 60 00 SD-02 Shop Drawings
2.1.1Exposed Sheet Metal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 31 PAGES
07 60 00 3.1.15 GFlashing at Roof Penetrations and Equipment Supports
3.1.13 GEave Flashing
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.4Backstops
2.3Bond Breakers
SD-06 Test Reports
3.1Field Adhesion
SD-07 Certificates
2.1.1Indoor Air Quality For Interior
Sealants
2.5Indoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 31 PAGES
08 11 13 2.5 GFrames
2.5 GFrames
Accessories; G
SD-03 Product Data
2.1 GDoors
2.3 GAccessories
2.5 GFrames
08 36 13 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.6 GElectric Operators
SD-08 Manufacturer’s Instructions
2.2Doors
SD-10 Operation and Maintenance
Data
2.2Doors
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.6 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 31 PAGES
08 71 00 SD-10 Operation and Maintenance
Data
1.5Hardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-02 Shop Drawings
Glazing Panels; G
SD-03 Product Data
GGlazing Panels
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.6.1Glass Units
09 29 00 SD-03 Product Data
2.1.7Accessories
2.1.1Gypsum Board
2.1.4VOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1Indoor Air Quality for Gypsum
Board
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 31 PAGES
09 29 00 2.1Manufacturer Maintenance
Instructions
09 51 00 SD-03 Product Data
GAcoustical Ceiling Systems
SD-04 Samples
Ceiling Tile Pattern / Color
Sample; G
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Type IV
Ceiling Tiles
SD-11 Closeout Submittals
Warranty
09 90 00 SD-03 Product Data
2.1Product Data Sheets
SD-04 Samples
Paint Color Sample for each color
(4'x4' minimum)
SD-07 Certificates
1.6.3Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
Application Instructions
2.1Mixing
1.8.1Manufacturer's Safety Data
Sheets
10 14 00.20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 31 PAGES
10 14 00.20 1.3.1 GDetail Drawings
SD-03 Product Data
2.1Exit Door Tactile Sign
SD-10 Operation and Maintenance
Data
3.1Approved Manufacturer's
Instructions
3.1.2Protection and Cleaning
10 26 00 SD-03 Product Data
2.3 GWall Covering and Panels
SD-04 Samples
2.3 GWall Covering and Panels
SD-07 Certificates
2.6Indoor air quality for adhesives
SD-10 Operation and Maintenance
Data
2.3Wall Covering and Panels
SD-11 Closeout Submittals
Warranties
10 28 13 SD-02 Shop Drawings
2.1 GProduct Schedule
SD-03 Product Data
2.1.3 GItem A5080
2.1.4 GItem A5090
2.1.5 GItem A5109
2.1.6 GItem A5135
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 31 PAGES
10 28 13 GItem A5200
SD-10 Operation and Maintenance
Data
2.1.3Item A5080
2.1.4Item A5090
2.1.5Item A5109
2.1.6Item A5135
Item A5200
12 31 00 SD-02 Shop Drawings
2.1Detail Drawings
SD-03 Product Data
2.1Casework
SD-04 Samples
2.1Casework
3.1.2Countertops
SD-08 Manufacturer’s Instructions
2.1Installation
SD-11 Closeout Submittals
Warranty
22 00 00 SD-03 Product Data
2.1 SRecycled Content for Cast Iron
Pipe
3.7.1.1 GBackflow Prevention Assemblies
2.4.1 SWaterSense Label for Lavatory
Faucet
2.4Fixtures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 31 PAGES
22 00 00 2.4.3Flush Tank Water Closets
2.4.3 SWaterSense Label for Flush Tank
Water Closet
2.4.4Wall Hung Lavatories
2.4.5Kitchen Sinks
Service Sinks
2.9 GPumps
3.7.1Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
3.7.1.1 GTest of Backflow Prevention
Assemblies
SD-10 Operation and Maintenance
Data
3.7.1 GPlumbing System
22 07 19.00 40 SD-03 Product Data
2.3 GAdhesives
2.3 GCoatings
2.3 GInsulating Cement
2.3 GInsulation Materials
GJacketing
2.3 GTape
SD-08 Manufacturer’s Instructions
3.1 GInstallation Manual
SD-11 Closeout Submittals
3.4Record Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 31 PAGES
22 07 19.00 40 2.3 SAdhesives
2.3 SCoatings
2.3 SInsulation Materials
1.3.1 SRecycled Materials
23 05 93 SD-01 Preconstruction Submittals
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.8.1 GTAB Firm
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.5.1.3 GTAB Related HVAC Submittals
1.5.8.4 GTAB Related HVAC Submittals
1.5.6 GTAB Procedures
1.5.6 GCalibration
1.3.2 GSystems Readiness Check
1.5.9 GTAB Execution
GTAB Verification
SD-06 Test Reports
3.3.4.1 GProportional Balancing
1.5.3.1 GTAB Design Review Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 31 PAGES
23 05 93 1.5.5 GInstrument Calibration
Certificates
23 07 00 SD-02 Shop Drawings
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
23 08 00.00 20 SD-03 Product Data
2.1 GTest Equipment
SD-06 Test Reports
3.7 GFull-Load Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 31 PAGES
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
1.7.3 GProgramming Software
1.7.4 GController Application Programs
1.7.1 GConfiguration Software
1.7.2 GController Configuration Settings
1.1.2.3 GProprietary Multi-Split
Engineering Tool Software
2.2 GManufacturer's Product Data
2.2.1 GXIF files
GFinal LNS Database
1.7.5 GNiagara Framework Supervisory
Gateway Backups
1.7.6 GNiagara Framework Engineering
Tool
GNiagara Framework Wizards
SD-05 Design Data
Boiler Or Chiller Plant Gateway
Request
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 31 PAGES
23 09 00 3.6.5 GControl Contractor’s Performance
Verification Testing Plan
3.6.3.1 GEquipment Supplier’s
Performance Verification Testing
Plan
3.6.8.3 GEndurance Testing Results
3.6.9 GPerformance Verification Test
Report
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.6.1 GPassword Summary Report
1.8.1 GCloseout Quality Control (QC)
Checklist
23 23 00 SD-03 Product Data
2.3Refrigerant Piping System
Qualifications
3.5Refrigerant Piping Tests
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 31 PAGES
23 23 00 SD-10 Operation and Maintenance
Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 30 00 SD-03 Product Data
2.4.1.1Insulated Nonmetallic Flexible
Duct Runouts
2.4.1.1Duct Connectors
2.4.2 GDuct Access Doors
2.4.3 GManual Balancing Dampers
2.4.4 GManual Balancing Dampers
2.4.7.1Diffusers
2.4.7.3Registers and Grilles
2.5.1.3Ceiling Exhaust Fans
2.5.1.3 SPL-109-58 label for ceiling
exhaust fan product
2.6 GEnergy Recovery Devices
1.4.4Test Procedures
SIndoor Air Quality for Duct
Sealants
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 31 PAGES
23 30 00 3.8.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.8.1 GOperation and Maintenance
Manuals
2.4.3 GManual Balancing Dampers
2.4.4 GManual Balancing Dampers
2.5.1.3 GCeiling Exhaust Fans
GReheat Units
2.6 GEnergy Recovery Devices
23 31 13.00 40 SD-03 Product Data
2.2.1 GRound Sheet Metal Duct Fittings
2.2.9Flexible Duct Materials
2.2.10 GManual Volume Dampers
SD-11 Closeout Submittals
3.5.2 GRecord Drawings
23 37 13.00 40 SD-03 Product Data
2.1 GEquipment and Performance
Data
23 41…
This is the start of the file's text. The full file is on GovTribe.