AMD0001 - 12905B24R0008 - RFI Log_04-19-2024 copy.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Building 92 and 66 renovation in Dubois, ID
Solicitation number
12905B24R0008
Issued by

About this file

This document is an RFI (Request for Information) Log related to Solicitation Number 12905B24R0008 for the renovation of Buildings 92 and 66 at the USDA ARS Range Sheep Production Efficiency Research Unit in Dubois, ID. The key details are:

The work includes complete demolition of existing interior functions, removal and installation of new metal roofing and siding with insulation, and reconfiguration of the interior space to include 3 new workrooms, a chem lab, new electrical service and distribution, IT, LED lighting, access control, new HVAC, new plumbing, and a new septic system. An organized site visit was held on April 17, 2024. The RFI Log covers questions related to the site visit, HVAC and ductwork specifications, permitting requirements, and insurance/subcontractor requirements. The government provided responses to the questions, clarifying details such as the existing conditions, required standards, and solicitation requirements.

View the file

Other files

File Type Posted
AMD0005 - 12905B24R00080005.pdf PDF
AMD0005 - 12905B24R0008 - RFI Log_05-14-2024.xlsx XLSX spreadsheet
AMD0004 - 12905B24R00080004.pdf PDF
AMD0003 - 12905B24R0008 - RFI Log_05-1-2024.xlsx XLSX spreadsheet
AMD0003 - 12905B24R00080003.pdf PDF
AMD0002 - ID20240023 4-19-2024.pdf PDF
AMD0002 - 12905B24R00080002.pdf PDF
AMD0002 - USDAARS_DSPWB_SD_Asbestos Lead Ltd Mold Report.pdf PDF
AMD0002 - 12905B24R0008 - RFI Log_04-29-2024.xlsx XLSX spreadsheet
AMD0001 - Dubois 66 and 92 Drawings - Amended 04222024.pdf PDF
AMD0001 - Attch 6 - RFI FORM.pdf PDF
AMD0001 - Dubois 66 and 92 Specifications - Amended 04222024.pdf PDF
AMD0001 - 12905B24R00080001.pdf PDF
AMD0001 - Dubois_Bldg 66_Owner Requested Change_Updated Sheets.pdf PDF
AMD0001 - Site Visit Log - Sign In Bldg 92_66 Site Visit 17April24.pdf PDF
Attch 1 - Dubois 66 and 92 Drawings.pdf PDF
12905B24R0008.pdf PDF
Attch 4 - ARS-372 - CONTRACTORS REQUEST FOR PAYMENT TRANSMITTAL.pdf PDF
Attch 6 - RFI FORM.pdf PDF
Attch 2 - USDAARSDSPWB_Project Manual_100pct 02.20.2024.pdf PDF
Attch 5 - Past Performance Questionnaire (PPQ).doc DOC document
Attch 7 -DOL ID20240023 Rev 1 dated 01122024.pdf PDF
Attch 3 - ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFI #Date ReceivedDate sent to customerSpec/Drawing referenceQuestion / RFIGovernment Response
14/16/24Contracting office answeredSite VisitAre you still planning the site visit on 4/17 since the Solicitation was just release on 4/12?
If so, is it possible to schedule a visit on a different day in the next week or two?The 4-17 site visit did take place and at this time, the government does not intend to do additional site site visits.
24/17/244/18/24Site VisitIs there a dump in Clark County?Yes, there is a county dump in Clark County, ID. Contractor will need to verify hours and what materials they will accept. There is also a landfill in Jefferson County.
34/17/244/18/24Site visitWhat is happening with the items in the buildings?We will remove what we want prior to the start of the contract, contractor will remove what is remaining.
44/17/244/18/24Site VisitAll of the interior walls are being removed in building 66?There is one wall on the drawings that remains, please refer to the drawings.
54/17/244/18/24Site VisitWhat is above the lab space in Building 92?There are water lines up there. Anything that may be stored in the space will be removed by us prior to start of project.
64/17/244/18/24Site VisitWill the buildings be occupied during the renovations?No.
74/17/24Contracting office answeredSite VisitWill the sign sheet be provided to the contractorsYes, see amendment 0001
4/18/24Contracting office answeredSite visitCan we get a copy of the pre-bid sign in sheet?See RFI 7
4/18/24Contracting office answeredGeneral questionAre subcontractors required to be registered with Sam.gov?No.
4/18/24Contracting office answeredSolicitationWill certified payroll reports be required on a weekly basis?Please refer to the solicitation clauses
4/18/24Contracting office answeredSolicitationWho will be enforcing that certified payroll will be reported with the correct prevailing wage?Please refer to the solicitation for submission requirements, compliance.
4/18/244/18/24Per Specifications the subcontractor is required to install the HVAC system to SMACNA code, Is the subcontractor required the be a SMACNA Member?This is a reference SMACNA standards. No contractor does not need to be a SMACNA mwember.
134/18/244/18/24Is there a controls system for the HVAC system or are the HVAC systems on stand alone thermostats? Does the facility currently have any type facility wide BMS system?Stand alone. No facility wide BMS.
144/18/244/18/24On drawing M001 there is a seismic bracing chart for the mechanical equipment, can the SMACNA Seismic Restraint Manual be utilized for the seismic restraints for the HVAC equipment?Yes.
154/18/244/18/24Which of the fume hoods being demoed out of building 66 is going in to building 92? Or will it be a different hood? The larger fume hood currently has double wall stainless steel exhaust duct and 2 connections on the top of the hood and the smaller one looks like it is currently ducted with 6 inch duct not 12" as shown in detail 1 on drawing M201.The existing 4-foot fume located in Building 66 room Open Storage #42 will be relocated.
164/18/244/18/24Will the stainless steel exhaust duct for the fume hood and chemical exhaust duct be fabricated per the SMACNA Industrial Duct Construction manual?Yes.
174/18/244/18/24Will welding on the stainless steel duct be welded to AWS D9.1? Can we utilize our AWS certified weld inspectors to inspect any welds?Yes.
184/18/244/18/24Where this is a federal facility will there be any HVAC permits required?No.
194/18/24Contracting office answeredSolicitationWhat insurance requirements need to be met by subcontractors?Please refer to the solicitation clauses