This document is an amendment to a request for proposal for renovating greenhouse and buildings at the USDA Physiology and Pathology of Tree Fruit Research Laboratory in Wenatchee, Washington. The amendment provides answers to questions from offerors concerning specifications for replacing the polycarbonate roofing system and mechanical systems. The government seeks a firm-fixed price contract between $500,000 and $1,000,000 to renovate Greenhouse #6 as well as buildings 5 and 10. The work includes removing and replacing the existing polycarbonate panels, glazing bars, and roof ventilation systems. It also involves upgrading the water cooling wall, infrared heating, and exhaust ventilation within the same locations as the current infrastructure. The due date for proposals remains unchanged.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
12905B22R0007 Renovate Greenhouse-Buildings Amendment #4
USDA Physiology and Pathology of Tree Fruit Lab Wenatchee, WA
Questions/Answers
Q. A polycarbonate vendor cannot be fount who will warrant the design as is. Their feedback indicates the span is too large for the panels. Based on this information and the importance of the panels it is our concern any bid would be inadequate for the project needs. Similar feedback has been provided for the as related to the HVAC system, the specified system will not fit. With the current feedback it is our concern the greenhouse scope requires further exploration and design to properly estimate and delivery on a properly functioning greenhouse.
A.
Polycarbonate Roof System:
Existing system panel is approximately 8mm thick multi-wall that is 20.5 inches wide by over 16.5 feet long, and secured / supported by metal (aluminum) glazing bars / support rafters. As part of the structural system to remain, there are intermediate purlins running perpendicular to the structural mainframes and polycarbonate panels and metal glazing bars. These purlins are located at the ridge, eave and two intermediates that are equally spaced. The drawings and specification 13 34 13 indicate that the polycarbonate panels and all glazing bar systems are to be removed and replaced. The span of the system is not an issue based on the width and minimum thickness of a 12mm multi-wall panel, and the use of continuous length metal (aluminum) glazing bars / support rafters as described in the documents.
Mechanical System:
The mechanical system is being replaced within the same locations as they are currently installed. The water cooling wall and system fit in the same location as the existing system. Infrared heating system is smaller than the existing system installed with better control because it is split between the separated areas within the greenhouse. Exhaust ventilation increases at sidewall, but is not bigger than existing greenhouse sidewall and roof ventilation fits in the existing openings provided. We are unaware of what specifically will not fit as indicated in this RFI.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0004
Code[0]: 12905B
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Michael Hassett
Description[0]: RFP 12905B22R0003 - Renovate Greenhouse-Buildings for USDA-ARS at Wenatchee, WA.
The purpose of this amendment is to provide latest questions and answers concerning this RFP. The due date for this RFP remains unchanged.
FacilityCode[0]:
Code[2]:
IssuedBy[0]: USDA ARS PWA AAO ACQ/PER PROP
800 BUCHANAN STREET
ALBANY CA 94710
Theodore Blume Email: theodore.blume@usda.gov
NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: 1053794
AmendmentNo[1]: 12905B22R0003
ModificationNo[0]:
ProjectNo[0]: LSY 20037.01
Page[0]:
Pages[0]:
EffectiveDate[0]: 04/26/2022
Dated9B[0]: 03/25/2022
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:
File details come from the government source that posted it. Updated .