Request for Information dated February 25 2022.pdf

PDF 58 KB Posted

Attached to
RFQ #12905B22Q0029 Mold Remediation Services, WRRC, Albany, CA
Solicitation number
12905B22Q0029
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

1. A Mold Abatement Protocol needs to be provided. A mold abatement protocol must be prepared by a licensed mold consultant – EPA requirement and CA, which identifies the source of the moisture and defines clearly the limits and types of mold growth and the specific abatement activities and safety requirements. The contractor is not allowed to develop their own Protocol.

Ans: This information is not available.

2. MEP and Floor Plans must be Provided for review

Ans: This information is not available

3. Asbestos Survey for site has to have been prepared by a licensed Asbestos Consultant.

Abatement must be performed by a licensed Asbestos Contractor

Ans: This information is not available.

4. Build-back – specifications for build back from existing specifications must be provided showing electrical, mechanical, and structural

Ans: This information is not available.

5. Is there active water leak.

Ans: No. There is no active water leak.

File details come from the government source that posted it. Updated .