12870 Preliminary Bid Results~1.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- S-C01010-00013316
- Issued by
- Clackamas County, Oregon
About this file
This is a Preliminary Bid Results document for the Oregon Parks and Recreation Department (OPRD) regarding the Champoeg Visitor Center Window Replacement Project (OPRD #12870, OregonBuys #S-63400-00013319). The project involves the installation of essential awning windows (7 units) and casement windows (24 units), along with deconstruction and material disposal. Bids were due on April 17, 2025, and five contractors submitted responses: Bolton Contracting LLC, MTR Construction LLC, Suite Additions LLC, Trees Plus Northwest LLC, and Andy Medcalf Construction. The bids have been received but have not yet been evaluated for responsiveness, and final bid results will be posted upon completion of the evaluation process.
The submitted bids range from approximately $29,939.84 to $98,500.00. Bolton Contracting LLC submitted the highest bid at $98,500.00, while MTR Construction LLC submitted the lowest bid at $29,939.84. The other three bidders' total costs were Suite Additions LLC at $44,500.00, Trees Plus Northwest LLC at $39,490.00, and Andy Medcalf Construction at $45,684.00. No information regarding set-asides, incumbent contractors, funding sources, or contract terms is provided in this preliminary results document, as the focus is solely on the receipt and initial documentation of submitted bids prior to formal responsiveness evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 2025-33-Clarifying Questions 2.pdf | ||
| 2025-33 RFQ Rock 1 inch Minus Delivered.pdf | ||
| RFQ 2025-33-Clarifying Questions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM. BID RESULTS
| PRELIMINARY BID RESULTS | |||||||||||||
| Bids below have not yet been evaluated for responsiveness. Final bid results will be posted once available | |||||||||||||
| OPRD # | 12870 | ||||||||||||
| OregonBuys # | S-63400-00013319 | ||||||||||||
| Closing: | 04/17/2025 | ||||||||||||
| Title: | Champoeg Visitor Center Window Replacement Project | ||||||||||||
| Bolton Contracting, LLC | MTR Construction, LLC | Suite Additions LLC | Trees Plus Northwest, LLC | Andy Medcalf Construction | |||||||||
| 2510 Jolie Pointe Road | 2780 Arbor Dr | 11825 SW Greenburg Rd #110 | 6605 Wallace Rd NW | 1485 20th St. SE | |||||||||
| West Linn, OR 97068 | West Linn, OR 97068 | Tigard, OR 97223 | Salem, OR 97304 | Salem, OR 97302 | |||||||||
| Item # | Description | Quantity | Unit | EA | TOTAL COST | EA | TOTAL COST | EA | TOTAL COST | EA | TOTAL COST | EA | TOTAL COST |
| A1. | Deconstruction and Material Disposal | All | LS | $5,500.00 | $3,100.00 | $8,500.00 | $3,120.00 | $5,880.00 | |||||
| A2. | Installation of Essential Awning Windows | 7 | EA | $3,000.00 | $21,000.00 | $880.00 | $6,160.00 | $8,000.00 | $1,150.00 | $8,050.00 | $1,284.00 | $8,988.00 | |
| A3. | Installation of Essential Casement Windows | 24 | EA | $3,000.00 | $72,000.00 | $861.66 | $20,679.84 | $28,000.00 | $1,180.00 | $28,320.00 | $1,284.00 | $30,816.00 | |
| Total | $98,500.00 | $29,939.84 | $44,500.00 | $39,490.00 | $45,684.00 |
&"Arial,Bold"&14* * * Preliminary Results Only * * *&12 &"Arial,Italic"&10(results are not final until evaluation is completed)
&"Arial,Italic"&8&F &"Arial,Italic"&8Page &P