12870 Final Bid Results.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- S-63400-00013319
- Issued by
- Marion County, Oregon
About this file
The document is a bid results spreadsheet for the Oregon Parks and Recreation Department's Champoeg Visitor Center Window Replacement Project (ITB #12870), located in St. Paul, Marion County, Oregon. The project involves deconstructing and disposing of existing windows and installing seven (7) Essential Awning Windows and twenty-four (24) Essential Casement Windows with specific technical requirements, including bronze exterior and interior, Low E2 glass with argon, stainless perimeter bar, 2" jambs, and nailing fin. Key project dates include a mandatory pre-bid conference on April 7, 2025, a deadline for requests and questions on April 11, 2025, and a bid submission deadline of April 17, 2025. The project is expected to start upon issuance of the Notice to Proceed and must be substantially completed by September 30, 2025, with liquidated damages of $200 per calendar day for failure to meet the completion date.
The bid results spreadsheet shows five contractors submitted bids: Bolton Contracting, LLC; MTR Construction, LLC; Suite Additions LLC; Trees Plus Northwest, LLC; and Andy Medcalf Construction. Total bid prices ranged from $29,939.84 to $45,684.00, with variations in unit prices for deconstruction, awning windows, and casement windows. The project has a cost estimate of $30,000 for bonding purposes and is anticipated to be funded by state funds. Windows must be Marvin brand or an approved equivalent, and contractors must be registered with the Oregon Construction Contractors Board. The procurement requires comprehensive insurance coverage, including workers' compensation, commercial general liability, automobile liability, and excess/umbrella insurance, with no specific set-aside designations or restrictions on bidder types mentioned.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12870 Preliminary Bid Results~1.xlsx | XLSX spreadsheet | |
| 723600-1_Supplemental_Ltr_1.pdf | ||
| ITB 12870 Champoeg Visitor Center Window Replacement Project.pdf | ||
| 12870 Prebid Sign in sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL BID RESULTS
FINAL BID RESULTS
| OPRD # | 12870 | ||||||||||||
| OregonBuys # | S-63400-00013319 | ||||||||||||
| Closing: | 04/17/2025 | ||||||||||||
| Title: | Champoeg Visitor Center Window Replacement Project | ||||||||||||
| Bolton Contracting, LLC | MTR Construction, LLC | Suite Additions LLC | Trees Plus Northwest, LLC | Andy Medcalf Construction | |||||||||
| 2510 Jolie Pointe Road | 2780 Arbor Dr | 11825 SW Greenburg Rd #110 | 6605 Wallace Rd NW | 1485 20th St. SE | |||||||||
| West Linn, OR 97068 | West Linn, OR 97068 | Tigard, OR 97223 | Salem, OR 97304 | Salem, OR 97302 | |||||||||
| Item # | Description | Quantity | Unit | EA | TOTAL COST | EA | TOTAL COST | EA | TOTAL COST | EA | TOTAL COST | EA | TOTAL COST |
| A1. | Deconstruction and Material Disposal | All | LS | $3,100.00 | $8,500.00 | $3,120.00 | $5,880.00 | ||||||
| A2. | Installation of Essential Awning Windows | 7 | EA | $880.00 | $6,160.00 | $8,000.00 | $1,150.00 | $8,050.00 | $1,284.00 | $8,988.00 | |||
| A3. | Installation of Essential Casement Windows | 24 | EA | $861.66 | $20,679.84 | $28,000.00 | $1,180.00 | $28,320.00 | $1,284.00 | $30,816.00 | |||
| Total | Bid Rejected | $29,939.84 | $44,500.00 | $39,490.00 | $45,684.00 |