This is a Questions and Answers document for federal contract 1284LM27Q0007, Haycamp Common Stand Exams, updated November 16, 2026. The contract pertains to forest inventory and examination work on the Dolores Ranger District of the San Juan National Forest. Key operational details include field access beginning as early as April 1st for lower-elevation stands, with the period of performance ending July 15, 2027, and a post-award conference required within 10 days of award at the Dolores Ranger District. The contractor's principal may attend the post-award conference virtually. Government-furnished data including Exams Mobile Personal Template, plot location files, and shapefiles will be provided at the pre-work meeting or electronically prior to support crew preparation. The contract involves sampling 1,283 plots across various forest stands requiring collection of vegetation/ground cover data, tree measurements, and stand condition documentation through both Exams Mobile and Survey 123/VEGCOV platforms.
Data collection specifications include measuring tree diameters to the nearest tenth of an inch for large trees, nearest inch class for small trees, and nearest 1-inch class for DRC plots. Growth sample collection is limited to 3 site trees per stand (trees greater than 10" DBH free from competition), with no height-growth measurements required for small trees. Standing dead trees (snags) are sampled concurrently with large tree variable radius plots with plot requirements based on live trees; down logs are not required. Fixed plot sizes are 1/100th acre for small trees (0.1-4.9 inches DBH) and 1/50th acre for DRC species (primarily Gambel oak greater than 6" DRC). Allowable basal area factors are limited to 10, 20, or 30. Digital plot photography is required when funded, consisting of four color photographs per plot taken from center facing cardinal directions, labeled with Stand ID and Plot Number. Snag decay class tolerance of plus or minus one class is acceptable. Contractors must sign and return SF 30 forms for both amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05d Haycamp CSE PWS 1284LM27Q0007 updated 16 Nov 26.pdf | ||
| C05c SF30 0002.pdf | ||
| Questions and Answers for 1284LM27Q0007 Haycamp Common Stand Exams 13 Nov 26.pdf | ||
| Questions and Answers for 1284LM27Q0007 Haycamp Common Stand Exams 12 Nov 26.pdf | ||
| SF 30 Amendment 0001- 1284LM27Q0007.pdf | ||
| 1284LM27Q0007- updated 5 Nov 2026.pdf | ||
| C04f_FormAttachments_1284LM27Q0007.docx | DOCX document | |
| C04j_Wage Determination_1284LM27Q0007.pdf | ||
| C04h_DRC Species_1284LM27Q0007.xlsx | XLSX spreadsheet | |
| 2. Haycamp CSE PWS.docx | DOCX document | |
| C04e_Contract Plots Map_1284LM27Q0007.pdf | ||
| 1284LM27Q0007.pdf | ||
| C04g_Workflow R234 1284LM27Q0007.docx | DOCX document | |
| Experience Questionnaire.docx | DOCX document | |
| C04d_Contract Area Map_1284LM27Q0007.pdf | ||
| C04i_Species Management Interest_1284LM27Q0007.xlsx | XLSX spreadsheet | |
| C04c_Haycamp Stands Plot List_1284LM27Q0007.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for 1284LM27Q0007 Haycamp Common Stand Exams- updated 16 Nov 2026
1. Period of performance and field access. PWS Section 1.1 states that road access is anticipated from approximately June 1 through November 15, while the period of performance ends July 15, 2027. This leaves approximately six weeks of field season for 1,283 plots. Will the Government consider extending the period of performance, or is earlier access to lower-elevation stands anticipated?
Earlier access to lower-elevation stands is anticipated. You can access a lot the lower elevation stands most of the year and I would say you can get into 90% of the contract as early as April 1st on a normal snow year. If conditions are worse this year, then it could be a possibility to extend the period of performance.
2. Post-award conference. PWS Section 1.3 requires a post-award conference at the Dolores Ranger District within 10 days of award. May the contractor's principal attend virtually, with the field supervisor/crew leader attending in person?
No issues attending virtually.
3. Forest and district codes / PWS references. PWS Section 3.16 references the Samuel R.
McKelvie National Forest, and Exhibit 1 lists Proclaimed Forest 07 / District 01, while other sections list Proclaimed Forest 13 / District 05. Please confirm the correct codes and whether the McKelvie reference applies to this requirement.
The McKelvie reference does not apply to this requirement as it is on the Dolores Ranger District of the San Juan National Forest. But the language “high clearance vehicles may be necessary on some roads. A four-wheel drive, high clearance vehicle is recommended. Careful monitoring of weather and road conditions is recommended…” is applicable to this contract.
4. Government-furnished data. Will the Exams Mobile Personal Template, plot location files, and shapefiles be provided at the pre-work meeting, or may they be provided electronically prior to it to support crew preparation?
Yes the Exams Mobile Personal Template, plot location files, and shapefiles will be provided at the pre-work meeting, or electronically prior to it to support crew preparation
5. Are growth sample trees being collected on every plot (like for Intensive Exams).
Growth samples are only required on the 3 site trees per stand. Site trees are trees that are typical of the stand. Site tree description will be given at post award meeting.
6. Are tree diameters collected to the nearest inch, or tench of an inch.
Nearest tenth of an inch.
7. The section says that large DRC trees >6” are tallied on a fixed plot (1/50th ac) and large DBH trees >5” are tallied on a variable radius plot, implying that in a single plot you could have both types on trees on the same plot, and that you would use a different plot sampling method depending on tree type (DBH vs DRC). Is this correct?
This is correct, Trees greater than 5” DBH, mainly ponderosa pine with probable chances of some douglas fir, spruce, and aspen will be collected on the variable radius plot.
Trees greater than 6”DRC, mainly Gambel oak with small potential for a pinyon or juniper, will be measured on the 1/50th acre fixed plot.
8. When determining the 4-8 tree average/plot, does that include both large DBH and large DRC trees? Is 6.0” DRC the correct breakpoint for defining a large DRC tree? In the previous paragraph it’s 5.0” DRC. Is it 6.0” or 5.0” ? & “A fixed area plot of 1/100th of an acre is to be used to sample small trees”, but earlier it says “The Contractor shall determine the fixed plot size for small trees.” Which is it?
4-8 trees DBH trees per plot for large tree plot, includes only DBH trees (mainly ponderosa pine). Fixed plot 1/100th of an acre required for small tree, 1/50th required for DRC species (mainly gambel oak). Removed conflicting language referencing contractor shall determine fixed plot sizes for small trees in this question.
9. What is the minimum size requirement for a tree to be considered a small tree? A height of 6 inches is standard.
CSE user guide chapter 4 Minimum size for small tree is based on DBH not height:
Standing live and standing dead trees 0.1 inches DBH to 4.9 inches DBH.
10. What is the size of the fixed radius plot used to sample dead trees? Does this include dead DRC and DBH trees or DBH only? Is there a minimum diameter/height requirement?
Dead trees will be sampled concurrently with the large tree variable radius plot. Plot requirements will be based on live trees in plot https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.fs.usda.gov%2Fsites%2Fdefault%2Ffiles%2Ffsveg-userguide-ch4-collect-record-data.pdf&data=05%7C02%7CSarah.Cotton%40usda.gov%7C3011e39635614d6e956c08df41d7a646%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C1%7C0%7C639302066927449997%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=V9lfY7v7rzYiN7AvYI9LKTzkTojSHebzU%2BetR0GmjhE%3D&reserved=0
11. The solicitation seems to be requesting vegetation/ground cover data to be collected within Exams Mobile (section a. Veg Comp/Ground Surface Cover, page 8), but identical information is requested to be collected through Survey 123/VEGCOV (page 11). Can you confirm that you want species cover collected in both of these locations? This seems redundant.
Veg Comp/Ground Surface cover are different forms than survey123/vegcov. Veg Comp/Ground Surface cover are plot forms and Survey 123/VEGCOV are stand forms.
Survey 123/VEGCOV is tied to R2 FSVeg Spatial Attributes in contract items 1b,2b,3b,4b. This is how stand data is added for FSVegSpatial which cannot pull directly from plot data.
12. What plot sizes will be allowed for the standing dead trees (i.e. snags)? Will there be a required minimum average count for snags per plot and if so, what would be the maximum plot size where that minimum count would be waived?
Dead trees will be sampled concurrently with the large tree variable radius plot. Plot requirements will be based on live trees in plot.
13. Are you requiring collection of data for down logs or just standing dead? If down logs are required, what would be the minimum diameter & length required for inclusion?
No requirement for down logs, just standing dead in large tree plot.
14. Historically, CSE contracts have allowed plus or minus one decay class tolerance on snags, but the CSE User’s Guide is referred to in the solicitation with regard to all tolerances wherein it is written that there is no tolerance on snag decay classes – so which do you prefer?
I’d have to see what exact cse guide they are referring to but I don’t see an issue with tolerance to +/- one decay class.
15. How many radial growth trees will be required for the live large trees >5.0 inches DBH for each plot/setting? Are trees 5.0-10.0 inches DBH excluded from radial growth measurements?
3 trees minimum per stand, site trees, will be required for radial growth measurement.
Site trees are greater than 10” DBH and have been free from competition. Site trees can be part of the large tree plots but if not acceptable trees are found in stand plots, off site trees are acceptable.
16. How many height-growth trees will be required for the small tree <5.0 inches DBH for each plot/setting?
None.
17. Can growth trees be used as site trees if they meet the site tree criteria?
Growth measurement only required for site trees.
18. If there is an overabundance of small trees on a 1/100th acre plot, then can the contractor use a 1/300th acre plot?
No, we will stick with the one size for the small plot. There is little chance for an overabundance of small trees on the 1/100th acre plot, and if a plot is found, grouping of trees in the small diameter plot is acceptable.
19. Would the basal area factors found in the Relaskop be allowed on this contract, such as 10, 20, 33.61, 40, 54.44, etc.?
Allowable BAF factors are 10, 20, or 30.
20. Will DBH be measured to the nearest 0.10 inch or the nearest 0.50 inch or vary based on diameter size?
Nearest 0.1 inch for large trees. Nearest inch class for small trees 1”-5” DBH, Nearest 1” class for DRC plot.
21. Digital photos are listed as an optional item in the solicitation, but I could not find any description of how the government would like those taken and how many per plot – do you have any specs on this?
If awarded and funded, the contractor shall collect digital plot photos at each sampled plot. Four (4) photos shall be taken from plot center, facing North, East, South, and West. Photos shall be in color, clear, and of sufficient quality to document stand conditions. Photo files shall be labeled with Stand ID and Plot Number and submitted electronically with the final deliverables.
**** Vendors must sign and turn in the SF 30’s for both Amendments. ****