This is a Questions and Answers document for federal contract 1284LM27Q0007, Haycamp Common Stand Exams, updated November 13, 2026. The contract is administered by the Dolores Ranger District of the San Juan National Forest and involves conducting forest stand examinations on 1,283 plots. The period of performance extends through July 15, 2027, with anticipated road access from June 1 through November 15, though lower-elevation stands are accessible as early as April 1 in normal snow years, allowing access to approximately 90 percent of the contract area by that date. The Government clarified that extension of the performance period is possible if weather conditions warrant.
The document addresses six key clarifications: the contractor's principal may attend the required post-award conference virtually within 10 days of award, with the field supervisor or crew leader attending in person; forest and district code references apply to the Dolores Ranger District with recommendations for four-wheel drive, high-clearance vehicles; government-furnished data including the Exams Mobile Personal Template, plot location files, and shapefiles will be provided either at the pre-work meeting or electronically prior to support crew preparation; growth sample trees are required only on three site trees per stand rather than every plot; and tree diameters must be collected to the nearest tenth of an inch. Site tree descriptions will be provided at the post-award meeting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05d Haycamp CSE PWS 1284LM27Q0007 updated 16 Nov 26.pdf | ||
| C05c SF30 0002.pdf | ||
| Questions and Answers for 1284LM27Q0007 Haycamp Common Stand Exams 16 Nov 26.pdf | ||
| Questions and Answers for 1284LM27Q0007 Haycamp Common Stand Exams 12 Nov 26.pdf | ||
| SF 30 Amendment 0001- 1284LM27Q0007.pdf | ||
| 1284LM27Q0007- updated 5 Nov 2026.pdf | ||
| C04f_FormAttachments_1284LM27Q0007.docx | DOCX document | |
| C04j_Wage Determination_1284LM27Q0007.pdf | ||
| C04h_DRC Species_1284LM27Q0007.xlsx | XLSX spreadsheet | |
| 2. Haycamp CSE PWS.docx | DOCX document | |
| C04e_Contract Plots Map_1284LM27Q0007.pdf | ||
| 1284LM27Q0007.pdf | ||
| C04g_Workflow R234 1284LM27Q0007.docx | DOCX document | |
| Experience Questionnaire.docx | DOCX document | |
| C04d_Contract Area Map_1284LM27Q0007.pdf | ||
| C04i_Species Management Interest_1284LM27Q0007.xlsx | XLSX spreadsheet | |
| C04c_Haycamp Stands Plot List_1284LM27Q0007.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for 1284LM27Q0007 Haycamp Common Stand Exams- updated 13 Nov 2026
1. Period of performance and field access. PWS Section 1.1 states that road access is anticipated from approximately June 1 through November 15, while the period of performance ends July 15, 2027. This leaves approximately six weeks of field season for 1,283 plots. Will the Government consider extending the period of performance, or is earlier access to lower-elevation stands anticipated?
Earlier access to lower-elevation stands is anticipated. You can access a lot the lower elevation stands most of the year and I would say you can get into 90% of the contract as early as April 1st on a normal snow year. If conditions are worse this year, then it could be a possibility to extend the period of performance.
2. Post-award conference. PWS Section 1.3 requires a post-award conference at the Dolores Ranger District within 10 days of award. May the contractor's principal attend virtually, with the field supervisor/crew leader attending in person?
No issues attending virtually.
3. Forest and district codes / PWS references. PWS Section 3.16 references the Samuel R.
McKelvie National Forest, and Exhibit 1 lists Proclaimed Forest 07 / District 01, while other sections list Proclaimed Forest 13 / District 05. Please confirm the correct codes and whether the McKelvie reference applies to this requirement.
The McKelvie reference does not apply to this requirement as it is on the Dolores Ranger District of the San Juan National Forest. But the language “high clearance vehicles may be necessary on some roads. A four-wheel drive, high clearance vehicle is recommended. Careful monitoring of weather and road conditions is recommended…” is applicable to this contract.
4. Government-furnished data. Will the Exams Mobile Personal Template, plot location files, and shapefiles be provided at the pre-work meeting, or may they be provided electronically prior to it to support crew preparation?
Yes the Exams Mobile Personal Template, plot location files, and shapefiles will be provided at the pre-work meeting, or electronically prior to it to support crew preparation
5. Are growth sample trees being collected on every plot (like for Intensive Exams).
Growth samples are only required on the 3 site trees per stand. Site trees are trees that are typical of the stand. Site tree description will be given at post award meeting.
6. Are tree diameters collected to the nearest inch, or tench of an inch.
Nearest tenth of an inch.