Text version

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS

Specification List

Project Name: Horseshoe CG Bridge Superstructure in Arapaho-Roosevelt National Forest

Title Date Prepared 08/12 (Latest Revision Date)

Specification Number:

101 Terms, Format, and Definitions 2014

SCR 101-109 Terms, Format, and Definitions 08/12 102 Bid, Award, and Execution of Contract 2014

SCR 101-109 Bid, Award, and Execution of Contract 08/12 103 Scope of Work 2014

SCR 101-109 Scope of Work 08/12 104 Control of Work 2014

SCR 101-109 Control of Work 08/12 105 Control of Material 2014

SCR 101-109 Control of Material 08/12 106 Acceptance of Work 2014

SCR 101-109 Acceptance of Work 08/12 107 Legal Relations and Responsibilities to the Public 2014

SCR 101-109 Legal Relations and Responsibilities to the Public 08/12 108 Prosecution and Progress 2014

SCR 101-109 Prosecution and Progress 08/12 109 Measurement and Payment 2014

SCR 101-109 Measurement and Payment 08/12 151 Mobilization 2014

152 Construction Survey and Staking 2014

SCR 152 Construction Survey and Staking 08/12

153 Contractor Quality Control 2014

SCR 153 Contractor Quality Control 08/12

154 Contractor Sampling and Testing 2014

SCR 154 Contractor Sampling and Testing 08/12

155 Schedules for Construction Contracts 2014

SCR 155 Schedules for Construction Contracts 08/12

156 Public Traffic 2014

SCR 156 Public Traffic 08/12

157 Soil Erosion Control 2014

SCR 157 Soil Erosion Control 08/12

201 Clearing and Grubbing 2014

SCR 201 Clearing and Grubbing 08/12

203 Removal of Structures and Obstructions 2014

SCR 203 Removal of Structures and Obstructions 08/12

204 Excavation and Embankment 2014

SCR 204 Excavation and Embankment 08/12

208 Structure Excavation and Backfill for Selected Major Structures 2014

SCR 208 Structure Excavation and Backfill for Selected Major Structures 08/12

301 Untreated Aggregate Courses 2014

SCR 301 Untreated Aggregate Courses 08/12

314 Stockpiled Aggregate 2014

SCR 314 Stockpiled Aggregate 08/12

555 Steel Structures 2014

556 Bridge Railing 2014

557 Timber Structures 2014

SCR 557 Timber Structures 08/12

617 Guardrail 2014

624 Topsoil 2014

SCR 624 Topsoil 08/12

635 Temporary Traffic Control 2014

SCR 635 Temporary Traffic Control 08/12

703 Aggregate 2014

SCR 703 Aggregate 08/12

716 Material for Timber Structures 2014

717 Structural Metal 2014

718 Traffic Signing and Marking Material 2014

Note: All of the specifications cited are applicable to this project. The Special Contract Requirements (SCR) are included with this solicitation. The other specifications are within the 2014 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this project.