Attachment_3_-_Amend_0001_-_Schedule_of_Items.docx

DOCX document 14 KB Posted

Attached to
Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest
Solicitation number
1282X919R0005
Issued by

About this file

Attachment 3 - Amend 0001 - Replacement Schedule of Items

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS – AMENDMENT 0001

Horseshoe CG Bridge Replacement – Arapaho-Roosevelt National Forest

ItemMethod of
No.DescriptionMeasurementUnitQty.Unit PriceTotal

151(01) Mobilization L.S.Q. L.S. 1 $ $

152(05) Bridge Survey and Staking L.S.Q. L.S. 1 $ $

203(05)Removal of Structures andL.S.Q.L.S.1$$
Obstructions
301(13)Aggregate surface course, TypeC.Q.C.Y.32$$
Grading G, compaction
555(01)Structural steel, channel stiffener,C.Q.Pound2315.33$$
Fabricated and erected
556(01)W-Bean, Type IV, Class A, SteelC.Q.Foot150$$
Side Mounted Bridge Railing

556(07) Terminal Section, Type 3K C.Q. Each 4 $ $

556(50)Bridge Approach Railing, Type IV,C.Q.Foot87.5$$
Class A
557(04)ATreated Structural Timber andL.S.Q.L.S.1$$
And Lumber, Dowel-Laminated
Deck
557(04)BTreated Structural Timber andL.S.Q.L.S.1$$
And Lumber, Curb System
573(01)Concrete Abutment and PierL.S.Q.L.S.1$$
Repair
633(06)Concrete Abutment and PierC.Q.Each4$$
Repair

Total Base Items $

Optional Item – Subject to the Availability of Funds

002 Log Jam Removal L.S.Q. L.S. 1 $ $

Total Optional Item$
Total Base and Optional Item$

FAR 36.204 Disclosure of the magnitude of construction projects: Between $250,000 and $500,000