1282BH19R0002_Amend_0001.pdf

PDF 96 KB Posted

Attached to
Pike & San Isabel National Forests Road Construction IDIQ
Solicitation number
1282BH19R0002
Issued by

About this file

1282BH19R0002 Amend 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1282BH19R0002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PUEBLO CO 81008

82BH

2840 KACHINA DRIVE

PIKE SAN ISABEL NATIONAL FOREST

ATTN TOINETTE ARANDA TONI

USDA FOREST SERVICE AQM

04/24/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/17/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Pike & San Isabel National Forests Roads Construction IDIQ

REVISED SOLICITATION - Replace original Solicitation and attachments with revised documents.

AMENDMENT 00001 Issued

1. Post pre-proposal agenda, attendees list and submitted questions and answers.

2. Make corrections to the solicitation document.

3. Provide revised solicitation and attachments.

4. Extend proposal due date to 29 May 2019 @ 10:00am Mountain

Acknowledgement of the amendment is required to be submitted with the proposal (sign and return this amendment).

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TOINETTE P. ARANDA

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation 1282BH19R0002 Pike & San Isabel National Forests Roads Construction IDIQ Solicitation Amend 000001 PAGE 2 OF 2

Replace the original posted Solicitation with the attached revised solicitation.

Extend proposal due date to 29 May 2019.

SECTION C - DESCRIPTION/SPECIFICATIONS

C.9 Government Furnished Property – Sentence added to end of paragraph.

Government furnished property will be identified in issued task order(s).

SECTION E - INSPECTION AND ACCEPTANCE

E.1 QUALITY CONTROL– Sentence added to end of paragraph.

A quality control plan may be required for task orders.

SECTION J - SPECIAL CONTRACT REQUIREMENTS

Attach 04 Corrected Title General Decision CO190006 01/04/2019 CO06

Added 02a Grasslands Map

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

ATTACHMENTS

Provide Grasslands Map Attach 02a Map with Grasslands Attach 01 Standard Specifications Rev1

Standard Specifications Changes- Added Definitions 230 - Roadside Brushing Description

230.01 Work. This work consists of removing all vegetative material including limbs, residual slash, live roadside brush, and small trees within the brushing limits designated on the plans.

The following definitions shall be applied:

Heavy Vegetation shall be defined per task order if applicable.

Moderate Vegetation shall include roadside brushing on approximately 50% of the linear mileage of road.

Light Vegetation shall include roadside brushing on approximately 25% of the linear mileage of road.

1282BH19R0002 SF30 Amend 0001
1282BH19R0002 Amend 0001 Sum of Changes
General Decision CO190006 01/04/2019 CO06
Added 02a Grasslands Map

File details come from the government source that posted it.