This document includes the technical specifications for a stewardship contract on the Elkhorn 3 project area located on the Arapaho Roosevelt National Forest. The contract involves stand cleaning and thinning, mechanical fuels reduction, snag and down wood management, and removal of timber and other products. Task requirements include felling all live and dead conifer species over 5.6 inches diameter at stump height, skidding cut trees to landings, whole tree logging, and slash treatment. Road maintenance pre-haul, during-haul, and post-haul is also required. The purpose is to improve forest health through thinning, reduce hazardous fuels, and utilize timber and other wood products. The Forest Service is seeking to award this contract to accomplish land management objectives.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 6___Elkhorn 3.pdf | ||
| Amendment 5___Elkhorn 3.pdf | ||
| Appendix B___Elkhorn 3.pdf | ||
| Amendment 1___Elkhorn 3.pdf | ||
| Amendment 2___Elkhorn 3.pdf | ||
| Amendment 3___Elkhorn 3.pdf | ||
| Amendment 4___Elkhorn 3.pdf | ||
| UPDATE - 2-3-2020 - Appendix B___Elkhorn 3.pdf | ||
| Past Performance Reference.docx | DOCX document | |
| UPDATE - 2-3-2020 - 12-82AT-20-R-4001___Elkhorn 3.docx | DOCX document | |
| Experience Questionnaire.docx | DOCX document | |
| UPDATED 1 27 2020 - Appendix B___Elkhorn 3.pdf | ||
| 12-82AT-20-R-4001___Elkhorn 3.docx | DOCX document | |
| Service Contract Act - Rev 58.pdf | ||
| Appendix B___Elkhorn 3.pdf | ||
| Contract Area Map___Elkhorn 3.pdf | ||
| Appendix C___Elkhorn 3.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elkhorn 3 IRSC Page 1 of 3
Arapaho Roosevelt NF APPENDIX A Canyon Lakes RD
Appendix A
TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS
SECTION I – DEFINITIONS
1.1 DEFINITIONS
ACCEPTABLE QUALITY LEVEL: Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s); refer to the Performance Requirements Summary in Section E.4 of Contract.
A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.
BIOMASS TREES: Any conifer material 2.0 foot in height to 4.9 inches DBH.
BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.
CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.
COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
CUT TREES: Trees that do not possess the characteristics of desirable leave trees, and are required to be cut. As described by the contract or otherwise marked to be cut.
CUTTING UNIT: see Treatment Unit definition
DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 18 inches in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50 percent of bark removed from the circumference of the bole.
DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.
DECKING: Stockpiling of trees in a designated area.
DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless.
DIB: Diameter inside bark.
HANG-UP TREE: Any cut tree suspended above ground level.
LEAVE TREE: Trees that possess desirable characteristics and that serve to create the basis for designated spacing requirements, or are otherwise designated to be left.
NON-SAWTIMBER TREE: For Lodgepole Pine: 5.0 inches DBH – 6.9 inches DBH, and for Engelmann Spruce and Subalpine Fir: 5.0 inches – 7.9 inches DBH.
PAYMENT UNIT: See Treatment Unit.
PERFORMANCE REQUIREMENTS SUMMARY (PRS): Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.
PILING: Material moved to an agreed upon location shall be piled for future treatment by Forest Service.
PROGRESSION OF WORK: Work conducted in a progressive, workmanlike and orderly manner by the Contractor.
Elkhorn 3 IRSC Page 2 of 3
RESERVE CLUMPS: Groups of trees within a treatment area that are protected from cutting, may also include Individual Reserve trees.
SAWTIMBER TREE: Included timber meeting the Utilization Specifications as defined in Appendix B, Division A.2.
SKIDDING: The process of conveying felled trees or logs to a landing or designated location.
SLASH: Woody material existing or created that has accumulated on the forest floor. Woody material includes logs, pieces of logs, tops and branches.
SUBDIVISION: See Treatment Unit.
TEMPORARY ROADS: Non-permanent roads that are constructed by contractor for the purpose of Treatment Unit access.
TREATMENT UNIT: An individual area on the ground in which activities will be performed and which may appear as a separate pay item in the Schedule of Items.
UNSATISFACTORY WORK: If work quality falls below the AQL, the COR will issue a work order or notice of noncompliance to the Contractor in writing. Untreated or unsatisfactory treated areas shall be reworked to obtain satisfactory work quality.
WHOLE TREE LOGGING: Whole tree logging includes cutting tree and removing the entire tree, including tops and branches, to the landing.
WILDLIFE TREE: Standing tree marked to be reserved as a wildlife tree. Used by birds and small mammals for shelter, nesting, perching, etc.
Elkhorn 3 IRSC Page 3 of 3
SECTION II – ACTIVITY ITEMS
2.1 TASK DESCRIPTIONS:
Task 1 - Felling:
Maximum stump height for tree felled under Task 1 is 12 inches
All trees are designated for cutting as shown in tables below.
Table A— Felling Diameter Criteria
CLEAR-CUT (CC) UNITS
UNITS CUTTING DESIGNATION REQUIREMENTS
28, 30, 47, 48, 49, 50
Cut all live/dead conifer species (excluding limber pine) > 5.6 inches stump diameter
Coarse Woody Debris: leave 1-2 logs in full contact with the ground and no jackstrawed per acre, ≥ 5 inches large end diameter and ≥ 50 linear feet/acre.
1-2 dead trees per acre, meeting these requirements may be felled and left in place to ensure requirements are met.
Table B—
Felling Diameter Criteria
GROUP SELECTION (GS) UNITS
UNITS CUTTING DESIGNATION REQUIREMENTS
46A-R
Cut all live/dead conifer species (excluding limber pine) > 5.6 inches stump diameter
Coarse Woody Debris: leave 1-2 logs in full contact with the ground and not jackstrawed per acre, ≥ 5 inches large end diameter and ≥ 50 linear feet/acre.
1-2 dead trees per acre, meeting these requirements may be felled and left in place to ensure requirements are met.
Task 2 – Skidding:
All Units: Limber pine agreed to be cut under Construction Clearing or Other Authorized Clearings shall be skidded to the landing and piled with other non-sawtimber material and logging slash.
Task 3 – Slash Treatment:
All Units: Whole Tree Log all trees felled under Tasks 1 & 2. All requirements in H.23 Slash Treatment apply.
Task 4 – Road Maintenance Pre-haul, During-haul, and Post-haul road maintenance shall be performed to the standards and specifications in Appendix C, Road Maintenance Requirements.