SP-1 BOX SAC-CarpRoofing Dwgs 15Mar2023.pdf

PDF 1 MB Posted

Attached to
USFS Job Corps Mountain Zone Facilities Construction MATOC Federal contract opportunity
Solicitation number
1282A724R0003
Issued by
Department of Agriculture Forest Service

About this file

This document package includes construction drawings and specifications for roof rehabilitation projects at the Boxelder Job Corps Center in Nemo, South Dakota, as well as information about an associated Multiple Award Indefinite Delivery/Indefinite Quantity contract opportunity with the USDA Forest Service.

The construction drawings depict the Student Activity Center and Carpentry/Painting Vocational buildings, outlining the scope of work for replacing roofing on the mansard portions with new underlayment and metal panels. Additional work includes removing and reinstalling roof flashing and apparatus. The MATOC solicitation is for facilities construction and maintenance services at Job Corps centers located in Colorado, Nebraska, South Dakota and Utah, with a ceiling of $5 million over five years. The NAICS code is 236220 for commercial and institutional building construction, and the small business size standard is $45 million.

View the file

Other files for this federal contract opportunity

Other files attached to USFS Job Corps Mountain Zone Facilities Construction MATOC, newest first.
File Type Posted
1282A724R0003 SP-2.pdf PDF
1282A724R0003_0002_.pdf PDF
1282A724R0003 SP-1.pdf PDF
1282A724R0003 SP-3.pdf PDF
PPQ.doc DOC document
1282A724R0003 Question and Answer Document.pdf PDF
1282A724R0003_0001.pdf PDF
ConstructionExperienceForm.docx DOCX document
SP-3 COL JCC ElecLifeSafety Dwgs Rev 12Dec2022.pdf PDF
SP-3 COL JCC ElecLifeSafety Specs Rev 12Dec2022.pdf PDF
SP-1 WDOL_DBA_SD.pdf PDF
1282A724R0003.pdf PDF
SP-2 Collbran-Map-Photos-FloorPlans05042022.pdf PDF
1282A724R0003 SP-2.pdf PDF
SP-2 ScheduleOfItems-SectionB.xlsx XLSX spreadsheet
SP-1 BOX SAC Roof ScheduleOfItems-SectionB.pdf PDF
SP-3 WDOL_DBA_CO.pdf PDF
1282A724R0003 SP-3.pdf PDF
SP-3_COL JCC MultBldg Elec ScheduleOfItems-SectionB.xlsx XLSX spreadsheet
SP-2 WDOL_DBA_CO.pdf PDF
SP-2 Collbran-MultibldgFireAlarms-SOW05042022.pdf PDF
1282A724R0003 SP-1.pdf PDF
SP-1 BOX SAC Roofing Specs.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet Title:

Checked:

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

VICINITY MAP AND SHEET INDEXL.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

T1.0

1 7FINAL

SHEET INDEX

SHEET NUMBER SHEET NAME BUILDING ID/NAME

VICINITY MAP

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

AutoCAD SHX Text Sheet:

AutoCAD SHX Text T1.0 VICINITY MAP AND SHEET INDEX GENERAL VICINITY MAP AND SHEET INDEX GENERAL VICINITY MAP AND SHEET INDEX GENERAL GENERAL T1.1 LOCATION MAP GENERAL LOCATION MAP GENERAL GENERAL T1.2 CAMPUS MAP GENERAL CAMPUS MAP GENERAL GENERAL A1.0 ROOF PLAN STUDENT ACTIVITY CENTER ROOF PLAN STUDENT ACTIVITY CENTER STUDENT ACTIVITY CENTER A1.1 PHOTOS STUDENT ACTIVITY CENTER PHOTOS STUDENT ACTIVITY CENTER STUDENT ACTIVITY CENTER A2.0 ROOF PLAN CARPENTRY ROOF PLAN CARPENTRY CARPENTRY A2.1 PHOTOS CARPENTRYPHOTOS CARPENTRYCARPENTRY

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

LOCATION MAPL.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

T1.1

2 7FINAL

LOCATION MAP

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

Sheet:

E-2

H-1

H-2

H-3

H-4

G-2

G-1

O-1

O-4

O-5

S-2

S-3

S-8

S-4

S-5

S-6

S-7

S-9

ST

R-1

R-4

O-6

E-1

M-1

PARKING

O-7

R-3

T-3

T O

N

E M

O

T H

R E

E

M

I L E

S

B

O

X

E

L

D

E

R

C

R

E

E

K

E-3

R3-3

R3-2

R3-1

H1-1

H2-1

H3-1

H4-1

S-12

S-13

R-5

GH

S-11

S-10

S-16

S-14

S-15

O6-1

Sheet Title:

Checked:

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

CAMPUS MAPL.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

T1.2

3 7FINAL

BUILDINGS

E-1 - COUNSELOR/VACANT

E-2 - EDUCATION

E-3 - NCT VOC

G-1 - HARD VOCATION

G-2 - CARPENTRY/PAINTING VOC

H-1 - LODGE 1 (MEN'S DORM)

H-2 - LODGE 2 (MEN'S DORM)

H-3 - LODGE 3 (MEN'S DORM)

H-4 - LODGE 4 (WOMEN'S DORM)

M-1 - KITCHEN/DINING HALL

O-1 - ADMIN CENTER

O-4 - HEALTH/WELLNESS

O-5 - ADMINISTRATION

O-6 - CULINARY ARTS TRAINING

O-7- CDSS

R-1 - GYMNASIUM

R-3 - STUDENT ACTIVITY CENTER

S-2 - CPP/OFFICES

S-4 - BUILDING MATERIALS

STORAGE

S-7 - WAREHOUSE

S-9 - MATERIAL LUMBER STORAGE

ST - SEWAGE TREATMENT PLANT

STRUCTURES

GH- GREENHOUSE

H1-1 - STORAGE

H2-1 - STORAGE

H3-1 - STORAGE

H4-1 - STORAGE

O6-1 - CULINARY ARTS STORAGE

R-4 - RECREATION PAVILION

R-5 - RECREATION PAVILION

R3-1 - STORAGE

R3-2 - STORAGE

R3-3 - STORAGE

S-10 - STORAGE

S-11 - STORAGE

S-12 - GENERATOR SHED

S-13 - WATER STORAGE TANK

S-14 - STORAGE

S-15 - STORAGE

S-16 - STORAGE

S-3 - WELDING GAS STORAGE

S-5 - GAS PUMP/STORAGE

S-6 - SURPLUS PROPERTY

STORAGE.

S-8 - STORAGE

T-3 - PUMP HOUSE

STUDENT

ACTIVITIES

CENTER

CARPENTY/

PAINTING VOCATION

AutoCAD SHX Text

STAFF HOUSING

AutoCAD SHX Text

STAFF HOUSING

AutoCAD SHX Text

STAFF HOUSING

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

AutoCAD SHX Text Sheet:

AutoCAD SHX Text Nemo, South Dakota

Boxelder Civilian Conservation Center

CANTEEN

POOL RM

REC RM

M

JAN

W

STORE

ARTS AND

CRAFTS

OFFICE

ARTS AND

CRAFTS

TOILET

JAN

TOILET

MECH

STORAGE

UPPER LEVEL

LOWER LEVEL

75'-3"

Sheet Title:

Checked:

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

ROOF PLAN

STUDENT ACTIVITY CENTER (R-3)

L.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

A2.0

4 7FINAL

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

AutoCAD SHX Text Sheet:

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

PH1

AutoCAD SHX Text A2.1

AutoCAD SHX Text

PH4

AutoCAD SHX Text A2.1

AutoCAD SHX Text

PH2

AutoCAD SHX Text A2.1

AutoCAD SHX Text

PH3

AutoCAD SHX Text A2.1

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

ASSUMED

AutoCAD SHX Text REMOVE DAMAGED ROOF FLASHING. INSTALL NEW FLASHING AFTER MANSARD ROOFING IS COMPLETE. NEW FLASHING TO MATCH EXISTING IN MATERIAL, COLOR, SIZE, AND SHAPE. REMOVE AND RE-INSTALL NON-DAMAGED ROOF FLASHING AFTER SHINGLE REPLACEMENT IS COMPLETE. ROUGH OUTLINE OF MANSARD ROOF FOOTPRINT. REMOVE EXISTING SHINGLES ON MANSARD PORTION OF ROOF. JOINTLY INSPECT MANSARD SHEATHING WITH CONTRACTING OFFICER TO DETERMINE EXTENT OF SHEATHING REPLACEMENT NEEDED, IF ANY. INSTALL NEW UNDERLAYMENT AND METAL PANELS ON ENTIRE MANSARD PORTION. TOP ROOF PORTION TO REMAIN AS IS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PH1

AutoCAD SHX Text A2.1

AutoCAD SHX Text

PH4

AutoCAD SHX Text A2.1

AutoCAD SHX Text

PH2

AutoCAD SHX Text A2.1

AutoCAD SHX Text

PH3

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

PHOTOS

STUDENT ACTIVITY CENTER

L.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

A2.1

5 7FINAL

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

AutoCAD SHX Text Sheet:

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text REMOVE DAMAGED ROOF FLASHING. INSTALL NEW FLASHING AFTER MANSARD ROOFING IS COMPLETE. NEW FLASHING TO MATCH EXISTING IN MATERIAL, COLOR, SIZE, AND SHAPE. REMOVE AND RE-INSTALL NON-DAMAGED ROOF FLASHING AFTER SHINGLE REPLACEMENT IS COMPLETE. REMOVE AND RE-INSTALL ALL APPARATUS AFTER SHINGLE REPLACEMENT IS COMPLETE, TYP. REMOVE EXISTING SHINGLES ON MANSARD PORTION OF ROOF. JOINTLY INSPECT MANSARD SHEATHING WITH CONTRACTING OFFICER TO DETERMINE EXTENT OF SHEATHING REPLACEMENT NEEDED, IF ANY. INSTALL NEW UNDERLAYMENT AND METAL PANELS ON ENTIRE MANSARD PORTION. TOP ROOF PORTION TO REMAIN AS IS.

AutoCAD SHX Text

PH1

AutoCAD SHX Text A2.0

AutoCAD SHX Text

NORTH ELEVATION

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PH2

AutoCAD SHX Text A2.0

AutoCAD SHX Text

SOUTH ELEVATION

AutoCAD SHX Text

PH3

AutoCAD SHX Text A2.0

AutoCAD SHX Text

WEST ELEVATION

AutoCAD SHX Text

PH4

AutoCAD SHX Text A2.0

AutoCAD SHX Text

EAST ELEVATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

ROOF PLAN

CARPENTRY/PAINT VOCATION (G-2)

L.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

A1.0

6 7FINAL

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

AutoCAD SHX Text Sheet:

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text ROUGH OUTLINE OF ROOF FOOTPRINT. ENTIRE RIDGE: REMOVE EXISTING ROOF RIDGE ASPHALT SHINGLES. CUT BACK EXISTING SHEATHING ON EACH SIDE OF ROOF RIDGE. INSTALL NEW CONTINUOUS RIDGE VENT. EXISTING ROOF SHINGLES TO REMAIN, TYP. INSTALL BIRD BLOCK INTAKE VENT IN EACH RAFTER SPACE, ENTIRE BUILDING ON EAVE SIDES, ON TOP OF EXISTING BLOCKING. CUT BLOCKING DOWN TO ACCOMMODATE INTAKE VENT, OR INSTALL NEW BLOCKING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1/16"=1'-0"

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

ASSUMED

AutoCAD SHX Text

PH1

AutoCAD SHX Text A1.1

AutoCAD SHX Text

PH2/3

AutoCAD SHX Text A1.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Drawn:

Date:

Design:

NATIONAL

FIELD OFFICE

BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB

PHOTOS

CARPENTRY

L.CARROLL

L.CARROLL

D.VALLES

MARCH 2023

A1.1

7 7FINAL

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

OF

AutoCAD SHX Text Sheet:

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text ENTIRE RIDGE: REMOVE EXISTING ROOF RIDGE ASPHALT SHINGLES. CUT BACK EXISTING SHEATHING ON EACH SIDE OF ROOF RIDGE. INSTALL NEW CONTINUOUS RIDGE VENT. INSTALL BIRD BLOCK INTAKE VENT IN EACH RAFTER SPACE, ENTIRE BUILDING ON EAVE SIDES, ON TOP OF EXISTING BLOCKING. CUT BLOCKING DOWN TO ACCOMMODATE INTAKE VENT, OR INSTALL NEW BLOCKING. EXISTING SHINGLES TO REMAIN, TYP.

AutoCAD SHX Text

PH1

AutoCAD SHX Text

NORTHEAST ELEVATION

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PH2

AutoCAD SHX Text

NORTH ELEVATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PH3

EAVE VIEW

BOXJCC SACBldg ReRoofing-VICINITYMAP
Sheets and Views
BOXJCC SACBldg ReRoofing-VICINITYMAP
PLOT
BOXJCC SACBldg ReRoofing-LOCATIONMAP
Sheets and Views
BOXJCC SACBldg ReRoofing-LOCATIONMAP
PLOT
BOXJCC SACBldg ReRoofing-CAMPUSMAP
Sheets and Views
BOXJCC SACBldg ReRoofing-CAMPUSMAP
PLOT
BOXJCC SACBldg ReRoofing-ACT CENTER
Sheets and Views
BOXJCC SACBldg ReRoofing-ACT CENTER
PLOT
BOXJCC SACBldg ReRoofing-ACT PHOTOS
Sheets and Views
BOXJCC SACBldg ReRoofing-ACT PHOTOS
PLOT
BOXJCC SACBldg ReRoofing-CARP
Sheets and Views
BOXJCC SACBldg ReRoofing-CARP
PLOT
BOXJCC SACBldg ReRoofing-CARP PHOTOS
Sheets and Views
BOXJCC SACBldg ReRoofing-CARP PHOTOS
PLOT

File details come from the government source that posted it. Updated .