About this file
This document package includes construction drawings and specifications for roof rehabilitation projects at the Boxelder Job Corps Center in Nemo, South Dakota, as well as information about an associated Multiple Award Indefinite Delivery/Indefinite Quantity contract opportunity with the USDA Forest Service.
The construction drawings depict the Student Activity Center and Carpentry/Painting Vocational buildings, outlining the scope of work for replacing roofing on the mansard portions with new underlayment and metal panels. Additional work includes removing and reinstalling roof flashing and apparatus. The MATOC solicitation is for facilities construction and maintenance services at Job Corps centers located in Colorado, Nebraska, South Dakota and Utah, with a ceiling of $5 million over five years. The NAICS code is 236220 for commercial and institutional building construction, and the small business size standard is $45 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282A724R0003 SP-2.pdf | ||
| 1282A724R0003_0002_.pdf | ||
| 1282A724R0003 SP-1.pdf | ||
| 1282A724R0003 SP-3.pdf | ||
| PPQ.doc | DOC document | |
| 1282A724R0003 Question and Answer Document.pdf | ||
| 1282A724R0003_0001.pdf | ||
| ConstructionExperienceForm.docx | DOCX document | |
| SP-3 COL JCC ElecLifeSafety Dwgs Rev 12Dec2022.pdf | ||
| SP-3 COL JCC ElecLifeSafety Specs Rev 12Dec2022.pdf | ||
| SP-1 WDOL_DBA_SD.pdf | ||
| 1282A724R0003.pdf | ||
| SP-2 Collbran-Map-Photos-FloorPlans05042022.pdf | ||
| 1282A724R0003 SP-2.pdf | ||
| SP-2 ScheduleOfItems-SectionB.xlsx | XLSX spreadsheet | |
| SP-1 BOX SAC Roof ScheduleOfItems-SectionB.pdf | ||
| SP-3 WDOL_DBA_CO.pdf | ||
| 1282A724R0003 SP-3.pdf | ||
| SP-3_COL JCC MultBldg Elec ScheduleOfItems-SectionB.xlsx | XLSX spreadsheet | |
| SP-2 WDOL_DBA_CO.pdf | ||
| SP-2 Collbran-MultibldgFireAlarms-SOW05042022.pdf | ||
| 1282A724R0003 SP-1.pdf | ||
| SP-1 BOX SAC Roofing Specs.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Title:
Checked:
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
VICINITY MAP AND SHEET INDEXL.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
T1.0
1 7FINAL
SHEET INDEX
SHEET NUMBER SHEET NAME BUILDING ID/NAME
VICINITY MAP
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
AutoCAD SHX Text Sheet:
AutoCAD SHX Text T1.0 VICINITY MAP AND SHEET INDEX GENERAL VICINITY MAP AND SHEET INDEX GENERAL VICINITY MAP AND SHEET INDEX GENERAL GENERAL T1.1 LOCATION MAP GENERAL LOCATION MAP GENERAL GENERAL T1.2 CAMPUS MAP GENERAL CAMPUS MAP GENERAL GENERAL A1.0 ROOF PLAN STUDENT ACTIVITY CENTER ROOF PLAN STUDENT ACTIVITY CENTER STUDENT ACTIVITY CENTER A1.1 PHOTOS STUDENT ACTIVITY CENTER PHOTOS STUDENT ACTIVITY CENTER STUDENT ACTIVITY CENTER A2.0 ROOF PLAN CARPENTRY ROOF PLAN CARPENTRY CARPENTRY A2.1 PHOTOS CARPENTRYPHOTOS CARPENTRYCARPENTRY
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
LOCATION MAPL.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
T1.1
2 7FINAL
LOCATION MAP
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
Sheet:
E-2
H-1
H-2
H-3
H-4
G-2
G-1
O-1
O-4
O-5
S-2
S-3
S-8
S-4
S-5
S-6
S-7
S-9
ST
R-1
R-4
O-6
E-1
M-1
PARKING
O-7
R-3
T-3
T O
N
E M
O
T H
R E
E
M
I L E
S
B
O
X
E
L
D
E
R
C
R
E
E
K
E-3
R3-3
R3-2
R3-1
H1-1
H2-1
H3-1
H4-1
S-12
S-13
R-5
GH
S-11
S-10
S-16
S-14
S-15
O6-1
Sheet Title:
Checked:
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
CAMPUS MAPL.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
T1.2
3 7FINAL
BUILDINGS
E-1 - COUNSELOR/VACANT
E-2 - EDUCATION
E-3 - NCT VOC
G-1 - HARD VOCATION
G-2 - CARPENTRY/PAINTING VOC
H-1 - LODGE 1 (MEN'S DORM)
H-2 - LODGE 2 (MEN'S DORM)
H-3 - LODGE 3 (MEN'S DORM)
H-4 - LODGE 4 (WOMEN'S DORM)
M-1 - KITCHEN/DINING HALL
O-1 - ADMIN CENTER
O-4 - HEALTH/WELLNESS
O-5 - ADMINISTRATION
O-6 - CULINARY ARTS TRAINING
O-7- CDSS
R-1 - GYMNASIUM
R-3 - STUDENT ACTIVITY CENTER
S-2 - CPP/OFFICES
S-4 - BUILDING MATERIALS
STORAGE
S-7 - WAREHOUSE
S-9 - MATERIAL LUMBER STORAGE
ST - SEWAGE TREATMENT PLANT
STRUCTURES
GH- GREENHOUSE
H1-1 - STORAGE
H2-1 - STORAGE
H3-1 - STORAGE
H4-1 - STORAGE
O6-1 - CULINARY ARTS STORAGE
R-4 - RECREATION PAVILION
R-5 - RECREATION PAVILION
R3-1 - STORAGE
R3-2 - STORAGE
R3-3 - STORAGE
S-10 - STORAGE
S-11 - STORAGE
S-12 - GENERATOR SHED
S-13 - WATER STORAGE TANK
S-14 - STORAGE
S-15 - STORAGE
S-16 - STORAGE
S-3 - WELDING GAS STORAGE
S-5 - GAS PUMP/STORAGE
S-6 - SURPLUS PROPERTY
STORAGE.
S-8 - STORAGE
T-3 - PUMP HOUSE
STUDENT
ACTIVITIES
CENTER
CARPENTY/
PAINTING VOCATION
AutoCAD SHX Text
STAFF HOUSING
AutoCAD SHX Text
STAFF HOUSING
AutoCAD SHX Text
STAFF HOUSING
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
AutoCAD SHX Text Sheet:
AutoCAD SHX Text Nemo, South Dakota
Boxelder Civilian Conservation Center
CANTEEN
POOL RM
REC RM
M
JAN
W
STORE
ARTS AND
CRAFTS
OFFICE
ARTS AND
CRAFTS
TOILET
JAN
TOILET
MECH
STORAGE
UPPER LEVEL
LOWER LEVEL
75'-3"
Sheet Title:
Checked:
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
ROOF PLAN
STUDENT ACTIVITY CENTER (R-3)
L.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
A2.0
4 7FINAL
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
AutoCAD SHX Text Sheet:
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
PH1
AutoCAD SHX Text A2.1
AutoCAD SHX Text
PH4
AutoCAD SHX Text A2.1
AutoCAD SHX Text
PH2
AutoCAD SHX Text A2.1
AutoCAD SHX Text
PH3
AutoCAD SHX Text A2.1
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
ASSUMED
AutoCAD SHX Text REMOVE DAMAGED ROOF FLASHING. INSTALL NEW FLASHING AFTER MANSARD ROOFING IS COMPLETE. NEW FLASHING TO MATCH EXISTING IN MATERIAL, COLOR, SIZE, AND SHAPE. REMOVE AND RE-INSTALL NON-DAMAGED ROOF FLASHING AFTER SHINGLE REPLACEMENT IS COMPLETE. ROUGH OUTLINE OF MANSARD ROOF FOOTPRINT. REMOVE EXISTING SHINGLES ON MANSARD PORTION OF ROOF. JOINTLY INSPECT MANSARD SHEATHING WITH CONTRACTING OFFICER TO DETERMINE EXTENT OF SHEATHING REPLACEMENT NEEDED, IF ANY. INSTALL NEW UNDERLAYMENT AND METAL PANELS ON ENTIRE MANSARD PORTION. TOP ROOF PORTION TO REMAIN AS IS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PH1
AutoCAD SHX Text A2.1
AutoCAD SHX Text
PH4
AutoCAD SHX Text A2.1
AutoCAD SHX Text
PH2
AutoCAD SHX Text A2.1
AutoCAD SHX Text
PH3
AutoCAD SHX Text A2.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
PHOTOS
STUDENT ACTIVITY CENTER
L.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
A2.1
5 7FINAL
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
AutoCAD SHX Text Sheet:
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text REMOVE DAMAGED ROOF FLASHING. INSTALL NEW FLASHING AFTER MANSARD ROOFING IS COMPLETE. NEW FLASHING TO MATCH EXISTING IN MATERIAL, COLOR, SIZE, AND SHAPE. REMOVE AND RE-INSTALL NON-DAMAGED ROOF FLASHING AFTER SHINGLE REPLACEMENT IS COMPLETE. REMOVE AND RE-INSTALL ALL APPARATUS AFTER SHINGLE REPLACEMENT IS COMPLETE, TYP. REMOVE EXISTING SHINGLES ON MANSARD PORTION OF ROOF. JOINTLY INSPECT MANSARD SHEATHING WITH CONTRACTING OFFICER TO DETERMINE EXTENT OF SHEATHING REPLACEMENT NEEDED, IF ANY. INSTALL NEW UNDERLAYMENT AND METAL PANELS ON ENTIRE MANSARD PORTION. TOP ROOF PORTION TO REMAIN AS IS.
AutoCAD SHX Text
PH1
AutoCAD SHX Text A2.0
AutoCAD SHX Text
NORTH ELEVATION
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PH2
AutoCAD SHX Text A2.0
AutoCAD SHX Text
SOUTH ELEVATION
AutoCAD SHX Text
PH3
AutoCAD SHX Text A2.0
AutoCAD SHX Text
WEST ELEVATION
AutoCAD SHX Text
PH4
AutoCAD SHX Text A2.0
AutoCAD SHX Text
EAST ELEVATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
ROOF PLAN
CARPENTRY/PAINT VOCATION (G-2)
L.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
A1.0
6 7FINAL
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
AutoCAD SHX Text Sheet:
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text ROUGH OUTLINE OF ROOF FOOTPRINT. ENTIRE RIDGE: REMOVE EXISTING ROOF RIDGE ASPHALT SHINGLES. CUT BACK EXISTING SHEATHING ON EACH SIDE OF ROOF RIDGE. INSTALL NEW CONTINUOUS RIDGE VENT. EXISTING ROOF SHINGLES TO REMAIN, TYP. INSTALL BIRD BLOCK INTAKE VENT IN EACH RAFTER SPACE, ENTIRE BUILDING ON EAVE SIDES, ON TOP OF EXISTING BLOCKING. CUT BLOCKING DOWN TO ACCOMMODATE INTAKE VENT, OR INSTALL NEW BLOCKING.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
ASSUMED
AutoCAD SHX Text
PH1
AutoCAD SHX Text A1.1
AutoCAD SHX Text
PH2/3
AutoCAD SHX Text A1.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Drawn:
Date:
Design:
NATIONAL
FIELD OFFICE
BOXELDER JOB CORPS CCC ACTIVITY CENTER/CARPENTRY ROOF REHAB
PHOTOS
CARPENTRY
L.CARROLL
L.CARROLL
D.VALLES
MARCH 2023
A1.1
7 7FINAL
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text
OF
AutoCAD SHX Text Sheet:
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text ENTIRE RIDGE: REMOVE EXISTING ROOF RIDGE ASPHALT SHINGLES. CUT BACK EXISTING SHEATHING ON EACH SIDE OF ROOF RIDGE. INSTALL NEW CONTINUOUS RIDGE VENT. INSTALL BIRD BLOCK INTAKE VENT IN EACH RAFTER SPACE, ENTIRE BUILDING ON EAVE SIDES, ON TOP OF EXISTING BLOCKING. CUT BLOCKING DOWN TO ACCOMMODATE INTAKE VENT, OR INSTALL NEW BLOCKING. EXISTING SHINGLES TO REMAIN, TYP.
AutoCAD SHX Text
PH1
AutoCAD SHX Text
NORTHEAST ELEVATION
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PH2
AutoCAD SHX Text
NORTH ELEVATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PH3
EAVE VIEW
| BOXJCC SACBldg ReRoofing-VICINITYMAP |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-VICINITYMAP |
| PLOT |
| BOXJCC SACBldg ReRoofing-LOCATIONMAP |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-LOCATIONMAP |
| PLOT |
| BOXJCC SACBldg ReRoofing-CAMPUSMAP |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-CAMPUSMAP |
| PLOT |
| BOXJCC SACBldg ReRoofing-ACT CENTER |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-ACT CENTER |
| PLOT |
| BOXJCC SACBldg ReRoofing-ACT PHOTOS |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-ACT PHOTOS |
| PLOT |
| BOXJCC SACBldg ReRoofing-CARP |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-CARP |
| PLOT |
| BOXJCC SACBldg ReRoofing-CARP PHOTOS |
| Sheets and Views |
| BOXJCC SACBldg ReRoofing-CARP PHOTOS |
| PLOT |
File details come from the government source that posted it. Updated .