QUESTIONS & ANSWERS REGARDING:
SOLICITATION/REQUEST FOR PROPOSALS NO. 1282A718R0007
Amendment 0002
Kentucky – Construction and Facility Maintenance and Repair Services ID/IQ
(AMENDMENT 0001)
Updated the Schedule of Items in Seed Project 4 – Ceiling and Lighting Replacement – Great Onyx to all items being Subject to Availability of Funds only.
(AMENDMENT 0002)
QUESTIONS RECEIVED AS OF 9/24/2018:
1. On “Part 1 – The Schedule” sheet, Item # 003 “Flammable Storage Room – Multi-Trade Building 0580” Shouldn’t the 0580 really be 0576? Building 580 is Treatment Lab in which there’s no effort taking place there.
ANSWER: Building # should be 0576 as indicated in the specifications and drawings. See corrected Schedule with Attachment 8.
2. On “Part 1 – The Schedule” sheet, Item # 004 “Welding Exhaust – Multi-Trade Building 0580” Shouldn’t the 0580 really be 0576? Building 580 is Treatment Lab in which there’s no effort taking place there.
ANSWER: Building # should be 0576 as indicated in the specifications and drawings. See corrected Schedule with Attachment 8.
3. The Center Point-of-Contact commented during a site visit that they believed one of the kitchen hoods recently had the shunt breakers tied into its respective fire suppression system. Can this be verified? If, so would it be for Building 0577 – Culinary Arts, in which Keynote 5 (Drawing AE1.1) states that this work is to be performed. Or, perhaps it may have been done for Building 0554 – Food Service, in which Keynote 2 (Drawing E4.1) states that this work is to be performed.
ANSWER: This information is updated with Attachment 8 – Seed Project 2 – Life Safety Projects – Frenchburg – Amendment 2
4. Also, please confirm that only Building 0135 – CO ED Dorm is to have the fire alarm system, existing wiring removed, new conduit installed and then wire pulled-in & terminated, as stated on Drawing E1.1, Keynote 5. Even though we looked at the fire alarm system wiring in building 0137 – Male Dorm, it does not say on the drawing that this wiring is to be replaced with new conduit/wire.
ANSWER: The work only applies to Building 0135
1282A718R0006
RFP
Montana and Idaho – Construction and Facility Maintenance and Repair Services ID/IQ
5. Also, I need to know what items on Drawing E1.1 fall under Optional Item #007 on the Bid Sheet, and what items fall under Item #002 on the Bid Sheet. Its not clearly stated and could potentially negatively affect our bid. 002 covers Alarm System Modifications and 007 covers Fire Alarm Wiring . . . . . both sort of the same thing?????
ANSWER: This information is clarified in Specification Section 010150 Paragraphs 2.2 B.2 and 2.2 C.2 (See Attachment 8).
Please Note – Attachment 8 – Seed Project 2 – Life Safety Projects – Frenchburg – Amendment 2 incorporated with Amendment 2, replaces Attachment 2 – Seed Project 2 – Life Safety Projects – Frenchburg in its entirety. Please use this document instead of the original Attachment 2, as the Schedule of Items, Drawings AE1.1 and E4.1, and Section 100150 – General Requirements have been updated and replaced with Amendment 2.