Attachment_1_-_Seed_Project_1_-_Restroom_Rehabilitation_-_Frenchburg.pdf

PDF 2 MB Posted

Attached to
Multi-Award Construction and Facility Maintenance and Repairs Services ID/IQ for Forect Service opertated Kentucky Job Corps Centers
Solicitation number
1282A718R0007
Issued by

About this file

Seed Project 1 - Schedule - Drawings - Specifications - Wage Determinations

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Solicitation – 1282A718R0007

Seed Project 1 – Dormitory Restroom Rehabilitation

Frenchburg Job Corps Center Frenchburg, KY 40322-8854 Menifee County, Kentucky

Item Estimated No. Description Unit Quantity Total

001 Dormitory 135 Restroom Rehabilitation LS 1 $

002 Dormitory 137 Restroom Rehabilitation LS 1 $

003 Dormitory 135 Floor Tile LS 1 $

004 Dormitory 137 Floor Tile LS 1 $

BASE ITEMS TOTAL $

OPTIONAL/ADDITIVE ITEM – Subject to the Availability of Funding

005 Dormitory 135 Shower Plumbing and Valves LS 1 $

006 Dormitory 137 Shower Plumbing and Valves LS 1 $

007 Dormitory 135 Install New Restroom Partitions LS 1 $

008 Dormitory 137 Install New Restroom Partitions LS 1 $

009 Dormitory 135 Additional Wall Tile Replacement LS 1 $

010 Dormitory 137 Additional Wall Tile Replacement LS 1 $

011 Dormitory 135 Epoxy Flooring in Lieu of Tile LS 1 $ (If selected it will be awarded instead of Line Item 003)

012 Dormitory 137 Epoxy Flooring in Lieu of Tile LS 1 $ (If selected it will be awarded instead of Line Item 004)

OPTIONAL/ADDITIVE TOTAL $

BASE AND OPTIONAL/ADDITIVE ITEMS TOTAL $

Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

FAR 36.204 Disclosure of the magnitude of construction projects

The Government’s estimate is: Between $25,000 and $100,000

R o u t e

TO SOFTBALL

FIELD

C a m p u s

T r a i l

STAFF

HOUSING

STAFF

HOUSING

ENTRANCE

GATE

GATE

SEWAGE

TREATMENT

FACILITY

POND

Route 77

Route 77

To

Highway

ROCKY MOUNTAIN REGION

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE TITLE SHEET AND INDEX

GENERAL T0.1

PROJECT

LOCATION

DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

D.BARROW

AutoCAD SHX Text

%%UKENTUCKY STATE VICINTIY MAP

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

U.S. HIGHWAY

AutoCAD SHX Text

STATE HIGHWAY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

INTERSTATE HIGHWAY

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF AGRICULTURE

AutoCAD SHX Text

CONSTRUCTION DRAWINGS FOR

AutoCAD SHX Text

FOREST SERVICE

AutoCAD SHX Text

FRENCHBURG JOB CORPS CIVILIAN CONSERVATION CENTER

AutoCAD SHX Text

DANIEL BOONE NATIONAL FOREST

AutoCAD SHX Text

DORMITORY RESTROOM REHABILITATION

AutoCAD SHX Text

1. T0.1 TITLE SHEET AND INDEX GENERAL T0.1 TITLE SHEET AND INDEX GENERAL TITLE SHEET AND INDEX GENERAL GENERAL 2. A1.1 DEMOLITION PLAN DORMITORY 1 BUILDING 137 A1.1 DEMOLITION PLAN DORMITORY 1 BUILDING 137 DEMOLITION PLAN DORMITORY 1 BUILDING 137 DORMITORY 1 BUILDING 137 3. A1.2 REHABILITATION PLAN DORMITORY 1 BUILDING 137 A1.2 REHABILITATION PLAN DORMITORY 1 BUILDING 137 REHABILITATION PLAN DORMITORY 1 BUILDING 137 DORMITORY 1 BUILDING 137 4. A2.1 DEMOLITION PLAN DORMITORY 2 BUILDING 135 A2.1 DEMOLITION PLAN DORMITORY 2 BUILDING 135 DEMOLITION PLAN DORMITORY 2 BUILDING 135 DORMITORY 2 BUILDING 135 DORMITORY 2 BUILDING 135 5. A2.2 REHABILITATION PLAN DORMITORY 2 BUILDING 135 A2.2 REHABILITATION PLAN DORMITORY 2 BUILDING 135 REHABILITATION PLAN DORMITORY 2 BUILDING 135 DORMITORY 2 BUILDING 135 2. A3.1 PHOTOGRAPHS GENERAL A3.1 PHOTOGRAPHS GENERAL PHOTOGRAPHS GENERAL GENERAL 3. A4.1 SHOWER PAN DETAIL GENERALA4.1 SHOWER PAN DETAIL GENERALSHOWER PAN DETAIL GENERAL GENERAL

AutoCAD SHX Text

INDEX

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SUB

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text 12/2017

AutoCAD SHX Text

%%ULOCATION MAP

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text BUILDINGS: 135 - DORMITORY II (MALE) 136 - DORMITORY III (MALE) 137 - DORMITORY I (FEMALE) 213 - ADMINISTRATION 325 - VOCATIONAL STORAGE 326 - FLAMMABLE STORAGE 377 - BAM SHOP/WPA 399 - CARPENTRY STORAGE 430 - MAINT/ELEC. EQUIPMENT STORAGE 534 - CARPENTRY SHOP 536 - ACADEMIC EDUCATION 537 - GYMNASIUM 538 - VACANT 554 - FOOD SERVICE 557 - CENTER WAREHOUSE 571 - STUDENT SERVICES 572 - CEMENT MASONRY SHOP 573 - AUTO MECHANICS SHOP 574 - CO-ED DISPENSARY 575 - LAUNDRY/CANTEEN 576 - MULTI-TRADE BUILDING 577 - CULINARY ARTS 578 - COUNSELING TRAILER 580 - TREATMENT LAB

AutoCAD SHX Text

DORMITORY 2 (BLDG 135)

AutoCAD SHX Text

DORMITORY 1 (BLDG 137)

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Project Manager, Center for Design and Interpretation, R2

AutoCAD SHX Text Job Corps Program Manager

AutoCAD SHX Text Approved By:

AutoCAD SHX Text Manager, Center for Design and Interpretation, R2

AutoCAD SHX Text I Have Reviewed the Technical Aspects of These Drawings.

AutoCAD SHX Text 10/16/17 14:51 LCARROLL C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG; 14:51 LCARROLL C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG;14:51 LCARROLL C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG; LCARROLL C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG;LCARROLL C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG; C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG;C:\LEXIE_DOCS\_PROJECTS\FRENCHBURG_BATHROOMS\DWGS\T1_TITLE.DWG;;

AutoCAD SHX Text 10/16/17 14:51 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\MULTI_BLDGS\2017_DORM_RR-RETROFITS\DWGS\T1_TITLE.DWG 14:51 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\MULTI_BLDGS\2017_DORM_RR-RETROFITS\DWGS\T1_TITLE.DWG14:51 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\MULTI_BLDGS\2017_DORM_RR-RETROFITS\DWGS\T1_TITLE.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\MULTI_BLDGS\2017_DORM_RR-RETROFITS\DWGS\T1_TITLE.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\MULTI_BLDGS\2017_DORM_RR-RETROFITS\DWGS\T1_TITLE.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\MULTI_BLDGS\2017_DORM_RR-RETROFITS\DWGS\T1_TITLE.DWG

ROCKY MOUNTAIN REGION

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE PHOTOGRAPHS A0.1

2DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7

AutoCAD SHX Text

DORM 135 RESTROOM LOOKING WEST

AutoCAD SHX Text

AutoCAD SHX Text A1.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DORM 135 RESTROOM SHOWERS

AutoCAD SHX Text

AutoCAD SHX Text A1.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DORM 137 RESTROOM LOOKING WEST

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DORM 137 RESTROOM SHOWERS

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text NOTES: 1. REMOVE (E) SHOWER PARTITION AND SUPPORTS, TYP. REMOVE (E) SHOWER PARTITION AND SUPPORTS, TYP. 2. REMOVE SHOWER FIXTURE AND ACCESSORIES, TYP. REMOVE SHOWER FIXTURE AND ACCESSORIES, TYP. 3. REMOVE TILE FLOOR AND SUBSTRATE DOWN TO REMOVE TILE FLOOR AND SUBSTRATE DOWN TO CONCRETE SLAB IN SHOWER ROOM. 4. REMOVE WALL TILE AND GYPSUM WALL BOARD FROM REMOVE WALL TILE AND GYPSUM WALL BOARD FROM FLOOR LEVEL UP TO 3 FEET ABOVE FLOOR. 5. INSPECT EXISTING CMU PARTITION WALL FOR WATER INSPECT EXISTING CMU PARTITION WALL FOR WATER DAMAGE.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

D.BARROW

AutoCAD SHX Text 12/2017

7/17/17 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG

DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7ROCKY MOUNTAIN REGION

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE SHOWER PAN DETAIL A0.2

AutoCAD SHX Text

18" GAP FOR STEEL EXPANSION, TYPICAL BOTH SIDES

AutoCAD SHX Text X

AutoCAD SHX Text

5/8" CEMENT BACKER BOARD

AutoCAD SHX Text

6 MIL POLY OR 15LB FELT, LAP OVER MEMBRANE

AutoCAD SHX Text

EXTEND MEMBRANE WATERPROOFING UP WALLS. FASTEN TOP ONLY

AutoCAD SHX Text

CERAMIC TILE OVER LATEX MODIFIED THIN-SET CEMENT BED

AutoCAD SHX Text

LATEX MODIFIED MORTAR, SLOPED 14-INCH MIN., -INCH MAX.12-INCH MAX.

AutoCAD SHX Text

EXISTING CONCRETE SLAB

AutoCAD SHX Text

EXISTING DRAIN

AutoCAD SHX Text

40-MIL CPE SHOWER PAN MEMBRANE

AutoCAD SHX Text

EXISTING CMU, TYP.

AutoCAD SHX Text

PEA GRAVEL OR CRUSHED TILE AROUND WEEP HOLES, TYPICAL BOTH SIDES

AutoCAD SHX Text

GROUT

AutoCAD SHX Text

SHOWER PAN DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1"=1'-0"

AutoCAD SHX Text 7/17/17 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG

AutoCAD SHX Text 12/2017

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

D.BARROW

0 21 4

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE DEMOLITION PLAN

DORMITORY 1 - BUILDING 137 A1.1

4DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

ASSUMED

AutoCAD SHX Text

DEMOLITION FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text A1.1

AutoCAD SHX Text NOTES: 1. BASE ITEM: REMOVE AND SALVAGE (E) SHOWER BASE ITEM: REMOVE AND SALVAGE (E) SHOWER PARTITION AND SUPPORTS, TYP. OPTIONAL ITEM: REMOVE AND DISPOSE. 2. REMOVE TILE FLOOR AND SUBSTRATE DOWN TO REMOVE TILE FLOOR AND SUBSTRATE DOWN TO CONCRETE SLAB IN SHOWER ROOM. 3. BASE ITEM: REMOVE AND SALVAGE SHOWER VALVES BASE ITEM: REMOVE AND SALVAGE SHOWER VALVES AND HEADS. OPTIONAL ITEM: REMOVE AND DISPOSE. 4. REMOVE WALL TILE AND GYPSUM WALL BOARD FROM REMOVE WALL TILE AND GYPSUM WALL BOARD FROM FLOOR LEVEL UP TO 3 FEET ABOVE FLOOR. 5. REMOVE FLOOR DRAIN COVERS, TYP. PROTECT REMOVE FLOOR DRAIN COVERS, TYP. PROTECT FLOOR DRAINS DURING CONSTRUCTION. 6. OPTIONAL ITEM: DISCONNECT AND REMOVE TEMPERED OPTIONAL ITEM: DISCONNECT AND REMOVE TEMPERED WATER LINES FROM WATER HEATER TO SHOWERS, RESTROOMS 'A' AND 'B'. (WATER LINES NOT SHOWN).

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

(NO SCALE)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PH2

AutoCAD SHX Text A0.1

AutoCAD SHX Text

PH1

AutoCAD SHX Text A0.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text GENERAL NOTES: 1. INFORMATION HAS BEEN TAKEN FROM LIMITED INFORMATION HAS BEEN TAKEN FROM LIMITED SITE VISITS AND FIELD OBSERVATIONS. FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY CO IMMEDIATELY SHOULD NOTIFY CO IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 7/17/17 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

D.BARROW

12/2017

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE REHABILITATION PLAN

DORMITORY 1 - BUILDING 137 A1.2

5DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text GENERAL NOTES: 1. INFORMATION HAS BEEN TAKEN FROM LIMITED INFORMATION HAS BEEN TAKEN FROM LIMITED SITE VISITS AND FIELD OBSERVATIONS. FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY CO IMMEDIATELY SHOULD NOTIFY CO IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS.

AutoCAD SHX Text

REHABILITATION FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text A1.2

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

ASSUMED

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

(NO SCALE)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text NOTES: 1. INSTALL SHOWER PAN SYSTEM THROUGHOUT SHOWER INSTALL SHOWER PAN SYSTEM THROUGHOUT SHOWER ROOM AS SHOWN ON DETAIL 1/A0.2. 2. BASE ITEM: INSTALL NEW CERAMIC TILE, ENTIRE BASE ITEM: INSTALL NEW CERAMIC TILE, ENTIRE SHOWER ROOM FLOOR. (RE: SPECIFICATIONS). FLOOR. (RE: SPECIFICATIONS). OPTIONAL ITEM: INSTALL EPOXY FLOOR SYSTEM IN LEUI OF TILE. INSTALL INTEGRAL EPOXY COVE 4" UP BOTTOM OF WALL. 3. INSTALL NEW CERAMIC TILE ON WALLS FROM FLOOR INSTALL NEW CERAMIC TILE ON WALLS FROM FLOOR UP TO 3 FEET ABOVE FLOOR. MATCH EXISTING TILE IN SIZE, TEXTURE, AND COLOR. (RE: SPECIFICATIONS) 4. BASE ITEM: RE-INSTALL EXISTING PARTITIONS, TYP. BASE ITEM: RE-INSTALL EXISTING PARTITIONS, TYP. OPTIONAL ITEM: INSTALL NEW PARTITIONS. CONFIGURATION TO BE SIMILAR TO EXISTING. 5. INSTALL NEW DRAIN COVERS ON EXISTING FLOOR INSTALL NEW DRAIN COVERS ON EXISTING FLOOR DRAIN, TYP. 6. BASE ITEM: RE-INSTALL SALVAGED SHOWER VALVE BASE ITEM: RE-INSTALL SALVAGED SHOWER VALVE AND HEAD. OPTIONAL ITEM: INSTALL NEW SHOWER VALVE AND HEAD. 7. OPTIONAL ITEM: RUN NEW HOT AND COLD WATER OPTIONAL ITEM: RUN NEW HOT AND COLD WATER LINES FROM WATER HEATER TO NEW SHOWER VALVES. RUN LINES CONCEALED IN ATTIC AND EXPOSED ALONG SHOWER WALLS. RUN 3/4" MAINS AND 1/2" BRANCH LINES TO EACH FIXTURE. (LINES NOT SHOWN). 8. RE-INSTALL ALL SHOWER ROOM ACCESSORIES.RE-INSTALL ALL SHOWER ROOM ACCESSORIES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 7/17/17 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

D.BARROW

AutoCAD SHX Text 12/2017

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE DEMOLITION PLAN

DORMITORY 2 - BUILDING 135 A2.1

6DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

ASSUMED

AutoCAD SHX Text

DEMOLITION FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text NOTES: 1. INSPECT CMU PARTITIONS FOR WATER DAMAGE. REPORT RESULTS TO CO. 2. REMOVE TILE FLOOR AND SUBSTRATE DOWN TO REMOVE TILE FLOOR AND SUBSTRATE DOWN TO CONCRETE SLAB. 3. BASE ITEM: REMOVE AND SALVAGE SHOWER BASE ITEM: REMOVE AND SALVAGE SHOWER VALVES AND HEADS. OPTIONAL ITEM: REMOVE AND DISPOSE. 4. REMOVE WALL TILE AND GYPSUM WALL BOARD FROM REMOVE WALL TILE AND GYPSUM WALL BOARD FROM FLOOR LEVEL UP TO 3 FEET ABOVE FLOOR. 5. REMOVE FLOOR DRAIN COVERS, TYP. PROTECT REMOVE FLOOR DRAIN COVERS, TYP. PROTECT FLOOR DRAINS DURING CONSTRUCTION. 6. OPTIONAL ITEM: DISCONNECT AND REMOVE TEMPERED OPTIONAL ITEM: DISCONNECT AND REMOVE TEMPERED WATER LINES FROM WATER HEATER TO SHOWERS, RESTROOMS 'A' AND 'B'. (WATER LINES NOT SHOWN).

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

(NO SCALE)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PH4

AutoCAD SHX Text A0.1

AutoCAD SHX Text

PH3

AutoCAD SHX Text A0.1

AutoCAD SHX Text GENERAL NOTES: 1. INFORMATION HAS BEEN TAKEN FROM LIMITED INFORMATION HAS BEEN TAKEN FROM LIMITED SITE VISITS AND FIELD OBSERVATIONS. FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY CO IMMEDIATELY SHOULD NOTIFY CO IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 7/17/17 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

D.BARROW

AutoCAD SHX Text 12/2017

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

JOB CORPS

NATIONAL FIELD OFFICE

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE REHABILITATION PLAN

DORMITORY 2 - BUILDING 135 A2.2

7DORMITORY RESTROOM REHABILITATION

FRENCHBURG JOB CORPS

CIVILIAN CONSERVATION CENTER

DANIEL BOONE NATIONAL FOREST 7

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

MECH

AutoCAD SHX Text

RESTROOM 'A'

AutoCAD SHX Text

RESTROOM 'B'

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

ASSUMED

AutoCAD SHX Text

REHABILITATION FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text A2.2

AutoCAD SHX Text NOTES: 1. INSTALL SHOWER PAN SYSTEM THROUGHOUT SHOWER INSTALL SHOWER PAN SYSTEM THROUGHOUT SHOWER ROOM AS SHOWN ON DETAIL 1/A0.2. 2. BASE ITEM: INSTALL NEW CERAMIC TILE, ENTIRE BASE ITEM: INSTALL NEW CERAMIC TILE, ENTIRE SHOWER ROOM FLOOR. (RE: SPECIFICATIONS). FLOOR. (RE: SPECIFICATIONS). OPTIONAL ITEM: INSTALL EPOXY FLOOR SYSTEM IN LEUI OF TILE. INSTALL INTEGRAL EPOXY COVE 4" UP BOTTOM OF WALL. 3. INSTALL NEW CERAMIC TILE ON WALLS FROM FLOOR INSTALL NEW CERAMIC TILE ON WALLS FROM FLOOR UP TO 3 FEET ABOVE FLOOR. MATCH EXISTING TILE IN SIZE, TEXTURE, AND COLOR. (RE: SPECIFICATIONS) 4. INSTALL NEW WALL TILE ON EXISTING CMU PARTITION, INSTALL NEW WALL TILE ON EXISTING CMU PARTITION, BOTH SIDES, TYP. (RE: SPECIFICATIONS) 5. INSTALL NEW DRAIN COVERS ON EXISTING FLOOR INSTALL NEW DRAIN COVERS ON EXISTING FLOOR DRAIN, TYP. 6. BASE ITEM: RE-INSTALL SALVAGED SHOWER VALVE BASE ITEM: RE-INSTALL SALVAGED SHOWER VALVE AND HEAD. OPTIONAL ITEM: INSTALL NEW SHOWER VALVE AND HEAD. 7. OPTIONAL ITEM: RUN NEW HOT AND COLD WATER OPTIONAL ITEM: RUN NEW HOT AND COLD WATER LINES FROM WATER HEATER TO NEW SHOWER VALVES. RUN LINES CONCEALED IN ATTIC AND EXPOSED ALONG SHOWER WALLS. RUN 3/4" MAINS AND 1/2" BRANCH LINES TO EACH FIXTURES. (LINES NOT SHOWN). 8. RE-INSTALL ALL SHOWER ROOM ACCESSORIES.RE-INSTALL ALL SHOWER ROOM ACCESSORIES.

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

(NO SCALE)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text GENERAL NOTES: 1. INFORMATION HAS BEEN TAKEN FROM LIMITED INFORMATION HAS BEEN TAKEN FROM LIMITED SITE VISITS AND FIELD OBSERVATIONS. FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY CO IMMEDIATELY SHOULD NOTIFY CO IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 7/17/17 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG 14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG14:42 LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG LCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWGLCARROLL O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG O:\NFS\R02\PROGRAM\7100ENGINEERING\CDI\JCORPS\FRENCHBURG_JCC\MULTI_BLDGS\2017 DORM_RR_RETROFITS\DWGS\FRENCHJCC_DORM_RR.DWG

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

L.CARROLL

AutoCAD SHX Text

D.BARROW

AutoCAD SHX Text 12/2017

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DORMITORY RESTROOM REHABILITATION 001500 – 1

FRENCHBURG JOB CORPS CCC LIST OF DRAWINGS AND SPECIFICTIONS

SECTION 001500

FRENCHBURG JOB CORPS CCC

DORMITORY RESTROOM REHABILITATION

LIST OF DRAWINGS AND SPECIFICATIONS

PART 1 – GENERAL

1.1 DESCRIPTION

A. List of Contract Drawings:

1. Index of Sheets:

Sheet Number Sheet Title Building T0.1 Title Sheet and Index General

A1.1 Demolition Plan Dormitory 1 – Building 137 A1.2 Rehabilitation Plan Dormitory 1 – Building 137 A2.1 Demolition Plan Dormitory 2 – Building 135 A2.2 A3.1 A4.1

Rehabilitation Plan Dormitory 2 – Building 135 Photographs Shower Pan Detail

7 Total Plan Sheets in this Contract

B. List of Contract Specifications

2. Index of Specifications

DIVISION 1 - GENERAL REQUIREMENTS

Section 001500 List of Drawings and Specifications Section 010150 General Requirements

DIVISION 23 – MASONRY

Section 041200 Shower Pan Assembly

DIVISION 9 – FINISHES

Section 093000 Tiling Section 097000 Special Flooring

DORMITORY RESTROOM REHABILITATION 001500 – 2

FRENCHBURG JOB CORPS CCC LIST OF DRAWINGS AND SPECIFICTIONS

DIVISION 10 – SPECIALTIES

Section 102113 Shower Compartments

DIVISION 22 - PLUMBING

Section 220000 Plumbing Materials and Methods

DORMITORY RESTROOM REHABILITATION 010150 – 1

FRENCHBURG JOB CORPS CCC GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses and permits for the work summarized as follows:

1. Demolition and rehabilitation of shower room finishes within 2 dormitories. Work includes approximately 220 square feet of floor tile replacement and approximately 250 square feet of wall tile replacement per dormitory. The project also contains numerous Optional Items that will be awarded if funding permits.

B. This project is located at the Frenchburg Job Corps Center. The campus is located approximately 10 miles from Frenchburg, KY. The address is: 6969 Tarr Ridge Rd, Frenchburg, KY 40322.

1.2 USE OF PREMISES

A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Full Government Occupancy: Government will occupy the sleeping rooms within the dormitories, but will not occupy the restrooms. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.

C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.3 PROJECT SCHEDULING

A. Schedule work to minimize impacts to government and students.

1.4 WORK RESTRICTIONS

DORMITORY RESTROOM REHABILITATION 010150 – 2

A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.5 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

1.6 FIELD VERIFICATION

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

PART 2 – DEFINITION OF ITEMS AND PAYMENT

2.1 DESCRIPTION

A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends and another begins; and basis of payment for work items listed in the Schedule of Items.

B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.

2.2 SCHEDULE OF ITEMS

A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items.

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

3. Optional Items will be awarded based on available project funding.

B. Base Items (BI):

1. Base Item No. 1- Dormitory 135 Restroom Rehabilitation

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, demolition, labor and incidentals to install a waterproof shower pan system on the floor, install cement backer board, remove and install 250 square feet of wall tile, and remove approximately 220 square feet of floor tile. Location of wall tile work begins at 3 feet above floor and ends at floor.

DORMITORY RESTROOM REHABILITATION 010150 – 3

2. Base Item No. 2 – Dormitory 137 Restroom Rehabilitation

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, demolition, labor and incidentals to install a waterproof shower pan system on the floor, install cement backer board, remove and install 250 square feet of wall tile, and remove approximately 220 square feet of floor tile. Location of wall tile work begins at 3 feet above floor and ends at floor.

3. Base Item No. 3- Dormitory 135 Floor Tile includes all materials, equipment, labor and incidentals to install approximately 220 square feet of floor tile. This item will be deleted if Optional Item OI7 is awarded.

4. Base Item No. 4 – Dormitory 137 Floor Tile

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to install approximately 220 square feet of floor tile. This item will be deleted if Optional Item OI7 is awarded.

C. Optional Items (OI):

1. Optional Item No. 1- Dormitory 135 Shower Plumbing and Valves includes all materials, equipment, demolition, labor and incidentals to re-plumb and install new valves in the showers.

2. Optional Item No. 2 - Dormitory 137 Shower Plumbing and Valves includes all materials, equipment, demolition, labor and incidentals to re-plumb and install new valves in the showers.

3. Optional Item No. 3 - Dormitory 135 Shower Partitions includes all materials, equipment, demolition, labor and incidentals to remove the concrete masonry partition walls and install partitions in the shower areas.

4. Optional Item No. 4 - Dormitory 137 Shower Partitions includes all materials, equipment, demolition, labor and incidentals to replace the partitions in the shower areas.

5. Optional Item No. 5- Dormitory 135 Additional Wall Tile Replacement

DORMITORY RESTROOM REHABILITATION 010150 – 4

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, demolition, labor and incidentals to install cement backer board and remove and replace approximately an additional 400 square feet of wall tile. Location of work begins at ceiling and ends at 3 feet above floor.

6. Optional Item No. 6- Dormitory 137 Additional Wall Tile Replacement includes all materials, equipment, demolition, labor and incidentals to install cement backer board remove and replace approximately an additional 400 square feet of wall tile. Location of work begins at ceiling and ends at 3 feet above floor.

7. Optional Item No. 7- Dormitory 135 Epoxy Floor includes all materials, equipment, labor and incidentals to install an epoxy floor and cove system, approximately 250 square feet in size. This item will be not be awarded if BI3 is awarded.

8. Optional Item No. 8- Dormitory 137 Epoxy Floor includes all materials, equipment, labor and incidentals to install an epoxy floor and cove system, approximately 250 square feet in size. This item will be not be awarded if BI4 is awarded.

PART 3 – ACCIDENT PREVENTION

3.1 DESCRIPTION

A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.

3.2 SUBMITTALS

A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. Notice to proceed will not be made until the plan is received. As a minimum the plan shall include:

1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.

2. Name and contact information of supervisor responsible to carry out the plan.

3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, DORMITORY RESTROOM REHABILITATION 010150 – 5 government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.

B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

D. Submit a brief report of safety meetings and of inspections.

E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

3.3 QUALITY ASSURANCE

A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.

3.4 ACCIDENT REPORTING

A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.

B. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.

3.5 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the type of construction at the site.

3.6 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

3.7 EMERGENCY INSTRUCTIONS

DORMITORY RESTROOM REHABILITATION 010150 – 6

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3.8 PROTECTIVE EQUIPMENT

A. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3.9 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

3.10 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.

3.11 TRAINING

A. First Aid: Provide adequate training to ensure prompt and efficient first aid.

B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

PART 4 – SUBMITTAL PROCEDURES

4.1 DESCRIPTION

A. This section includes administrative and procedural requirements for submittals.

4.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.

DORMITORY RESTROOM REHABILITATION 010150 – 7

B. Informational Submittals: Written information that does not require CO's approval.

Submittals may be rejected for not complying with requirements.

4.3 PROCEDURES

A. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 10 working days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

B. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 2 by 3 inches on label or beside title block to record

Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Other necessary identification.

C. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

D. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

E. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

F. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

DORMITORY RESTROOM REHABILITATION 010150 – 8

G. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

H. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

I. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

4.4 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

4.5 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and

DORMITORY RESTROOM REHABILITATION 010150 – 9

certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

B. Contractor's Construction Schedule: Provide a construction schedule.

C. Cost Breakdown: Following award provide a cost breakdown schedule listing main types of work with associated costs for each bid item.

PART 5 – TEMPORARY FACILITIES AND CONTROLS

5.1 DESCRIPTION

A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.

5.2 UTILITIES

A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.

D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.

5.3 STORAGE AREAS

A. Coordinate on-site storage requirements with the Contracting Officer.

5.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.

5.5 SUPPORT FACILITIES INSTALLATION

A. Locate temporary construction and support facilities for easy access.

DORMITORY RESTROOM REHABILITATION 010150 – 10

5.6 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.