Attachment_6_-_Seed_Project_6_-_Lighting_Upgrades.pdf

PDF 5 MB Posted

Attached to
Washington State - Forest Service Job Corps Centers - Multi-Award Construction and Facility Maintenace and Repair Services ID/IQ
Solicitation number
1282A718R0004
Issued by

About this file

Attachment 6 - Seed Project 6

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Solicitation – 1282A718R0004

Seed Project 6 – Miscellaneous Exterior Lighting Upgrades

Fort Simcoe Job Corps Center White Swan, WA 98952

Yakima County, Washington

Item Method of No. Description Measurement Total

BASE ITEM

001 Gymnasium and Education Wall Pack Lump Sum $ Luminaires

002 Photovoltaic Site Lighting Lump Sum $

003 Basketball Court Light Fixture Replacement Lump Sum $

004 Baseball Field Light Fixture Replacement Lump Sum $

005 Skate Park Light Fixture Replacement Lump Sum $

BASE ITEM TOTAL $

OPTIONAL/ADDITVE ITEMS – Subject to Availability of Funding

006 Basketball Court Pole and Light Fixture Lump Sum $ Replacement*

007 Baseball Field Pole and Light Fixture Lump Sum $ Replacement*

008 Skate Park Pole and Light Fixture Lump Sum $ Replacement*

OPTIONAL ITEMS TOTAL $

BASE AND OPTIONAL/ADDITIVE ITEMS TOTAL $

Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

* Note: If any of the Optional Line Items 006 – 008 are awarded, they will be awarded instead of the respective Line Items 003 – 005.

FAR 36.204 Disclosure of the magnitude of construction projects (Tailored)

The Government’s estimate is:

Between $100,000 and $260,000 for Base Items

Between $250,000 and $500,000 for first two (2) Base Items and all Optional/Additive Items

MISCELLENEOUS EXTERIOR LIGHTING UPGRADES 001500-1

FORT SIMCOE JOB CORPS CCC LIST OF DRAWINGS AND SPECIFICATIONS

SECTION 001500

FORT SIMCOE JOB CORPS CCC

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES

LIST OF DRAWINGS AND SPECIFICATIONS

PART 1 – GENERAL

1.1 DESCRIPTION

A. List of Contract Drawings:

1. Index of Sheets:

SHEET NUMBER SHEET NAME

T1.0 Title Sheet & Drawing Index

E0.1 Site Plan

E0.2 Photographs

E1.0 Common Area Site Lighting Plan

E2.0 Gymnasium and Education Lighting Plans

E3.0 Basketball Court Lighting Layout

E4.0 Baseball Field Lighting Layout

E5.0 Skate Park Lighting Layout

E6.0 Details and Luminaire Schedules

9 TOTAL SHEETS IN CONTRACT

MISCELLENEOUS EXTERIOR LIGHTING UPGRADES 001500-2

FORT SIMCOE JOB CORPS CCC LIST OF DRAWINGS AND SPECIFICATIONS

B. List of Contract Specifications

1. Index of Specifications

DIVISION 1 - GENERAL REQUIREMENTS

Section 001500 List of Drawings and Specifications Section 010150

General Requirements

DIVISION 3 – CONCRETE

Section 033053 Miscellaneous Cast-In-Place Concrete

DIVISION 26 – ELECTRICAL

Section 260000 Section 261100 Section 261111

Electrical Materials and Methods Solar Powered Site Lighting Sports Lighting System

END OF SECTION 001500

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 1

FORT SIMCOE JOB CORPS CCC GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight and delivery and all necessary valid licenses and permits for the work summarized as follows:

1. Installation of poles and photovoltaic area lighting in Common Area.

2. Installation of wall pack luminaires on two buildings.

3. Demolition of existing sports area lighting fixtures and poles.

4. Supply and Installation of LED site lighting fixtures and poles.

1.2 LOCATION

A. This project is located at the Ft. Simcoe Job Corp Center campus located approximately 5 miles west of White Swan, Washington. The address is 40 Abella Lane, White Swan, Washington, 98952. Driving directions can be obtained by calling the Center at 509.874.2244.

1.3 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the site is approximately 970 feet above mean sea level. The construction site is typically dry. Some snow is typical during winter months.

1.4 USE OF PREMISES

A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Full Government Occupancy: Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.

C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

1. Schedule deliveries to minimize use of driveways and entrances.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 2

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.5 WORK RESTRICTIONS

A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.6 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

1.7 FIELD VERIFICATION

A. Field verify all new and existing conditions affecting the work of this contract before ordering products.

1.8 PERMITS

A. State Electrical Inspection is required for this project. Obtain permits for electrical work if the State Electrical Inspector requires a permit to do the inspection.

PART 2 – DEFINITION OF ITEMS AND PAYMENT

2.1 DESCRIPTION

A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends and another begins; and basis of payment for work items listed in the Schedule of Items.

B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.

2.2 SCHEDULE OF ITEMS

A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items.

1. Provide pricing for all items listed in the Schedule of Items.

2. One item will be awarded per sports site (Basketball, Baseball, and Skate Park).

3. If an Optional Item is awarded, it will be in lieu of a Base Item.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 3

B. Base Items (BI):

1. Base Item No.1 – Gymnasium and Education Wall Pack Luminaires

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the existing wall pack luminaires on the Gymnasium and install new wall packs on the Gymnasium and Education Buildings. This item also includes electrical and wiring needed for the luminaires on the Education Building.

This item also includes general conditions for the project.

2. Base Item No.2 – Common Area Photovoltaic Site Lighting

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to install poles and photovoltaic site lighting in the Common Area.

3. Base Item No.3 – Basketball Court Light Fixture Replacement

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the existing light fixtures and install new LED light fixtures on the existing poles.

4. Base Item No.4 – Baseball Field Light Fixture Replacement

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the existing light fixtures and install new LED light fixtures on the existing poles.

5. Base Item No.5 – Skate Park Light Fixture Replacement

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the existing light fixtures and install new LED light fixtures on the existing poles.

C. Optional Items (OI):

1. Optional Item No.1 – Basketball Court Pole and Light Fixture Replacement

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 4

existing light fixtures and poles and install new LED light fixtures and poles.

This item also includes extension of wiring and conduit needed from the original pole and fixture locations to the new fixture locations. If this item is awarded, Base Item 3 will not be awarded.

2. Optional Item No.2 – Baseball Field Pole and Light Fixture Replacement

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the existing light fixtures and poles and install new LED light fixtures and poles.

This item also includes extension of wiring and conduit needed from the original pole and fixture locations to the new pole and fixture locations. If this item is awarded, Base Item 4 will not be awarded.

3. Optional Item No.3 – Skate Park Pole and Light Fixture Replacement

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove the existing light fixtures and poles and install new LED light fixtures and poles.

This item also includes extension of wiring and conduit needed from the original pole and fixture locations to the new pole and fixture locations. If this item is awarded, Base Item 5 will not be awarded.

PART 3 – ACCIDENT PREVENTION

3.1 DESCRIPTION

A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.

3.2 SUBMITTALS

A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. A Notice to Proceed will not be issued until the plan is received. As a minimum the plan shall include:

1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.

2. Name and contact information of supervisor responsible to carry out the plan.

3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 5

4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.

B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

D. Submit a brief report of safety meetings and of inspections.

E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

3.3 QUALITY ASSURANCE

A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.

3.4 ACCIDENT REPORTING

A. Accidents: Report all accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.

3.5 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the type of construction at the site.

3.6 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

3.7 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3.8 PROTECTIVE EQUIPMENT

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 6

A. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3.9 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

3.10 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.

3.11 TRAINING

A. First Aid: Provide adequate training to ensure prompt and efficient first aid.

B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

PART 4 – SUBMITTAL PROCEDURES

4.1 DESCRIPTION

A. This section includes administrative and procedural requirements for submittals.

4.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.

B. Informational Submittals: Written information that does not require CO's approval.

Submittals may be rejected for not complying with requirements.

4.3 PROCEDURES

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 7

A. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 10 working days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

B. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 2 by 3 inches on label or beside title block to record

Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Other necessary identification.

C. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

D. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

E. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

F. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

G. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 8

H. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

I. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

4.4 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

4.5 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

B. Contractor's Construction Schedule: Provide a construction schedule.

C. Cost Breakdown: Following award provide a cost breakdown schedule listing main types of work with associated costs for each pay item.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 9

PART 5 – TEMPORARY FACILITIES AND CONTROLS

5.1 DESCRIPTION

A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.

5.2 UTILITIES

A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.

D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction. Typical cell phone coverage in this area is not reliable.

5.3 STORAGE AREAS

A. Coordinate on-site storage requirements with the Contracting Officer.

5.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.

5.5 SUPPORT FACILITIES INSTALLATION

A. Locate temporary construction and support facilities for easy access.

5.6 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 10

B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights.

C. Fire Protection:

1. Store combustible materials in containers in fire-safe locations.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 6 – EXECUTION REQUIREMENTS

6.1 DESCRIPTION

A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:

1. General installation of products.

2. Progress cleaning.

3. Protection of installed construction.

4. Correction of the Work.

6.2 EXAMINATION

A. Existing Conditions: Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.

B. Acceptance of Conditions: Examine areas, and conditions, with Installer. Record observations.

1. Examine roughing-in for electrical systems to verify actual locations of connections before equipment and fixture installation.

2. Proceed with installation only after unsatisfactory conditions have been corrected.

Proceeding with the Work indicates acceptance of surfaces and conditions.

6.3 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly.

B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.

Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 11

6.4 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

B. Comply with manufacturer's written instructions and recommendations for installing products.

C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

6.5 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

D. Waste Disposal: Burying or burning waste materials on-site will not be permitted.

Washing waste materials down sewers or into waterways will not be permitted.

6.6 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

6.7 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 12

PART 7 – OPERATIONS AND MAINTENANCE MANUALS

7.1 DESCRIPTION

A. This Section consists of administrative and procedural requirements for operation and maintenance manuals.

7.2 SUBMITTALS

A. Submit two manuals in final form at least 15 working days before final inspection.

7.3 MAINTENANCE MANUALS

A. Assemble a complete set of maintenance data. Include maintenance data required in individual Specification Sections and as follows:

1. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.

B. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents.

C. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual.

2. Name and address of Project.

3. Name and address of Job Corps.

4. Date of submittal.

5. Name, address, and telephone number of Contractor.

6. Cross-reference to related systems in other operation and maintenance manuals.

D. Table of Contents: List each product included in manual, identified by product name, indexed to content of volume, and cross-referenced to Specification Section.

E. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 13

a. Identify each binder on front and spine, with printed title " MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

F. Content: Include maintenance data required in individual Specification Sections and equipment descriptions.

G. Descriptions: Include the following:

1. Product name and model number.

2. Manufacturer's name.

3. Equipment identification with serial number of each component.

4. Operating characteristics.

5. Complete nomenclature and number of replacement parts.

H. Source Information: For each product, list name, address, and telephone number of Installer or supplier.

I. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.

Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

PART 8 – CLOSEOUT PROCEDURES

8.1 DESCRIPTION

A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Project Record Documents.

3. Final cleaning.

8.2 SUBSTANTIAL COMPLETION

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 14

A. Definition of Substantial Completion: The Date certified by the Contracting Officer when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Contracting Officer (CO) of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, and similar final record information.

6. Complete final cleaning requirements, including touchup painting.

7. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

8.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 15

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

8.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

8.5 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 010150

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 010150 – 16

THIS PAGE IS INTENTIONALLY LEFT BLANK

MISCELLANEOUS LIGHTING UPGRADES 260000 – 1

FT. SIMCOE JOB CORPS CCC ELECTRICAL MATERIAL AND

METHODS

SECTION 260000

ELECTRICAL MATERIAL AND METHODS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes electrical requirements and materials for a complete electrical system including the following:

1. Raceways.

2. Building wire and connectors.

3. Wall pack luminaires.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to Division 26 Sections

1.3 QUALITY ASSURANCE

A. Worker's Qualifications: All electrical work shall be performed by licensed electricians or under the direct supervision of a licensed electrician in the state of Washington.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in

NFPA 70.

C. Provide products that are UL listed and labeled.

D. Codes and Regulations:

1. All work shall meet requirements of governing codes and regulations, NFPA 70-

2017 (NEC).

2. The electrical installation shall meet the requirements of NECA Standard of Installation, except where otherwise specified. Advise the Contracting Officer of conflicting codes or conflicts between codes and drawings and specifications.

3. When the requirements of specifications or drawings are more stringent than the codes, regulations, or standards, the specifications or drawings shall prevail.

E. UL Listing: Provide products that are UL listed and labeled.

1. Grounding: Applicable requirements of UL Standards Nos. 467, “Electrical

Grounding and Bonding Equipment,” pertaining to grounding and bonding of

MISCELLANEOUS LIGHTING UPGRADES 260000 – 2

systems, circuits, and equipment. In addition, compliance with UL Standard 486A, “Wire Connectors.”

F. IEEE Compliance: Applicable requirements and recommended installation practices of IEEE Standards pertaining to grounding and bonding of systems, circuits, and equipment.

1.4 PERMITS

A. State electrical inspection is required on this project. Obtain a state electrical permit if a permit is required in order to do the inspection.

1.5 INTENT OF CONSTRUCTION DRAWINGS

A. Electrical drawings do not attempt to show complete details of building construction that affect installation. Diagrams are schematic only and do not necessarily show physical arrangement of equipment.

1.6 SUBMITTALS

A. As specified in Division 1 Section “Submittal Procedures.”

1. Product Data: Submit manufacturer’s product literature for the following items:

a. Conduit, raceways, and fittings.

b. Wire and cable.

c. Wall pack luminaires.

2. Sample Warranty for wall pack luminaires.

1.7 CLOSEOUT SUBMITTALS

A. As specified in Division 1 Section “Closeout Procedures.”

1. Operation and Maintenance data for wall pack luminaires.

2. Sample Warranty for wall pack luminaires.

PART 2 – PRODUCTS

2.1 RACEWAYS

A. Metal Conduit:

1. RMC: Rigid metal conduit; galvanized rigid steel; ANSI C80.1.

2. Fittings and Conduit Bodies: ANSI/NEMA FB 1; material to match conduit.

MISCELLANEOUS LIGHTING UPGRADES 260000 – 3

B. EMT: Electrical metallic tubing; ANSI C80.3, zinc-coated steel.

1. Fittings and Conduit Bodies: ANSI/NEMA FB 1; steel compression type.

C. RNC: Rigid nonmetallic conduit; NEMA TC 2, Schedule 80 PVC.

1. Fittings and Conduit Bodies: NEMA TC 3.

D. Bushings: Insulated type bushings designed to prevent abrasion of wires without im-pairing the continuity of the conduit grounding system comprised of rigid steel con-duit. Provide locking type grounding bushings with a feed-through compression lug.

E. Expansion Fittings: Rigid hot-dipped galvanized steel or malleable iron with factory-installed packing and grounding ring.

1. Rigid non-metallic conduit expansion fittings: Provide short type for runs 25 feet or less and long type in runs 26 to 80 feet.

a. Short Type: One-piece coupling with O ring providing 2 inches of total movement range in 1/2-inch to 2-inch conduit sizes.

b. Long Type: Two piece barrel and piston joint providing 6 inches of total movement range in 1/2-inch to 6-inch conduit sizes.

F. Sealing Fittings: Threaded, zinc or cadmium coated, cast or malleable iron type for steel conduits. Provide continuous drain type when fittings are used to prevent pas-sage of water vapor.

2.2 WIRE AND CABLE

A. Feeders and Branch Circuits: Copper, stranded conductor, 600 volt insulation, Type THW, THHN/THWN depending on application.

B. Feeders and Branch Circuits (for direct bury): Copper, stranded conductor, 600 volt insulation, Type USE or UF.

2.3 LUMINAIRES

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. McGraw-Edison.

2. Or Equal.

B. General requirements for wall pack fixtures:

MISCELLANEOUS LIGHTING UPGRADES 260000 – 4

1. Housing: Heavy wall, die-cast aluminum and removable hinged door frame.

2. Finish: Five-stage TGIC polyester powder coat paint, 2.5 mil.

3. End plates (if applicable): Injection molded to match housing finish.

4. Mounting: Surface, gasketed and zinc plated rigid steel mounting attachment.

5. Listed for wet locations.

6. Warranties: 5 year.

7. Options:

a. Tamper resistant torx head fasteners. Suitable for wet locations (if appli-cable).

b. Photocontrol.

2.4 LAMPS

A. Provide lamps for each fixture of the type, size, color, wattage, and voltage as shown.

B. LED Modules (Optional Item):

a. CRI = 70 minimum.

b. Rate Average Life: 95% LED lumen maintenance at 60,000 hours.

PART 3 – EXECUTION

3.1 EXAMINATION

A. Field verify measurements and circuiting arrangements.

B. Field check all existing conditions prior to beginning work.

3.2 ELECTRICAL REMOVAL AND EXTENSION OF EXISTING ELECTRICAL

WORK

A. Disconnect, demolish, and remove electrical systems, equipment, and components in-dicated to be removed.

1. Circuits to Be Removed: Remove portion of circuits, including conductors and conduit, indicated to be removed to source of supply. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets which are not removed.

2. Equipment to Be Removed: Disconnect equipment. Remove circuit to source of supply where circuit is indicated to be removed. Temporarily terminate con-ductors in a safe manner where circuit will be reattached to new equipment or devices. Remove equipment.

MISCELLANEOUS LIGHTING UPGRADES 260000 – 5

B. Verify that abandoned wiring and equipment serve only abandoned facilities. Main-tain electrical continuity to remaining wiring and equipment.

C. If during construction electrical conductors, conduits, or equipment to remain is dam-aged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.

D. If shutdown of any portion of the existing electrical service is necessary, notify the Contracting Office at least 36 hours prior to desired date and time of shutdown.

Shutdown shall not be for more than 8 hours.

E. Where the reuse of existing conduits, outlets, junction boxes, etc. is permissible, make certain that the wiring for them is continuous from outlet to outlet.

F. Repair adjacent construction and finishes damaged during demolition and extension work. Provide modifications to assure that circuits or systems wiring shall not pass through outlet or junction boxes that may be rendered inaccessible by changes made to the building.

G. Connect new work to existing work in a manner that will assure proper raceway grounding throughout in conformance with the National Electrical Code.

H. Removed conduits, wire, devices, fixtures, etc. is the property of the Contractor unless otherwise noted.

3.3 ELECTRICAL EQUIPMENT INSTALLATION

A. Materials and Components: Install level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated.

B. Equipment: Install to facilitate service, maintenance, and repair or replacement of components. Connect for ease of disconnecting, with minimum interference with other installations.

3.4 RACEWAY APPLICATION

A. Minimum Conduit Size, unless otherwise shown or specified:

1. Homeruns: Minimum 1/2-inch.

B. Indoor Locations: EMT.

C. Outdoor Locations, Above Grade: RMC.

D. Underground Installations: Schedule 80 PVC.

MISCELLANEOUS LIGHTING UPGRADES 260000 – 6

3.5 RACEWAY INSTALLATION

A. Install raceways in accordance with NECA “Standard of Installation” and manufacturer’s recommendations.

B. Route exposed raceways parallel and perpendicular to walls.

C. Run raceway plumb, level, and in a direct line, with long sweeping bends and offsets.

Make changes in direction of raceway with symmetrical bends or metal fittings.

D. Keep legs of raceway bends in the same plane and keep straight legs of offsets parallel.

E. Maintain 12-inch clearance between conduit and surfaces with temperatures exceeding 1040F.

F. Use conduit hubs or sealing locknuts to fasten conduit to sheet metal boxes and cast boxes in damp and wet locations.

G. Install no more than equivalent of four 90-degree bends between boxes. Use conduit bodies to make sharp changes in direction.

H. Transition from underground PVC to above grade RMC or EMT below slab with a rigid PVC coated conduit elbow.

I. Securely mount raceway using manufactured supports, connectors, and securing devices.

J. Underground Conduit:

1. Install minimum depth to top of underground conduit in accordance with NEC unless otherwise indicated.

2. Install underground conduit with watertight joints.

3.6 WIRE AND CABLE METHODS

A. Conductor Size:

1. Meet requirements of NFPA 70. Use no wire smaller than No. 12 AWG for power and lighting circuits, and no smaller than No. 16 AWG for control wiring.

B. Wire and Cable Application: Use wiring and cabling methods specified below to the extent permitted by applicable codes.

1. Interior and Exterior Locations: THHN-THWN single conductors in raceway.

2. Underground: THHN-THWN single conductors in raceway or direct bury wire.

MISCELLANEOUS LIGHTING UPGRADES 260000 – 7

3.7 GROUNDING

A. Route grounding connections, conductors to ground, and grounding conductors to protective devices in the shortest and straightest path possible to minimize transient voltage rises.

B. Provide a corrosion-resistant finish to field connections, buried metallic bonding products, and where factory applied protective coatings have been destroyed.

C. Equipment Grounding Conductors: Comply with NEC for types, sizes, and quantities of equipment grounding conductors, unless specific types, larger sizes, or more conductors than required by NFPA 70 are indicated.

D. Connections: Make connections so galvanic action or electrolysis possibility is minimized. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact will be galvanically compatible.

1. Equipment Grounding Conductor Terminations: For No. 8 AWG and larger, use pressure-type grounding lugs.

2. Moisture Protection: If insulated grounding conductors are connected to ground rods or grounding buses, insulate entire area of connection and seal against moisture penetration of insulation and cable.

E. Field Welding:

1. Make exothermic-welded connections where grounding conductors connect to underground grounding conductors and to underground grounding electrodes, and for bonding to steel.

2. Exothermic weld all underground connections.

3.8 LUMINAIRE INSTALLATION

A. Connect new lighting fixtures to existing power and switch wiring where existing power exists. Run new wiring in conduit where no power currently exists.

B. Set level, plumb, and square with ceilings and walls.

C. Mount at approved heights, adjusting fixture locations to avoid space conflicts.

Securely support fixtures, attaching to outlet box if box is adequately supported.

Support suspended fixtures by metal stems or cables that hang level in same horizontal plane.

D. Flush and recessed fixtures without integral outlet box shall have tap connection conductor, with insulation rated for 90 degrees C, run from fixture terminal connection to an outlet box at least 1 foot from fixture. Tap shall be between 4 and 6 feet long in metallic raceway.

MISCELLANEOUS LIGHTING UPGRADES 260000 – 8

E. Arrange wiring within fixtures neatly and protect from damage. Protect conductor insulation from abrasion where it passes through metal using chase nipples or equivalent.

3.9 INSTALLATION OF NEW POLES AND SPORTS LIGHTING LUMINAIRES

(OPTIONAL ITEM)

A. Set new poles level and plumb. Distance of pole to be buried in the ground to be in ac-cordance with reviewed and approved drawing submittals.

B. Extension of electrical service from original pole location: Run horizontal wiring un-derground in PVC conduit. Run vertical wiring exposed, anchored to pole, in RMC.

3.10 LENS, ENCLOSURES AND LAMPS

A. Clean and install just before final inspection.

B. Install lamps in all fixtures.

3.11 ADJUST AND CLEAN

A. Touch-up scratched or marred enclosure surfaces to match original finishes.

3.12 FIELD QUALITY CONTROL

A. Correct defective and malfunctioning units on-site, where possible, and re-inspect and retest to demonstrate compliance; otherwise, remove and replace with new units and retest.

END OF SECTION 260000

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 261100 – 1

FT. SIMCOE JOB CORPS CCC SOLAR POWERED SITE LIGHTING

SECTION 261100

SOLAR POWERED SITE LIGHTING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes electrical requirements and materials for a solar (photovoltaic) site lighting, including the following:

1. Pole and accessories for support of luminaires.

2. Luminaires.

3. All components necessary for a complete installation.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to Division 26 Sections.

1.3 QUALITY ASSURANCE

A. Worker's Qualifications: All electrical work shall be performed by licensed electricians or under the direct supervision of a licensed electrician in the state of Washington.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in

NFPA 70.

C. Provide products that are UL listed and labeled.

D. Electrical Codes and Regulations:

1. All work shall meet requirements of governing codes and regulations, NFPA 70-

2017 (NEC).

E. UL Listing: Provide products that are UL listed and labeled.

Grounding and Bonding Equipment,” pertaining to grounding and bonding of systems, circuits, and equipment. In addition, compliance with UL Standard 486A, “Wire Connectors.”

MISCELLANEOUS EXTERIOR LIGHTING UPGRADES 261100 – 2

F. IEEE Compliance: Applicable requirements and recommended installation practices of IEEE Standards pertaining to grounding and bonding of systems, circuits, and equipment.

G. Structural Requirements:

1. Poles and other support structures, brackets, arms, bases, anchorages, and foun-dations, shall be determined based on AASHTO LTS-5, exposure category C, Importance factor of 1.0.

2. Structural Design: The stress analysis and safety factor of the poles shall con-form to AASHTO Specifications for Structural Supports for Highway Signs, Lu-minaries and Traffic Signals.

3. Soil conditions: A geotechnical report has not been performed and is not part of this contract. The foundation design shall be based on soils that meet or exceed those of a Class 5 material as defined by the 2015 International Building Code, Table 1806.2.

1.4 INTENT OF CONSTRUCTION DRAWINGS

A. Electrical drawings do not attempt to show complete details that affect installation.

Diagrams are schematic only and do not necessarily show physical arrangement of equipment.

1.5 LIGHTING PERFORMANCE

A. An average 0.5 footcandle (+/-10%) illuminance is required on all common area side-walks.

1.6 STRUCTURAL INFORMATION

A. Location:

1. Latitude = 46.3385, Longitude = -120.8549.

B. ASCE 7-10 Windspeeds:

1. Risk Category I: 100

2. Risk Category II: 110

3…